#H.P. State Electricity Board
Explore tagged Tumblr posts
Text
Katgaon Village: A Jewel in Bhaba Valley | Kinnaur
Katgaon Village, nestled in the serene Bhaba Valley of Kinnaur District, Himachal Pradesh, is a place of mesmerizing beauty and rich cultural heritage. Known for the revered Temple of Mahadeo, Katgaon is not just a spiritual haven but also a vibrant community. Approximately 205 kilometers from Shimla and around 80 kilometers from Rampur, Katgaon offers a unique blend of tradition and modernity.…
View On WordPress
#Bhaba Khad#Bhaba valley#Bhaba Valley of Kinnaur District#cultural heritage#H.P. State Electricity Board#Katgaon#Katgaon Village#Kinnaur#rampur#Shimla#spiritual significance#Sutlej River#Temple of Mahadeo
0 notes
Text
May Day, May Day, May Day
Last May, the world continued to fall apart, as it's been doing for many years – though at a noticeably accelerated pace. The coronavirus dictated everyone's life and kept me mostly in my apartment in Franklin Village, living a life that was just like my normal life, only moreso. I played video games (but for more hours at a time), watched movies (but more than usual), and read books (but longer books, like Ulysses and the last Karl Ove Knausgaard novel, that were too heavy to have carried around and read while commuting). I did a lot of new writing and got a few rejections for some old writing. Just as I had seven years earlier, I began to wish I had a piano – as my apartment’s previous tenant, singer-songwriter Rebecca Black, did – so I could pass my downtime creating something nice.
The May before that, my writing partner and I submitted writing samples through the WGA Staffing System in the hopes of being hired to write for a sitcom. This job board had been set up by the Writer’s Guild to help writers find work without the assistance of their agents, whom the WGA had instructed its members to fire following a dispute with the Association of Talent Agents. My writing partner and I were skeptical that anybody (least of all us) would be hired through this system – we figured staffing decisions would still be determined by Hollywood’s impenetrable cliquishness – but we knew there was nothing to be lost by giving it a try.
On a Thursday, we submitted applications to three shows. Two of them were cancelled by Saturday – almost as if our applications reminded the producers that they still had dead shows to clear out – and we never heard back from the third.
The May before that, a paralegal left the law firm I work at in Downtown LA because he’d found a job closer to his home in Long Beach. My boss took him out to lunch, after which he returned to the office to say his goodbyes. He thanked me for teaching him some filing skills, but I had trouble accepting the gratitude. Even after six years, I still felt like a pretender in the legal world, skeptical that I knew anything teachable.
Later that afternoon, my boss informed the rest of us that, at lunch, the paralegal had asked him, “Do you wanna smoke some weed?” My boss had declined, noting that it was noon on a Wednesday. Our receptionist said that he had recently made the same offer to her. But an associate attorney and I had never been offered the same opportunity even once in the six months we worked with him.
The May before that, my pianist friend passed through LA and we met for lunch in Westwood. He was the first peer whose hair I noticed was going grey. Mine had been turning for a few years already. Good for both of us.
When I returned home, I played The Legend of Zelda: Breath of the Wild, an acclaimed game which shares a lot of its DNA with one predecessor in particular: The Wind Waker. I was happy to see that game’s achievements respected by this new installment in the series because I still felt the exact same protectiveness of and identification with The Wind Waker that I had 14 years earlier, no matter that I was getting old and grey.
The May before that, I received a rejection letter from a literary magazine for a short story that I had submitted for publication 14 months earlier. I also received a rejection from a literary agent for a novel I’d written. Neither one upset me too much: the short story because I’d completely forgotten it was out in the world; the novel because the agent sent me back thoughtful notes, and I was touched that anyone would even take the time to read 75,000 words I’d written. Plus, it was easy to brush off literary set-backs. I had just had made my first business trip to Hollywood, and I was confident I’d soon be working as a sitcom writer.
The May before that, I got a sharp pain in my back anytime I breathed in deeply. The internet said it was probably a strain in one of my intercostal muscles, but couldn’t rule out pneumonia or something scarier. Not wanting a repeat of seven years earlier, when I’d ignored ankle pain and wound up in surgery, I visited a doctor. She diagnosed it as a strained intercostal muscle and wrote me a prescription for anti-inflammatories, which I never picked up.
Three days later, my friends and I were sharing interesting quotations over email (Tuesdays we shared poetry, Wednesdays paintings, and Thursdays quotations). The last contribution was from H.P. Lovecraft: “The oldest and strongest emotion of mankind is fear, and the oldest and strongest kind of fear is fear of the unknown.”
The May before that, my roommates and I threw a party in our apartment. We invited 47 people and just about 47 people showed up. We had a great time until my landlord called me downstairs to show me that our front gate had been broken by one of our guests while departing. I esteemed my landlord so highly that there was little in life I hated more than disappointing him.
By the next morning, my roommates and I had determined who the culprit was, but we weren’t sure whether to ask him to pay up. While we weighed our options, I went to McCarren Park to attend a picnic hosted by a friend of mine from high school. I didn’t know any of the other guests, but I asked them whether, in my situation, they would reach out to the vandal and ask him to pay. They all said it was a tough call.
Ultimately, my roommates and I paid for the gate ourselves, swallowing the repair charge as the cost of hosting guests. As one of my roommates used to say when shrugging off his post-party hangovers, “You gotta pay the piper.”
The May before that, I wanted to resume playing the piano, so I made arrangements to buy an electric keyboard from a man who lived on the Upper East Side. I reached out to my only friend with a car – the same woman to whom I’d lost my virginity four years before – and asked if she would help me haul the equipment back to Bed-Stuy. She agreed on the condition that I would go with her to Rockaway Beach afterwards. Though the beach is my least favorite of all leisure destinations, I said sure and told her where to meet me.
She showed up to the Upper East Side without a car and without any understanding that I had expected her to bring a car. I had forgotten to ask for that, but it wouldn’t have made a difference: she hadn’t been vehicled for two years. I asked why she thought I would request her help with this chore, if not for her ability to bring a car. She asked why I hadn’t mentioned the car in my request, why I assumed she had one even though I had only seen her drive once, two years earlier, and where my gratitude was for her being willing to come out in 90-degree weather to help with such a tedious chore. Her rhetorical questions were better. We lugged the keyboard, its stand, its pedal, and a bunch of cords back to Brooklyn over two subway transfers and then went to the beach, where the temperature was about 40 degrees lower.
Even though the keyboard’s quality was affirmed by my (imminently greying) pianist friend when he came over for one of our parties, it didn’t scratch my itch the way a real piano would have. I kept it for three years until the speakers stopped working.
The May before that, I began working at a law firm in Midtown. I didn’t know how I landed the position, a phenomenon that’s repeated in every job I’ve got – or not got. Despite my supposed knowledge of film and TV, I’ve been turned down for writing jobs and even to work for Blockbuster. But I was hired to work at a venerable firm while knowing absolutely nothing about the law.
Between that respectable job and the largesse of my landlord, letting me live in Shangri-La for $600 per month, I spent my early-to-mid-twenties building unusual financial stability. I didn’t recognize it, though, and those were the years I was most worried about money. In the years before and since, financial anxiety was nothing; my worries were (are) about writing. And tidily, in that middle period, the creative side of life caused no concern.
The May before that, I graduated from NYU. More than any catastrophe I’ve lived through, that event created an atmosphere of the End of Days. Feelings of wistfulness and anxiety about casting off into the unknown were underscored by Collapse Into Now, the new R.E.M. album I was listening to repeatedly. It is a poignant record (though it wouldn’t be identified as such for another four months, it was secretly R.E.M.’s farewell album) but I was in an emotional state to be moved by any music. I couldn’t even join in the culture-wide mocking of Rebecca Black’s “Friday” that was going on; I found her earnestness unbearably touching.
At the end of the month, I moved into my new place in Bed-Stuy. My roommates and I had flipped for the apartment as soon as we saw it, not just because its competition wasn’t fierce – other prospective apartments had rat poison on the floor or 18-inch-high ceilings – but because it was spacious and cheap and distinctive, and because we liked the landlord. (And it went both ways: he told us that he had declined other possible tenants while waiting for our decision because, “I took a shine to you guys.”) And even though it was still a little strange to be sleeping and eating and showering in a new place, and even though a couple of teenagers had shouted at me while I was moving in – using what federal judges now call “racially charged language” – and even though I still had no idea how to shape a life outside of school, I felt better, because I was in My Home.
The May before that, I was finishing up a semester abroad in Ireland. At times during that spring, I compared myself to the freshman I’d been two and a half years earlier. I had been so naïve, so unworldly when I came to New York in 2007. Now, it was 2010 – a modern year, the dawn of a new decade – and I was 20 years old, living across the Atlantic. I had lived long enough to have a past, to have life behind me. I was a real person.
But if I ever had any specific examples of what made “Junior Year Me” more sophisticated than (or even different from) “Freshman Year Me,” I have completely forgotten them now. The two iterations are collapsed into one character in my mind. And when I see the numbers now, 20 as an age is much closer to the two decades before it than to the years that have come since, and 2010 looks like an absurdly miniscule year.
The May before that, I lost my virginity in a college dorm on 14th Street in Manhattan. It happened in the afternoon, after two failed attempts in prior evenings. The school year was winding down – when my girlfriend called to invite me over, I was packing up my dorm room, and when I arrived, her suitemate was in their common room, packing up her things – so there was no more room for error.
I recall looking at a digital clock, but I don’t recall what time it showed. Nor do I remember the weather, though I remember either being pleased that it was raining, or wishing that it were raining. For a redefining moment, it’s awfully hazy. The fog of war. I had to be reminded many, many years later that, after we finished, I offered a dirty joke that was extremely in and out of character: “I was packing boxes in my dorm, and then I came over here to pack boxes.”
Afterwards, I walked back to my dorm in the West Village. My friends and I had plans to watch a marathon of all of the videos we had filmed that year, and we did. It was several years before I told them where I had been earlier that day.
The May before that, I had an MRI on my ankle, which had been hurting for a year. After I left the hospital, I went to Blockbuster to interview for a summer job and absolutely bombed. I may have admitted that I only planned to keep the job until college resumed in September; I certainly volunteered that I knew nothing about high-traffic film genres like action or horror. When asked what movies I might recommend to customers, I offered artsy snoozers like Ed Wood.
Just as well that I was never offered a job, as the MRI showed that I had, “the ankle of a 70-year-old,” and arthroscopic surgery was scheduled. I spent the next two months first in a cast, then in a boot. I passed the summer making videos and uploading them to YouTube, thinking maybe I’d go viral, as I’d been hoping for two years. The most attention I got was from foot fetishists who liked when I showed my casted leg.
The May before that, my high school was shut down on what was supposed to have been my last real day of senior year. An AP Spanish Literature test and a band concert were scheduled for the day, after which I had no more obligations. But cafeteria workers coming in early in the morning spotted two masked men creeping through a hallway. The workers called the cops, the masked men fled, and the bomb squad was called in. School was closed for the day.
Had there been a bomb, this might be a disaster story known to lots of people of my generation. But there was no bomb, and it’s a story that even I forget most of the time. The general consensus was that the masked men were just students coming in early to set up some departing-senior stunt. They were never identified, though I was confident I knew who they were.
My test and my concert were rescheduled, so I had to keep going to school. The morning of the makeup AP exam, I told one of my classmates that I couldn’t help but wish we had been able to wrap up high school the week before, as anticipated. She cut me off and said, “You can’t even think about that.”
The May before that, YouTube penetrated mass consciousness. The notion of “going viral” was not known to us then, but it was still obvious how well the site could facilitate the spread of good work. I was certain that the videos my friends and I were making could be successful on there. We had so many funny ideas, it was inconceivable that not a single one of them would catch fire. Maybe not immediately, but it couldn’t take forever.
The May before that, Star Wars: Revenge of the Sith premiered. I disliked the previous movie, had forgotten the one before that, and was totally agnostic about the original trilogy, yet I convinced myself to be excited for this one: This is how a person interested in film should feel. My mom and I made plans to go as a treat after an afternoon laboring in the garden, and I invited a friend to come along.
My friend called back later in the day to ask if he could bring another kid from school to the movie. This other kid and I wound up growing closer in the last years of high school, but at the time, I still found him mean and unpredictable. I worried that he might laugh at me for still going to the movies with my mom, or worse, that he would act up in some distasteful way in front of her. My parents weren’t overly sensitive, but I was still haunted by a memory from a birthday party three years before: this kid seriously tasking my dad by telling an awful dirty joke. ("How do you circumcise a redneck?")
I lied to my friend and told him that the trip to the movies had been cancelled. Then I lied to my mom and told her that my friend had decided not to come. At the movie theater, I kept looking over my shoulder, worried that my friend might decide to come anyway (maybe even with the other kid), and I’d be caught. He didn’t, and the next day he asked if I still wanted to see the movie with him, so I watched Star Wars: Revenge of the Sith twice in two days.
The May before that, in Downtown LA (only a mile from the law firm where I’d be working 13 years later), Nintendo had a very successful presentation at the annual Electronic Entertainment Expo. At a time when its public reputation was shaky, Nintendo blew the roof off the Los Angeles Convention Center with a showcase of a new handheld, a new spokesman, and a new Legend of Zelda game. The previous entry, The Wind Waker, had drawn a lot of attention (mostly condemnation gradually giving way to praise) for its colorful, cel-shaded art style. This new game looked more subdued, realistic, and – in the parlance of the times – mature.
While I was excited by the new entry, I felt sad that it appeared to be such a blatant rejection of The Wind Waker, a game I had been defending against adolescent smears since before its release, a game I thought had proven itself to be a masterpiece. Yet here was Nintendo itself surrendering to the backlash and giving the haters exactly what they demanded. That wasn’t how the world was supposed to work, and I felt that I had been hung out to dry. These feelings were still with me more than a decade later when Breath of the Wild came along to close the circle.
The May before that, a blizzard hit Colorado. It was a spring snow, very wet and heavy, and it destroyed the plants that my mom had been adding to the yard since we moved in. She was in the house with my newborn brother, so my dad and I shoveled the walk. It was hard, slushy work, but I greatly preferred it to the lawn jobs and gardening I’d been doing over the preceding year. A private yard was supposedly one of the pleasures of living in a house rather than the apartments and condos we’d previously had, but it wasn’t worth the work that went into it. Visiting a public park or walking around the neighborhood was much more fun than sitting on your own boring lawn.
It wasn’t anything that would be relevant for eight years, and it wasn’t anything I was conscious of for longer than that, but I was developing a sense of what I dreamed would be My Home.
The May before that, my family was newly installed in our first house. Our old condo had been bought by a guy who ran an outdoor cinema over the summers, and he had given us three free passes. I went with two friends to see the second screening of the season, Airplane!
Before the show, one of my friends mentioned that he was going to be working that summer at his dad’s restaurant, and the other said he had been given a spot at his uncle’s factory (it made insulated water bottles). I felt left out, and wished that I could get work too. I wondered if there was a way I could leverage my knowing the man who ran the outdoor cinema into a job.
I remember that longing, yet I don’t remember how, two years later, I came to be working at the outdoor cinema. I have no record of who talked to whom and said what to get me that gig, the first of many positions I would get without knowing how. The job stayed on my resume until I went to work for the law firm in Midtown, but I’m not sure how useful it was. It wasn’t enough to get me in the fucking door at Blockbuster.
The May before that, R.E.M. released its 12th studio album, Reveal. I heard its lead single, “Imitation of Life,” while leaving the Albuquerque airport in a rented car, and was entranced. When we got back to Boulder, I asked my parents to buy a copy of the CD, beginning a fandom that hadn’t abated ten years later when I was listening to Collapse Into Now.
Four months after Reveal was released, the U.S was hit by the September 11th attacks, the first calamity of my life. I’ve never since looked at a copy of Reveal without thinking, “That was from the world before 9/11.” Directionless. And my ability to draw meaning from the eternal return has advanced no further.
#memoir#R.E.M.#zelda#coronavirus#tv writing#law firm#brooklyn#party#loss of virginity#piano#bomb threat#graduation#star wars#injuries#rebecca black
2 notes
·
View notes
Text
2019 SCC Vol. 4 April 21, 2019 Part 1
Arbitration and Conciliation Act, 1996 — Ss. 34 and 37 — Arbitrability of dispute: Limited grounds on which arbitral award may be interfered with, are (i) in exercise of jurisdiction under S. 34 the Court does not sit in appeal over the arbitral award and may interfere on merits only on the well-settled limited grounds, (ii) interference under S. 37 cannot travel beyond the restrictions laid down under S. 34, and (iii) in case an arbitral award has been confirmed by the Court under S. 34 and by the Court in an appeal under S. 37, Supreme Court must be extremely cautious and slow to disturb such concurrent findings. Further, while interpreting the terms of the contract, the conduct of parties and correspondences exchanged would be relevant factors and it is within the arbitrator’s jurisdiction to consider the same. [MMTC Ltd. v. Vedanta Ltd., (2019) 4 SCC 163]
Civil Procedure Code, 1908 — Or. 39 Rr. 1 and 2 — Temporary injunction — Dismissal of application — When justified: In this case, respondents were seeking temporary injunction to restrain State Electricity Board from interfering with their alleged possession over suit land, for construction of electricity sub-station thereon by Board. Respondents failed to make out prima facie case to justify grant of interim injunction. Respondents also failed to specify area in their alleged possession on which Board proceeded to set up sub-station. Balance of comparative convenience and hardship and public interest inclined in favour of Board for construction of power sub-station over land. In case respondents succeed in establishing their title and possession over any part of land utilised by sub-station they would be entitled to compensation under S. 67(3) of Electricity Act, 2003 or any other statutory provisions. It was held that temporary injunction rightly declined by court. [State of Jharkhand v. Surendra Kumar Srivastava, (2019) 4 SCC 214]
Criminal Procedure Code, 1973 — S. 456: Limitation of 30 days for restoration of possession of property is not applicable where trial court had already passed specific order for restoration, or in proceedings before appellate courts. 30 days’ limitation period is applicable where trial court does not pass order for restoration of possession at the time of convicting accused. [Mahesh Dube v. Shivbodh, (2019) 4 SCC 160]
Criminal Procedure Code, 1973 — S. 482: Dissmisal of application of appellant-accused under S. 482, for setting aside charge-sheet under Ss. 420, 498-A, 323, 376 and 506 IPC and Ss. 3 and 4, DP Act, 1961, without application of mind to case, not proper. [Monu v. State of U.P., (2019) 4 SCC 140]
Criminal Procedure Code, 1973 — Ss. 227, 245, 397 and 399 — Discharge application — Manner in which to be considered: While considering petition for discharge, courts cannot act as appellate court and start appreciating evidence by finding out inconsistencies in statements of witnesses. Consideration of record for discharge purpose is different from consideration of record while deciding appeal. [State v. J. Doraiswamy, (2019) 4 SCC 149]
Criminal Trial — Sentence — Minimum sentence/Minimum statutory sentence — Minimum sentence without discretion: Awarding sentence less than the minimum sentence, not permissible. [State of M.P. v. Vikram Das, (2019) 4 SCC 125]
Family and Personal Laws — Muslim Law — Irregular (fasid) marriage: Marriage between Muslim male and Hindu woman, irregular (fasid) and not void (batil). Word “fasid” synonymously regarded as invalid or irregular. Children born from such wedlock treated as legitimate and entitled to share in father’s property. [Mohd. Salim v. Shamsudeen, (2019) 4 SCC 130]
Forest Act, 1927 — Ss. 52 & 54 and 41 & 42 — Prosecution for offences under Forest Act — Non-production of seized wood and vehicle — Effect of: In this case appellants apprehended with vehicle carrying 22 logs of Khair wood without authorisation or permit, acquitted under S. 379 IPC and convicted under Forest Act for six months. The Supreme Court held, non-production of seized wood and vehicle, primary evidence of offence, renders prosecution case fragile and unsustainable. Mere production of seizure memo does not tantamount to production of seized woods and lorry. Unless seized wood was produced, mere production of a sample, and no material in support that sample was out of same 22 logs, conviction of appellants by High Court not sustainable. [Pawan Kumar v. State of H.P., (2019) 4 SCC 182]
Income Tax Act, 1961 — S. 80-HH r/w S. 80-A (Ch. VI-A) and Ss. 32 & 32-AB (Ch. IV) — Deductions under Ch. VIA and those under Ch. IV — Distinguished: Ch. VI-A, is a stand-alone chapter dehors Ch. IV and provisions relating to various kinds of deductions mentioned in Ch. VI-A have to be construed independent of Ch. IV. Further, the purpose of deduction under Ch. IV is to arrive at true income after making such expenditure admissible for deduction while deductions provided under Ch. VI-A, are largely in the nature of incentives. Further, conceptually “income or total income” is different from “profits and gains” and S. 80-A itself uses the expression “from his gross total income”. Also, different provisions from Ss. 80-C to 80-U, while mentioning the percentage at which and for which period a particular deduction is allowable, also specify as to how such a deduction is to be worked out, namely, specific percentage of deduction of which component. S. 80-HH r/w S. 80-A clearly signifies that a deduction under S. 80-HH has to be of gross profits and gains i.e. before computing the income as specified in Ss. 30 to 43-D. Also, the restrictive clause S. 80-AB, inserted w.e.f. 1-4-1981 being a provision made with prospective effect, cannot apply to Assessment Years 1979-1980 and 1980-1981. [Vijay Industries v. CIT, (2019) 4 SCC 184]
Infrastructure Laws — Energy and Power — Electricity Act, 2003 — Ss. 152 and 135 — Compounding of offences: In this case of initiation of prosecution for power theft and subsequent settlement between Electricity Company and consumer, while dismissing petition for quashment of prosecution for power theft, S. 152 was not considered. Hence, matter remanded to High Court for reconsideration of petition in light to S. 152 of Electricity Act, 2003. [Mukesh Chand v. State (NCT of Delhi), (2019) 4 SCC 171]
Insolvency and Bankruptcy Code, 2016 — Ss. 7, 8 and 9 r/w Ss. 5(7), 5(8) and 5(20): Classification of creditors i.e. as financial and operational creditors, held, valid. Operational creditors are not discriminated against and Art. 14 of the Constitution has not been infracted either on the ground of equals being treated unequally or on the ground of manifest arbitrariness. Since equality is only among equals, no discrimination results if the Court can be shown that there is an intelligible differentia which separates two kinds of creditors so long as there is some rational relation between the creditors so differentiated, with the object sought to be achieved by the legislation. Financial creditors generally lend finance on a term loan or for working capital while operational creditors are relatable to supply of goods. Further, financial creditors are, from the very beginning, involved with assessing viability of corporate debtor and engage in restructuring of loan as well as reorganisation of corporate debtor’s business when there is financial stress, which operational creditors do not and cannot do. Further, they differ qua repayment schedule, security requirement for dues, contractual terms for giving credit, remedy in case of defaults and fora before which dispute resolution takes place. Further, financial debts made to banks and financial institutions are well documented and defaults made are easily verifiable. Also, generally the quantum of dues of operational creditors and the number of such creditors are comparatively less. Preserving the corporate debtor as a going concern, while ensuring maximum recovery for all creditors being the objective of the Code, financial creditors are different from operational creditors and therefore, there is an intelligible differentia between the two which has a direct relation to the objects sought to be achieved by the Code. [Swiss Ribbons (P) Ltd. v. Union of India, (2019) 4 SCC 17]
Kerala Abkari Act, 1077 ME (1 of 1077) — Ss. 8(2) and 63 — Sentence warranted — Imprisonment reduced: In this case search of house of appellant-accused, led to recovery of 4.5 litres of arrack and 3.750 litres of Indian made foreign liquor, from his possession. Trial court convicted him under Ss. 8(2) and 63, and sentenced him to undergo simple imprisonment for 1 year and fine of Rs 1,00,000 under S. 8(2), and fine of Rs 5000 under S. 63. High Court, while confirming conviction, modified sentence by reducing SI to 9 months, while maintaining sentence imposed under S. 63. Looking at gravity of offence and quantum of liquor seized during search, and as appellant was already in custody for 35 days, the Supreme Court reduced the imprisonment to the period already undergone. However, penalty amount imposed by trial court, as upheld by High Court, was confirmed. [Lalichan v. State of Kerala, (2019) 4 SCC 224]
Negotiable Instruments Act, 1881 — S. 139: This section raises presumption of law that cheque duly drawn was in discharge of debt or liability. However, presumption is rebuttable and onus lies on drawer to rebut it by adducing cogent evidence to the contrary. This presumption is not in conflict with human right of presumption of innocence of accused which prosecution is required to dislodge by proving its case against accused beyond reasonable doubt. [Bir Singh v. Mukesh Kumar, (2019) 4 SCC 197]
Penal Code, 1860 — S. 302 r/w S. 34: In this case of daylight murder, accused was named in FIR. There were eyewitnesses and there was neither any contradiction nor any inconsistency in their statements on material version such as on the question of identity of accused, who hit, where the assault was made and who fired. There was previous enmity between accused and deceased. A case of common intention under S. 34 IPC also stood fully made out against all the accused persons, hence, conviction was confirmed. [Madan Mohan Mahto v. State of Jharkhand, (2019) 4 SCC 142]
Penal Code, 1860 — Ss. 307/149 and Ss. 325/149, 147, 148, 451, 294/149 & 506/149: In this case charges were framed under all of the above sections by trial court. However, noticing nature of injuries sustained by appellant complainant, High Court quashed and set aside trial court’s order framing charge under S. 307. The Supreme Court held that the High Court had not committed any error in setting aside order passed by trial court insofar as framing charge under S. 307 is concerned. [Champa Lal Dhakar v. Naval Singh Rajput, (2019) 4 SCC 146]
Penal Code, 1860 — Ss. 376(2)(f) and 201: In this case of rape and murder of girl aged 7½ yrs, death sentence commuted to life imprisonment, in the facts and circumstances of the case, due to mitigating circumstances outweighing the aggravating circumstances. [Vijay Raikwar v. State of M.P., (2019) 4 SCC 210]
Police — Director General of Police (DGP) — Residual tenure: Incumbent to be selected as DGP should have a minimum residual tenure of six months (two years or more, preferable) and he should not be on verge of retirement. Minimum residual tenure of 6 months is reasonable and would ward off favouritism. Once appointed, incumbent should get a minimum tenure of two years of service irrespective of his date of superannuation. Selection should be on basis of merit. Above direction to hold field until validity of Police Acts in force is examined and dealt with by Court. [Prakash Singh v. Union of India, (2019) 4 SCC 1]
Police — Director General of Police (DGP) — Tenure and selection: All State Governments directed to scrupulously comply with the directions passed in Prakash Singh, (2006) 8 SCC 1 and approach Court in case of any grievance. Any legislation/rule running counter to directions issued herein shall remain in abeyance. [Prakash Singh v. Union of India, (2019) 4 SCC 13]
Police — Director General of Police (DGP): Selection as per direction in Prakash Singh, (2006) 8 SCC 1, held, wholesome and does not require any modification. Prayer for modification of selection procedure as per said direction, rejected. [Prakash Singh v. Union of India, (2019) 4 SCC 6]
Property Law — Transfer of Property Act, 1882 — Ss. 111(e), 111(f) and 105 to 117 — Lessor-Lessee Relationship — Non-termination of, ipso facto on execution of an agreement to sell tenanted premises to tenant: Mere entering into of such an agreement to sell does not determine the lease/tenancy. Rather, it is necessary to determine whether the parties intended to surrender the lease on execution of such agreement in relation to the tenanted premises, or they intended to keep the lease subsisting notwithstanding the execution of such agreement. If the parties really intended to surrender their tenancy rights as contemplated in Ss. 111(e) or (f) of the TP Act while entering into an agreement to sell, it would have made necessary provision to that effect by providing a specific clause in the agreement. In the absence of such clause/clause akin thereto in the agreement or the conditions in the agreement which discerned the intention of the parties to surrender the tenancy either expressly or impliedly, held, the same did not result in determination of the tenancy. [H.K. Sharma v. Ram Lal, (2019) 4 SCC 153]
Service Law — Pay — Parity in pay/Pay scale — Claim to — Factors to be considered — Competent authority — Extent of judicial review permissible: Equation of pay scales must be left to Government and decision of experts. Courts must refrain from interfering therewith. [Punjab SEB v. Thana Singh, (2019) 4 SCC 113]
Transfer of Property Act, 1882 — S. 43 — Object — Embodies doctrines of estoppel and equity — Applicability: It is clear from Section 43 of the TP Act that if at the time of transfer, the vendor/transferor might have a defective title or have no title and/or no right or interest, however subsequently the transferor acquires the right, title or interest and the contract of transfer subsists, in that case at the option of the transferee, such a transfer is valid. In such a situation, the transferor cannot be permitted to challenge the transfer and/or the transferor has no option to raise the dispute in making the transfer. [Tanu Ram Bora v. Promod Ch. Das, (2019) 4 SCC 173]
Tweet
The post 2019 SCC Vol. 4 April 21, 2019 Part 1 appeared first on SCC Blog.
2019 SCC Vol. 4 April 21, 2019 Part 1 published first on https://sanantoniolegal.tumblr.com/
0 notes
Text
2019 BMW M3 Redesign, Release Date
2019 BMW M3 Redesign, Release Date – Since its commencement, the BMW M3 has exemplified the terrible soul of motorsport. This image keeps on reclassifying the points of confinement of execution with fantastic truth and dazzling grasp to administer dynamic responsiveness that pushes the boundaries of an innovative state.
2019 BMW M3 Redesign
Like previous generations, this spic-and-span 3-Series, codenamed the G20, can doubtless finally end up the benchmark for the small sedan sector once it issues crucial metrics like owning dynamics and performance. notwithstanding, Mercedes-Benz or perhaps Cadillac with their newest tiny sedan offerings have left BMW in catch-up mode.
The M3 keeps up an excellent energy to-weight proportion on account of its Carbon Fiber top and motor support. associate degree metal hood and front wheel curves keep the pounds off to convey outstanding handling, facility, and dynamism out and concerning and therefore the track.
2019 BMW M3 Design
A lot of individuals state that the planning is way more progressive and daring than the present 5- and 7-series, and that’s another step BMW should take. the planning must march on, insiders admit, and it’ll do therefore by redefining the general proportions, the relation between a lot of muscular bodies and therefore the sleeker greenhouse, and therefore the stance which is able to doubtless be sportier. The new 2019 BMW M3 appearance many sorts of a plain three Series. the most excretory organ grilles don’t look otherwise formed, tho’ they are doing seem to own slimmer slats for the air flow.
The mirrors, that are usually distinctive on the M3, look a similar as different prototypes. The hood doesn’t seem to own any major bulges, either. The new BMW M3, internally referred to as G20, can roll on a BMW new longitudinal-engine platform, internally dubbed CLAR, that stands for “cluster architecture”. Being engineered on BMW’s latest CLAR design, expect quite a heap of carbon fiber employed in the new BMW M3. It ought to get a similar automobile on fiber roof as each different current BMW M3 car and it ought to even have some carbon fiber within the chassis structure. Compared with the outgoing model, this new M3 is lighter by a decent a hundred and fifty pounds whereas additionally having a lot of power.
2019 BMW M3 Interior
inside of the cabin, we will expect full digital board, doubtless to be created obtainable on high-end variants. It most likely aims to shut the gap with the new class-leaders, the newest Mercedes-Benz C-class, Audi A4 and new cat chemical element. BMW can most likely keep the fashionable, trendy interior for the new 2019 M3 and who is aware of, perhaps can even surprise the United States with enhancements we tend to don’t expect.
The 2019 BMW M3 is created to appear refined and splendid. It exists as an attractive vehicle, however nothing that’s reaching to attract an excessive amount of attention. it’s nice mechanics lines and an alarmed look, however, it’s, in the end, one thing that matches right into the casual everyday feel
2019 BMW M3 Engine Specs
This is all general points for the future BMW three Series that may actually build it means that to the M3 additionally as improve it. notwithstanding, in case, it worries the projecting to BMW M3 powertrain, details get slightly reckless. One report from automotive vehicle states that the company-new M3 will definitely have a connected three.0 litre twin-turbocharged I6, notwithstanding, will certainly use traditional water shot additionally as an influence turbocharger to provide everything around five hundred H.P.. this is not very an unlikely aid, as BMW goes to gift considering beverage shots on its initial producing vehicles additionally because the truck with the BMW M4 GTS as effectively as Audi goes the strategy of an influence turbocharger on the upcoming RS4. that indicates that this can be a solid chance.
he imaginary connect-in Hybrid BMW M3 would doubtless withal utilize a three.0-liter 2 turbocharged I6 engine to power the rear tires. withal, a group of electric-powered engines would power the leading edges, really making the succeeding M3 a several-tire-drive connect-in Hybrid. It’s expressed this 2019 M3 would doubtless have the aptitude to try and do twenty an extended method of power by yourself additionally as have true-time torsion vectoring.
Although the ultimate M3 is way less possibly, it’s not very exterior the entire globe of chance bearing in mind BMW’s most up-to-date propensity for Crossbreed gift day innovation. notwithstanding, the last possibility is that the way more doubtless one, considering that the trendy technology that might quickly be created use of has typically presently been mentioned by BMW prior to. A crossbreed M3 is not associate degree infeasibility withal it’s associate degree improbableness. we tend to ar possibly to not confirm for years. withal, it’s but pleasant to guess.
2019 BMW M3 Release Date and Price
We can expect the new BMW M3 to seem someday next year as a 2019 model. BMW is clearly performing on the M3 conjunction with the regular three Series, that the surprise of M3 creating its debut aboard the conventional automobile, wouldn’t be that massive. there’s no official info concerning the discharge date. there’s no official communication concerning the value either. we’d expect it near the present generation’s, which means the poorness model, with no supplementary options thereon, can begin within the mid-$30,000s. [2018AutoReview]
The post 2019 BMW M3 Redesign, Release Date appeared first on 2018AutoReview.Com.
from WordPress http://bit.ly/2SsNYiw via IFTTT
0 notes
Text
HPSEB Recruitment 2018 Notification Out For Junior T-Mate/ Helper Various Jobs - Apply Online
HPSEB Recruitment 2018
The latest notification available via Himachal Pradesh State Electricity Board as an HPSEB Recruitment 2018 to fill up various fresh vacancies for the Posts of Junior T –Mate and Junior Helper (Sub- Station). The most important thing applying applicant’s selection will be based on their performance in Matric and Personal interview. Dear contenders, who want to do the job in Himachal Pradesh State Electricity Board as a Junior T –Mate and Junior Helper (Sub- Station) Posts they all applicants need to apply against HPSEB Recruitment 2018 on or before the last date. Every applicant wants to get a good job in but those don’t select the career, therefore, I advised to get the offered jobs and build their career in this sector. The Himachal Pradesh State Electricity Board is also commonly known as HPSEB. To overcome the problem, Himachal Pradesh State Electricity Board is going to recruit the candidates in the different branches of the department. Eligible aspirants who are keenly desired for Junior T –Mate and Junior Helper (Sub- Station) Posts they need to get other associated content of Himachal Pradesh State Electricity Board with applying conditions. Related additional information regarding HPSEB Recruitment 2018 is showed below. Himachal Pradesh State Electricity Board is the biggest construction and maintenance companies. To get clean and well information connected to HPSEB Recruitment 2018 such as essential qualification, (शैक्षिक योग्यता), application fee (आवेदन शुल्क), selection process (चयन प्रक्रिया), pay scale (वेतन विवरण), age limit (आयु सीमा), vacancies details (रिक्तियों विवरण), important date (महत्वपूर्ण तारीख), process to apply (आवेदन कैसे करे), etc you need to visit this portal of www.Jobsbato.in. Career Management Best Tips
HPSEB Recruitment 2018 Brief Details:
Organization Name: Himachal Pradesh State Electricity Board Posts Name: Various Posts Total: Various Posts Last Date to Apply: Updated Soon HPSEB Recruitment 2018 Highlights: Posts Name with Vacancies: Sr. No. Posts Name 01 Junior T –Mate 02 Junior Helper (Sub- Station) Education Qualification (शैक्षिक योग्यता): Applicants should have passed Matriculation from the recognized board/school. Preference will be given to the applicants who possess ITI certificate in Wireman/ Electrician trade done through a regular course from an institution recognized by the H.P. Government. Candidates must be a citizen of India and should be a Bonafide Himachali. Age Limit (आयु सीमा): Dear applicants who are going to apply for Himachal Pradesh State Electricity Board recruitment they applicants age should not be less than 18 years and not exceed 30 years as on 01st January 2018. Upper age limit is relaxable by five years for aspirants belonging to Scheduled Caste, Scheduled Tribe, and Other Backward Classes & Children/Grand Children of Freedom Fighters of Himachal Pradesh. Selection Process (चयन प्रक्रिया): The selection of the applicants will be made on the basis of their marks obtained in Matric and Personal interview. Sr. No. Process Marks Assigned 01 Marks obtained in Matric to be awarded on Prorata basis 60 marks 02 Technical qualification of ITI in Wireman /Electrician trade obtained through Regular Course from the institutions recognized by the Government of Himachal Pradesh. 25 marks 03 Personal Interview 15 marks The total selection process is of 100 Marks with following distribution. Way to Apply: Please check mention below steps before Apply: All interested candidates need to visit the official website of Himachal Pradesh State Electricity Board which is “www.hpseb.com”. Then, go to “Other Useful Link” section which is furnished at the left side of the homepage. Now, press on “Vacancies/Appointment” tab and press “Application are invited for filling up various posts of Junior T / Mate and various Junior Helper (Sub-Station)” link. Now read full notification and download the application form. An application should be filed inaccurate format including whole information. All applicants need to send the duly prepared application along with photocopies of all relevant certificated/documents. Applicants must affix current recognizable passport size photograph and essential documents in support of age, educational, experience etc along with duly filled application form. After filling the application form in all aspects applicants need to send the mention below address on or before the last date. Postal Address: “Chief Engineer (Operations) North Zone HPSEB Limited, Dharamshala, District Kangra Himachal Pradesh, Pin – 176215. Chief Engineer (Operations) Central Zone HPSEB Limited, Mandi, District Mandi Himachal Pradesh, Pin – 175001. Chief Engineer (Operations) South Zone, HPSEB Limited, Vidyut Bhawan, Shimla Himachal Pradesh, Pin-1various04.” HPSEB Recruitment Important Dates: Last Date to Application Form- Updated Soon How to Prepare For Exam Last Time Study How to Prepare For Examination Best Tips How To Get Good Marks In Examination Note: For known more detailed information may check the following links. HPSEB Recruitment Important Links: Official Notification Official Website Read the full article
0 notes
Text
BOSTITCH CAP1512-OF 1.2 Gallon Oil-Free High-Output Trim Compressor reviews
This summer Bostitch proclaimed the a replacement compact TrimAir mechanical device, Model CAP1512-OF. we have a tendency to were lucky enough to receive one in all these new compact compressors to check and review.
According to Product Manager James Vintzel, “We designed this next generation mechanical device to produce all of the advantages of the ever-popular TrimAir unit, however with a replacement level of power and performance.”
I was terribly desirous to seek the new TrimAir mechanical device once I detected that it weighs underneath twenty five lbs and it’s able to support up to 2 end nailers at just one occasion. scan on to listen to our thoughts on this exciting new compact mechanical device.
Trim Air mechanical device
options High-output oil-free pump delivers a pair of.8 CFM @ ninety PSI and a hundred and fifty PSI grievous bodily harm in operation pressure for multiple fi nish tool operation
2.0 H.P. (Peak), 1.5 H.P. (Running) motor attracts twelve amps for straightforward come out while not tripping circuit breakers
1.2 gallon compact style weighs a pair of3.5 lbs. for straightforward movableness
Integrated board with roll cage protects gauges from jobsite injury
junction rectifier ON/OFF switch enables you to recognize once the mechanical device is on to eliminate nonaggressive misfi res
On-board tool and hose storage
Convenient storage pocket for hand tools, fasteners and fittings
Integrated twine wrap for improved movableness
No-marring rubber feet
Size & movableness
Right out of the box you’ll notice a major distinction within the size of the TrimAir mechanical device compared to our recent workhorse Bostitch flapcake mechanical device. clearly there's a giant distinction within the HP and tank size between these 2 compressors. However, what affected Pine Tree State was the output of the new TrimAir compared to my older mechanical device. The TrimAir weighs in at twenty three.5 lbs whereas the older one weighs in at over five0 lbs. The TrimAir puts out three.7 CFM @ forty psi whereas the older one three.4 CFM @ four0 psi. Pretty spectacular if you raise me!
Read also Best 20 Gallon Air Compressor Reviews
The other Brobdingnagian advantage here is that the form and movableness. The new TrimAir mechanical device is far narrower and much less high serious. this implies you'll hold the burden nearer to your body, run into fewer things on the work web site and therefore the mechanical device is a smaller amount seemingly to tip over in your truck and break.
The role cage round the controls is additionally a good feature. As I identified {above|higher than|on high of} the older versions were terribly top serious and at risk of tipping over. They conjointly had no protection for the controls and that i in person have broken then before once rolling them over. The TrimAir’s new role cage just about eliminates that chance that could be a Brobdingnagia improvement.
Much Quieter
The other factor that basically got my attention with this new mechanical device is however quiet it's compared to several of the opposite tiny compressors that we have a tendency to use. tiny compressors ar most frequently used within a finished home whereas functioning on tiny comes like trim, carpentry and even flooring. The recent flapcake mechanical device has been through thick and skinny with Pine Tree State on comes however it wakes up everybody round the second it comes on to replenish with air.
The new TrimAir mechanical device is one in all the quietest compressors I’ve ever used. once this small guy switches on you hardly understand it. i might guess it’s 2 to 3 times additional quiet than my recent mechanical device.
Power & skillfulness
The TrimAir mechanical device will muster a powerful a hundred and fifty psi grievous bodily harm in operation pressure and a couple of.8 CFM at ninety psi. additionally this small guy solely attracts twelve amps at come out which suggests you get many pressure with less probability of throwing electrical breakers on the work web site. we have a tendency to tested the TrimAir mechanical device on many comes together with a cupboard install, some support components and a few exterior trim work. The mechanical device did a good job keeping a uniform pressure with none down time.
I really like that the mechanical device has enough power to be a awfully capable punch list tool. you'll go from putting in window trim to hardwood cupboard moldings and even shoot some framing nails into designed lumber.
Neat options
Bostitch TrimAir mechanical deviceThe TrimAir Compressor comes with some of neat options and a good overall style. the rear of the mechanical device includes a significant velcrow strap. The strap is wont to simply attach a tool or nail gun for straightforward transportation. the lowest of the mechanical device conjointly has a straightforward to use twine wrap therefore you won’t be tripping over the twine after you move from job to job. The non-marring rubber achievement ar nice similarly particularly once operating in finished homes.
youtube
Maintenance Free
This mechanical device is AN oil-free style. This isn’t all that new however I do just like the feature. It makes maintenance a non issue and conjointly permits the unit to be operated on uneven surfaces.
Final Thoughts
Compact compressors ar terribly helpful once it involves tiny jobs like trim, carpentry and punch lists. Having a light-weight, small, powerful mechanical device is essential for productivity and reducing injury on the work web site. The TrimAir mechanical device is nice for this kind of use and a compact mechanical device that i like to recommend. i used to be terribly affected with it’s power, quiet in operation and compact style.
0 notes
Link
Nouvelle annonce en Tunisie
4000 Dredging installation Dredge pump type AH, AHR, HH, L, LR, M, SP, SPR, ZGB, ZGBP Pump flow 4000 cbm/h Pump capacity on dry soil 800 t/h Pump slurry head 70 m Maximum dredging depth 7 m - 25 m Slurry transportation distance 1200 m Suction / discharge pipe diameter 32 in Dredger main body characteristics Suction ladder length 12 m - 30 m Board height 2,0 m Minimum steel thickness of dredger hull Central pontoon - side, deck, bulkheads S = 10 mm - bottom S = 12 mm - transom S = 16 mm Side pontoon - bottom S = 8 mm - side, deck, bulkheads S = 6 mm Dredging pump drive - diesel engine Engine brand Russian origin or Caterpillar, MAN, Cummins, Weichai Engine power - minimal 630 kWt (857 h.p.) - optimal 900 kWt (1224 h.p.) - maximal 1170 kWt (1591 h.p.) Gearbox hydraulic Fuel tank capacity 6 cbm Diesel power station Engine brand installed Russian origin or any on demand Power station capacity - minimal 300 kWt - optimal 400 kWt - maximal 500 kWt Fuel tank capacity 4 cbm Hydraulic auxiliary engine Engine brand installed Russian origin or any on demand Hydraulic station diesel engine capacity - minimal 300 kWt - optimal 400 kWt - maximal 500 kWt Fuel tank capacity 2 cbm Ladder winch Rated pull 250 KN (20 t) Rope speed 18-35 m/min Wire rope capacity 150 m Swing and spud winches - 4 pcs Rated pull 50 KN (5,0 t) Rope speed 18-35 m/min Wire rope capacity 150 m Soil milling equipment types and parameters 1. Waterjet Water head 125 m Water capacity 630 cbm/h 2. Cutter Diameter 2,0 m Hydraulic motor power 500 kWt Auxiliary water pump Water head 80 m Water capacity 300 cbm/h Onboard slurry pipeline fittings Check hatch before slurry pump Flexible suction corrugated tube 1 pcs Turning stern device rubber cloth Rubber expansion joint for slurry pump 2 pcs Installed dredging systems and vessel equipment Counter-landslide setup YES Slurry pump rinsing system YES Outboard boxcooler Double-circuit Ejector nozzle for waterjet milling YES Improved assembly YES Machine room ventilation extract and input Side pontoons drainage system YES Machine room drainage system YES Fire extinguishing system YES Electrical equipment Elcetric rack 1 Dredger control panel 2 pcs Machine room light points 4 Otside spotlights qt. 2 Optional equipment Electric version dredger with electric driven motors, engines and equipment Dredging efficiency control system Video surveillance system Alarm and equipment malfunction warning system Digital equipment state monitoring system Consistent equipment work automatization Deck crane Piling spuds Elctric based drives Ergonomic operator's seat Strengthened hull from marine steel Anticorrosive hull coating from polyurea PHONE ME: +79517915168 PHONE ME: +79517915168 PHONE ME: +79517915168
0 notes
Text
This slideshow requires JavaScript.
Hanse 470e
Make: Hanse Model: 470e Length: 46 ft 7 in Price: $ 259,000 Year: 2007 Condition: Used Location: San Diego, CA, United States
Hull Material: Fiberglass Draft: 7 ft 6 in Number of Engines: 1 Fuel Type: Diesel Number: 6234988
Description
The owners of this vessel spared no expense when ordering this well cared for Hanse 470e. Featuring a fast and stable hull design featuring a deep draft bulb keel she tracks amazingly well in all sea conditions. She is ready for long range cruising with her offshore equipment including Radar, A brand new Generator, A/C, Watermaker, Asymmetrical spinnaker, and an easy to handle sail plan equipped with a self tacking headsail.
This 2007 model was one of the few built with a heavily reinforced hull build in Epoxy, twinned with a galvanised steel subframe the Hanse 470e is head and shoulders above the competition from a build quality point of view. She has been carefully sailed and maintained by her owners since she was commissioned in and delivered them in Croatia. She has been cruised in the Mediterranean and then shipped to San Diego and sailed locally. Privately owned and never chartered or raced.
Contact me directly for additional performance details for this performance cruiser
Measurements
Cruising Speed: 8 mph Max Speed: 9 mph LOA: 46 ft 7 in LWL: 41 ft 4 in Beam: 14 ft 8 in Max Draft: 7 ft 6 in Cabin Headroom: 6 ft 5 in Dry Weight: 26932 lb Total: 1334 ft² Mainsail: 727 ft² Headsail: 520 ft²
Ballast: 7837 lb Displacement: 26932 lb Seating Capacity: 12 Windlass: Electric Windlass Electrical Circuit: 12V Fuel Tanks Capacity: 66 gal Fresh Water Tanks Capacity: 105 gal Number of double berths: 4 Number of Cabins: 3 Number of Heads: 2
Propulsion
Engine Make: Yanmar Engine Model: Yanmar 4JH3-TCE Primary Engines: Inboard Drive Type: Sail Drive
Engine Year: 2007 Hours: 1050 Power: 75 hp Propeller Type: 3 Blade
Sail Area
I : 65.58 ft J : 17.50 ft P : 65.58 ft E : 18.67 ft Working Sail Area : 1334.00 sq ft
Interior & Cabin
High quality marine plywood, mahogany veneer, satin varnish
Option: Mahogany
Wooden door frames
Wood / Sandwich doors
Dual Air Conditioning System: 8000 BTU Saloon, 6000 BTU Forward Cabin
Forward cabin
Owner cabin with island berth, extensive hanging lockers and drawers including a head and shower unit in owners state room
Options according to Hanse Individual Cabin Concept
Main Saloon
Large saloon table that converts to large berth
Lockers
L-Sofa
Navigation area
Seat at navigation station
Locker above chart table for instruments and books
110 V / 230 V / 12 V outlet
Storage in the chart table
Chart lights
Aft cabin
2 double aft cabins with lockers
Head / Shower
Large head with separate shower stall on port side
(2) Raritan Electric Marine toilets
Gravity Holding tanks
Sea and deck discharge
CoreanTM solid surface black quarz with sink
Electrical drain pump
Mirror
Locker & shelves
Opening hatch
Electrical
12 V and 110 V as well as 230 V Systems on board for truly international cruising
Watermaker
Batteries
Main battery switch
1 engine battery 12 V / 85 Ah
8 service batteries: 12 V / 4x105Ah & 4x125Ah
Battery charger / Shore power
Battery charger 12 V / 50 Amp.
110 V / 230 V shore power protected with differential breaker and distribution system
Electric switch panel 110 V / 230 V
1 differential breaker
Control gauge
Electric switch panel 12 V
Switches for all onboard electrics
Voltmeter and battery control
Water / Fuel gauges
12 V Electric equipment
Electrical anchor windlass
4 Electrical winches, (2) Harken 54 Primary (2) Harken 38 Secondary
Pumps
Navigation lights
Interior lights
Refrigerator
Outlets 110 V / 230 V
in fwd. cabin
in aft cabin
at chart table
in galley
in head
Outlets 12 V
at chart table
at helm station
Interior lighting
Overhead lighting in cabins, saloon, galley and heads
Lighting in engine compartment
Reading lights in saloon and cabins
Galley
Solid surface, CoreanTM black quartz with integrated double sink
2-burner LPG stove with oven, gimbled
Gas system and self draining LPG bottle storage in cockpit
Extra large 12v fridge of approx. 130 l
Front Loading Freezer
Lockers and drawers
Trash can
Bosch Stainless Dishwasher
Panasonic Microwave
Engine & Prop
Yanmar 4JH3-TCE, 75 HP, diesel engine
New Yanmar SD-50 Saildrive
3 Blade Flexofold Propeller
Brand New Northern Lights Generator – 6.5kw (less than 20 hours)
1 alternator 12 V / 60 Amp.
12 V / 80 Ah engine battery
Stainless steel fuel tank
Fuel infill on deck
Seawater strainer
Fuel filter / Water separator
Engine hour meter
Engine mechanical compartment sound insulated
Hull
Hull built with prepreg fibreglass fabrics in epoxy, vacuum cured with CorecellTM foam postcured
(New) Medium Grey w/ Pearl grey stripes
Bulkheads laminated to hull and deck
Strong back, galvanised steel subframe
Hull windows
Anchor gear
22 KG Rocna anchor
Fortress anchor
Deck
Hand laid sandwich construction, thermal and sound insulated
Deck Equipment
Bow fitting with anchor roller
Self-draining anchor locker with lockable hatch
Electric windlass under deck
Self-draining cockpit
Full Teak Deck
Semco treatment to Teak Decks
Teak on seats and cockpit floor
Teak on coach roof
New Lewmar flush hatches
New Plexiglass salon portlights
Stainless steel and acrylic glass cockpit table with chart plotter bracket
6 retractable mooring cleats
Hinged swimming platform
Stainless steel swim ladder
Self-draining cockpit
Engine control at starboard helm stations
Halyard storage boxes in the cockpit
Storage for gas bottle, selfdraining
Hot & cold shower on aft deck
Genoa tracks with pinstop cars
Mainsheet on coach roof
2 x 6 sheave deck organizers
12 deck jammers
Opening portholes in cockpit
Stainless steel pushpit with navigation light
Stainless steel split pulpit with navigation lights
Stainless steel stanchions tapered
Rail gates on both sides
(2) Harken 54 Electric Primary Winches w/new contactors (2) Harken 38 Secondary Winches
Canvas
Custom Designed Dodger & Bimini
Custom Full Cockpit enclosure with insect screens and covers
Navigation & Instruments
Navigation lights
Navigation lights on pulpit and pushpit
Steaming light
Anchor light
Navigation instruments
Compass illuminated
Speedometer and depth sounder on a combi display at each helm
Simrad NSS7 Network Navigation System
Simrad NSE12 Network Navigation System
Simrad 4G Broadband Radar
Navico NAIS-300 AIS Transponder NMEA 2000
Simrad IS20 Wind Display (Port)
Simrad IS20 Combi Display (Port)
Simrad IS20 Tack Display (Port)
Simrad IS20 Rudder Display (Starboard)
Simrad IS20 Combi Display (Starboard)
Simrad IS20 Wind Display (Starboard)
Simrad AP24 02 Autopilot System
Simrad GS15 GPS Antenna
Simrad SonicHub Marine Audio
Simrad NEP-2 Network Expansion Port
NavPod PP5061 20-40 Swivel Base PowerPod
Furuno Navtex Weather receiver
Entertainment
Stereo
Clarion Stereo w/ CD changer, Bose speakers and subwoofer
Polk audio cockpit speakers w/ JL Audio 600 watt amplifier
Inverter
Xantrex 2 KW inverter w/ digital monitor
TV
Samsung LED TV’s in main salon and master stateroom
KVH Tracvision M1 Satelite TV antenna
Rig and Sails
3 spreader silver anodised mast, tapered
Boom with 2 reefing lines
cockpit light in boom
North Sails Mainsail fully battened
North Sails Self-tacking jib (New UV Cover May 2017)
North Sails Gennaker/Asymmetrical Spinnaker (2009)
Furling system for jib
Low Stretch Main halyard
Low Stretch Jib halyard
Spinnaker halyard
Ballslide system for mainsail
Main Sheet
Jib sheet
Rod kicker
Maindrop system with Lazy Jacks, colour: light-grey
Backstay adjuster
Keel
Composite iron / lead keel
Medium draft keel: 2.30 m / 7´7
Stainless steel keel bolts
Plumbing System / Fresh Water
Tank
Stainless steel fresh water, capacity approx. 380 l (100 Gal)
Water infill on deck
Additional 40 gal water tank in bow
Hot water
Water heater, running from engine and immersion heater 110 V / 230 V
Dinghy
Zodiac 9’ inflatable w/ 6 H.P. Suzuki four stroke engine
2007 - Hanse 470e - For Sale in San Diego, CA Hanse 470e Make: Hanse Model: 470e Length: 46 ft 7 in Price: $ 259,000 Year: 2007 Condition: Used Location: San Diego, CA, United States Hull Material: Fiberglass Draft: 7 ft 6 in Number of Engines: 1 Fuel Type: Diesel Number: 6234988 …
0 notes
Text
HPSEB Recruitment 2018 Notification Out For Junior T-Mate/Helper Various Jobs Apply Online
HPSEB Recruitment 2018
The latest notification available via Himachal Pradesh State Electricity Board as an HPSEB Recruitment 2018 to fill up various fresh vacancies for the Posts of Junior T –Mate and Junior Helper (Sub- Station). The most important thing applying applicant’s selection will be based on their performance in Matric and Personal interview. Every applicant wants to get a good job in but those don’t select the career, therefore, I advised to get the offered jobs and build their career in this sector. Dear contenders, who want to do the job in Himachal Pradesh State Electricity Board as a Junior T –Mate and Junior Helper (Sub- Station) Posts they all applicants need to apply against HPSEB Recruitment 2018 on or before the last date. Eligible aspirants who are keenly desired for Junior T –Mate and Junior Helper (Sub- Station) Posts they need to get other associated content of Himachal Pradesh State Electricity Board with applying conditions. The Himachal Pradesh State Electricity Board is also commonly known as HPSEB. To overcome the problem, Himachal Pradesh State Electricity Board is going to recruit the candidates in the different branches of the department. Related additional information regarding HPSEB Recruitment 2018 is showed below. Himachal Pradesh State Electricity Board is the biggest construction and maintenance companies. To get clean and well information connected to HPSEB Recruitment 2018 such as essential qualification, (शैक्षिक योग्यता), application fee (आवेदन शुल्क), selection process (चयन प्रक्रिया), pay scale (वेतन विवरण), age limit (आयु सीमा), vacancies details (रिक्तियों विवरण), important date (महत्वपूर्ण तारीख), process to apply (आवेदन कैसे करे), etc you need to visit this portal of www.Jobsbato.in. Career Management Best Tips
HPSEB Recruitment 2018 Brief Details:
Organization Name: Himachal Pradesh State Electricity Board Posts Name: Various Posts Total: Various Posts Last Date to Apply: Updated Soon HPSEB Recruitment 2018 Highlights: Posts Name with Vacancies: Sr. No. Posts Name 01 Junior T –Mate 02 Junior Helper (Sub- Station) Education Qualification (शैक्षिक योग्यता): Applicants should have passed Matriculation from the recognized board/school. Preference will be given to the applicants who possess ITI certificate in Wireman/ Electrician trade done through a regular course from an institution recognized by the H.P. Government. Candidates must be a citizen of India and should be a Bonafide Himachali. Age Limit (आयु सीमा): Dear applicants who are going to apply for Himachal Pradesh State Electricity Board recruitment they applicants age should not be less than 18 years and not exceed 30 years as on 01st January 2018. Upper age limit is relaxable by five years for aspirants belonging to Scheduled Caste, Scheduled Tribe, and Other Backward Classes & Children/Grand Children of Freedom Fighters of Himachal Pradesh. Selection Process (चयन प्रक्रिया): The selection of the applicants will be made on the basis of their marks obtained in Matric and Personal interview. Sr. No. Process Marks Assigned 01 Marks obtained in Matric to be awarded on Prorata basis 60 marks 02 Technical qualification of ITI in Wireman /Electrician trade obtained through Regular Course from the institutions recognized by the Government of Himachal Pradesh. 25 marks 03 Personal Interview 15 marks The total selection process is of 100 Marks with following distribution. Way to Apply: Please check mention below steps before Apply: All interested candidates need to visit the official website of Himachal Pradesh State Electricity Board which is “www.hpseb.com”. Then, go to “Other Useful Link” section which is furnished at the left side of the homepage. Now, press on “Vacancies/Appointment” tab and press “Application are invited for filling up various posts of Junior T / Mate and various Junior Helper (Sub-Station)” link. Now read full notification and download the application form. An application should be filed inaccurate format including whole information. All applicants need to send the duly prepared application along with photocopies of all relevant certificated/documents. Applicants must affix current recognizable passport size photograph and essential documents in support of age, educational, experience etc along with duly filled application form. After filling the application form in all aspects applicants need to send the mention below address on or before the last date. Postal Address: “Chief Engineer (Operations) North Zone HPSEB Limited, Dharamshala, District Kangra Himachal Pradesh, Pin – 176215. Chief Engineer (Operations) Central Zone HPSEB Limited, Mandi, District Mandi Himachal Pradesh, Pin – 175001. Chief Engineer (Operations) South Zone, HPSEB Limited, Vidyut Bhawan, Shimla Himachal Pradesh, Pin-1various04.” HPSEB Recruitment Important Dates: Last Date to Application Form- Updated Soon How to Prepare For Exam Last Time Study How to Prepare For Examination Best Tips How To Get Good Marks In Examination Note: For known more detailed information may check the following links. HPSEB Recruitment Important Links: Official Notification Official Website Read the full article
0 notes
Text
HPSEB Recruitment 2018 Notification Out For Junior T-Mate/Helper Various Jobs Apply Online
HPSEB Recruitment 2018
The latest notification available via Himachal Pradesh State Electricity Board as an HPSEB Recruitment 2018 to fill up various fresh vacancies for the Posts of Junior T –Mate and Junior Helper (Sub- Station). Dear contenders, who want to do the job in Himachal Pradesh State Electricity Board as a Junior T –Mate and Junior Helper (Sub- Station) Posts they all applicants need to apply against HPSEB Recruitment 2018 on or before the last date. The most important thing applying applicant’s selection will be based on their performance in Matric and Personal interview. Every applicant wants to get a good job in but those don’t select the career, therefore, I advised to get the offered jobs and build their career in this sector. Related additional information regarding HPSEB Recruitment 2018 is showed below. Himachal Pradesh State Electricity Board is the biggest construction and maintenance companies. To get clean and well information connected to HPSEB Recruitment 2018 such as essential qualification, (शैक्षिक योग्यता), application fee (आवेदन शुल्क), selection process (चयन प्रक्रिया), pay scale (वेतन विवरण), age limit (आयु सीमा), vacancies details (रिक्तियों विवरण), important date (महत्वपूर्ण तारीख), process to apply (आवेदन कैसे करे), etc you need to visit this portal of www.Jobsbato.in. Eligible aspirants who are keenly desired for Junior T –Mate and Junior Helper (Sub- Station) Posts they need to get other associated content of Himachal Pradesh State Electricity Board with applying conditions. The Himachal Pradesh State Electricity Board is also commonly known as HPSEB. To overcome the problem, Himachal Pradesh State Electricity Board is going to recruit the candidates in the different branches of the department. Career Management Best Tips
HPSEB Recruitment 2018 Brief Details:
Organization Name: Himachal Pradesh State Electricity Board Posts Name: Various Posts Total: Various Posts Last Date to Apply: Updated Soon HPSEB Recruitment 2018 Highlights: Posts Name with Vacancies: Sr. No. Posts Name 01 Junior T –Mate 02 Junior Helper (Sub- Station) Education Qualification (शैक्षिक योग्यता): Applicants should have passed Matriculation from the recognized board/school. Preference will be given to the applicants who possess ITI certificate in Wireman/ Electrician trade done through a regular course from an institution recognized by the H.P. Government. Candidates must be a citizen of India and should be a Bonafide Himachali. Age Limit (आयु सीमा): Dear applicants who are going to apply for Himachal Pradesh State Electricity Board recruitment they applicants age should not be less than 18 years and not exceed 30 years as on 01st January 2018. Upper age limit is relaxable by five years for aspirants belonging to Scheduled Caste, Scheduled Tribe, and Other Backward Classes & Children/Grand Children of Freedom Fighters of Himachal Pradesh. Selection Process (चयन प्रक्रिया): The selection of the applicants will be made on the basis of their marks obtained in Matric and Personal interview. Sr. No. Process Marks Assigned 01 Marks obtained in Matric to be awarded on Prorata basis 60 marks 02 Technical qualification of ITI in Wireman /Electrician trade obtained through Regular Course from the institutions recognized by the Government of Himachal Pradesh. 25 marks 03 Personal Interview 15 marks The total selection process is of 100 Marks with following distribution. Way to Apply: Please check mention below steps before Apply: All interested candidates need to visit the official website of Himachal Pradesh State Electricity Board which is “www.hpseb.com”. Then, go to “Other Useful Link” section which is furnished at the left side of the homepage. Now, press on “Vacancies/Appointment” tab and press “Application are invited for filling up various posts of Junior T / Mate and various Junior Helper (Sub-Station)” link. Now read full notification and download the application form. An application should be filed inaccurate format including whole information. All applicants need to send the duly prepared application along with photocopies of all relevant certificated/documents. Applicants must affix current recognizable passport size photograph and essential documents in support of age, educational, experience etc along with duly filled application form. After filling the application form in all aspects applicants need to send the mention below address on or before the last date. Postal Address: “Chief Engineer (Operations) North Zone HPSEB Limited, Dharamshala, District Kangra Himachal Pradesh, Pin – 176215. Chief Engineer (Operations) Central Zone HPSEB Limited, Mandi, District Mandi Himachal Pradesh, Pin – 175001. Chief Engineer (Operations) South Zone, HPSEB Limited, Vidyut Bhawan, Shimla Himachal Pradesh, Pin-1various04.” HPSEB Recruitment Important Dates: Last Date to Application Form- Updated Soon How to Prepare For Exam Last Time Study How to Prepare For Examination Best Tips How To Get Good Marks In Examination Note: For known more detailed information may check the following links. HPSEB Recruitment Important Links: Official Notification Official Website Read the full article
0 notes
Text
HPSEB Recruitment 2018 Junior T-Mate/Helper Various Jobs Apply Online
HPSEB Recruitment 2018
The latest notification available via Himachal Pradesh State Electricity Board as an HPSEB Recruitment 2018 to fill up various fresh vacancies for the Posts of Junior T –Mate and Junior Helper (Sub- Station). To overcome the problem, Himachal Pradesh State Electricity Board is going to recruit the candidates in the different branches of the department. Dear contenders, who want to do the job in Himachal Pradesh State Electricity Board as a Junior T –Mate and Junior Helper (Sub- Station) Posts they all applicants need to apply against HPSEB Recruitment 2018 on or before the last date. The most important thing applying applicant’s selection will be based on their performance in Matric and Personal interview. Every applicant wants to get a good job in but those don’t select the career, therefore, I advised to get the offered jobs and build their career in this sector. Related additional information regarding HPSEB Recruitment 2018 is showed below. Eligible aspirants who are keenly desired for Junior T –Mate and Junior Helper (Sub- Station) Posts they need to get other associated content of Himachal Pradesh State Electricity Board with applying conditions. The Himachal Pradesh State Electricity Board is also commonly known as HPSEB. Himachal Pradesh State Electricity Board is the biggest construction and maintenance companies. To get clean and well information connected to HPSEB Recruitment 2018 such as essential qualification, (शैक्षिक योग्यता), application fee (आवेदन शुल्क), selection process (चयन प्रक्रिया), pay scale (वेतन विवरण), age limit (आयु सीमा), vacancies details (रिक्तियों विवरण), important date (महत्वपूर्ण तारीख), process to apply (आवेदन कैसे करे), etc you need to visit this portal of www.Jobsbato.in. Career Management Best Tips
HPSEB Recruitment 2018 Brief Details:
Organization Name: Himachal Pradesh State Electricity Board Posts Name: Various Posts Total: Various Posts Last Date to Apply: Updated Soon HPSEB Recruitment 2018 Highlights: Posts Name with Vacancies: Sr. No. Posts Name 01 Junior T –Mate 02 Junior Helper (Sub- Station) Education Qualification (शैक्षिक योग्यता): Applicants should have passed Matriculation from the recognized board/school. Preference will be given to the applicants who possess ITI certificate in Wireman/ Electrician trade done through a regular course from an institution recognized by the H.P. Government. Candidates must be a citizen of India and should be a Bonafide Himachali. Age Limit (आयु सीमा): Dear applicants who are going to apply for Himachal Pradesh State Electricity Board recruitment they applicants age should not be less than 18 years and not exceed 30 years as on 01st January 2018. Upper age limit is relaxable by five years for aspirants belonging to Scheduled Caste, Scheduled Tribe, and Other Backward Classes & Children/Grand Children of Freedom Fighters of Himachal Pradesh. Selection Process (चयन प्रक्रिया): The selection of the applicants will be made on the basis of their marks obtained in Matric and Personal interview. Sr. No. Process Marks Assigned 01 Marks obtained in Matric to be awarded on Prorata basis 60 marks 02 Technical qualification of ITI in Wireman /Electrician trade obtained through Regular Course from the institutions recognized by the Government of Himachal Pradesh. 25 marks 03 Personal Interview 15 marks The total selection process is of 100 Marks with following distribution. Way to Apply: Please check mention below steps before Apply: All interested candidates need to visit the official website of Himachal Pradesh State Electricity Board which is “www.hpseb.com”. Then, go to “Other Useful Link” section which is furnished at the left side of the homepage. Now, press on “Vacancies/Appointment” tab and press “Application are invited for filling up various posts of Junior T / Mate and various Junior Helper (Sub-Station)” link. Now read full notification and download the application form. An application should be filed inaccurate format including whole information. All applicants need to send the duly prepared application along with photocopies of all relevant certificated/documents. Applicants must affix current recognizable passport size photograph and essential documents in support of age, educational, experience etc along with duly filled application form. After filling the application form in all aspects applicants need to send the mention below address on or before the last date. Postal Address: “Chief Engineer (Operations) North Zone HPSEB Limited, Dharamshala, District Kangra Himachal Pradesh, Pin – 176215. Chief Engineer (Operations) Central Zone HPSEB Limited, Mandi, District Mandi Himachal Pradesh, Pin – 175001. Chief Engineer (Operations) South Zone, HPSEB Limited, Vidyut Bhawan, Shimla Himachal Pradesh, Pin-1various04.” HPSEB Recruitment Important Dates: Last Date to Application Form- Updated Soon How to Prepare For Exam Last Time Study How to Prepare For Examination Best Tips How To Get Good Marks In Examination Note: For known more detailed information may check the following links. HPSEB Recruitment Important Links: Official Notification Official Website Read the full article
0 notes
Link
Nouvelle annonce en Tunisie
3400 Dredging installation Dredge pump type AH, AHR, HH, L, LR, M, SP, SPR, ZGB, ZGBP Pump flow 3400 cbm/h Pump capacity on dry soil 680 t/h Pump slurry head 70 m Maximum dredging depth 7 m - 25 m Slurry transportation distance 1200 m Suction / discharge pipe diameter 24 in Dredger main body characteristics Suction ladder length 12 m - 30 m Board height 2,0 m Minimum steel thickness of dredger hull Central pontoon - side, deck, bulkheads S = 10 mm - bottom S = 12 mm - transom S = 16 mm Side pontoon - bottom S = 8 mm - side, deck, bulkheads S = 6 mm Dredging pump drive - diesel engine Engine brand Russian origin or Caterpillar, MAN, Cummins, Weichai Engine power - minimal 560 kWt (762 h.p.) - optimal 800 kWt (1088 h.p.) - maximal 1040 kWt (1414 h.p.) Gearbox hydraulic Fuel tank capacity 6 cbm Diesel power station Engine brand installed Russian origin or any on demand Power station capacity - minimal 300 kWt - optimal 400 kWt - maximal 500 kWt Fuel tank capacity 4 cbm Hydraulic auxiliary engine Engine brand installed Russian origin or any on demand Hydraulic station diesel engine capacity - minimal 300 kWt - optimal 400 kWt - maximal 500 kWt Fuel tank capacity 2 cbm Ladder winch Rated pull 250 KN (20 t) Rope speed 18-35 m/min Wire rope capacity 150 m Swing and spud winches - 4 pcs Rated pull 50 KN (5,0 t) Rope speed 18-35 m/min Wire rope capacity 150 m Soil milling equipment types and parameters 1. Waterjet Water head 125 m Water capacity 630 cbm/h 2. Cutter Diameter 1,8 m Hydraulic motor power 500 kWt Auxiliary water pump Water head 80 m Water capacity 300 cbm/h Onboard slurry pipeline fittings Check hatch before slurry pump Flexible suction corrugated tube 1 pcs Turning stern device rubber cloth Rubber expansion joint for slurry pump 2 pcs Installed dredging systems and vessel equipment Counter-landslide setup YES Slurry pump rinsing system YES Outboard boxcooler Double-circuit Ejector nozzle for waterjet milling YES Improved assembly YES Machine room ventilation extract and input Side pontoons drainage system YES Machine room drainage system YES Fire extinguishing system YES Electrical equipment Elcetric rack 1 Dredger control panel 2 pcs Machine room light points 4 Otside spotlights qt. 2 Optional equipment Electric version dredger with electric driven motors, engines and equipment Dredging efficiency control system Video surveillance system Alarm and equipment malfunction warning system Digital equipment state monitoring system Consistent equipment work automatization Deck crane Piling spuds Elctric based drives Ergonomic operator's seat Strengthened hull from marine steel Anticorrosive hull coating from polyurea PHONE ME: +79517915168 PHONE ME: +79517915168 PHONE ME: +79517915168 PHONE ME: +79517915168
0 notes
Link
Nouvelle annonce en Tunisie
3800 Dredging installation Dredge pump type AH, AHR, HH, L, LR, M, SP, SPR, ZGB, ZGBP Pump flow 3800 cbm/h Pump capacity on dry soil 760 t/h Pump slurry head 70 m Maximum dredging depth 7 m - 25 m Slurry transportation distance 1200 m Suction / discharge pipe diameter 30 in Dredger main body characteristics Suction ladder length 12 m - 30 m Board height 2,0 m Minimum steel thickness of dredger hull Central pontoon - side, deck, bulkheads S = 10 mm - bottom S = 12 mm - transom S = 16 mm Side pontoon - bottom S = 8 mm - side, deck, bulkheads S = 6 mm Dredging pump drive - diesel engine Engine brand Russian origin or Caterpillar, MAN, Cummins, Weichai Engine power - minimal 595 kWt (809 h.p.) - optimal 850 kWt (1156 h.p.) - maximal 1105 kWt (1503 h.p.) Gearbox hydraulic Fuel tank capacity 6 cbm Diesel power station Engine brand installed Russian origin or any on demand Power station capacity - minimal 300 kWt - optimal 400 kWt - maximal 500 kWt Fuel tank capacity 4 cbm Hydraulic auxiliary engine Engine brand installed Russian origin or any on demand Hydraulic station diesel engine capacity - minimal 300 kWt - optimal 400 kWt - maximal 500 kWt Fuel tank capacity 2 cbm Ladder winch Rated pull 250 KN (20 t) Rope speed 18-35 m/min Wire rope capacity 150 m Swing and spud winches - 4 pcs Rated pull 50 KN (5,0 t) Rope speed 18-35 m/min Wire rope capacity 150 m Soil milling equipment types and parameters 1. Waterjet Water head 125 m Water capacity 630 cbm/h 2. Cutter Diameter 1,8 m Hydraulic motor power 500 kWt Auxiliary water pump Water head 80 m Water capacity 300 cbm/h Onboard slurry pipeline fittings Check hatch before slurry pump Flexible suction corrugated tube 1 pcs Turning stern device rubber cloth Rubber expansion joint for slurry pump 2 pcs Installed dredging systems and vessel equipment Counter-landslide setup YES Slurry pump rinsing system YES Outboard boxcooler Double-circuit Ejector nozzle for waterjet milling YES Improved assembly YES Machine room ventilation extract and input Side pontoons drainage system YES Machine room drainage system YES Fire extinguishing system YES Electrical equipment Elcetric rack 1 Dredger control panel 2 pcs Machine room light points 4 Otside spotlights qt. 2 Optional equipment Electric version dredger with electric driven motors, engines and equipment Dredging efficiency control system Video surveillance system Alarm and equipment malfunction warning system Digital equipment state monitoring system Consistent equipment work automatization Deck crane Piling spuds Elctric based drives Ergonomic operator's seat Strengthened hull from marine steel Anticorrosive hull coating from polyurea PHONE ME: +79517915168 PHONE ME: +79517915168 PHONE ME: +79517915168
0 notes
Link
Nouvelle annonce en Tunisie
3000 Dredging installation Dredge pump type AH, AHR, HH, L, LR, M, SP, SPR, ZGB, ZGBP Pump flow 3000 cbm/h Pump capacity on dry soil 600 t/h Pump slurry head 70 m Maximum dredging depth 7 m - 25 m Slurry transportation distance 1200 m Suction / discharge pipe diameter 22 in Dredger main body characteristics Suction ladder length 12 m - 30 m Board height 1,8 m Minimum steel thickness of dredger hull Central pontoon - side, deck, bulkheads S = 10 mm - bottom S = 12 mm - transom S = 16 mm Side pontoon - bottom S = 8 mm - side, deck, bulkheads S = 6 mm Dredging pump drive - diesel engine Engine brand Russian origin or Caterpillar, MAN, Cummins, Weichai Engine power - minimal 525 kWt (714 h.p.) - optimal 750 kWt (1020 h.p.) - maximal 975 kWt (1326 h.p.) Gearbox hydraulic Fuel tank capacity 6 cbm Diesel power station Engine brand installed Russian origin or any on demand Power station capacity - minimal 300 kWt - optimal 400 kWt - maximal 500 kWt Fuel tank capacity 4 cbm Hydraulic auxiliary engine Engine brand installed Russian origin or any on demand Hydraulic station diesel engine capacity - minimal 300 kWt - optimal 400 kWt - maximal 500 kWt Fuel tank capacity 2 cbm Ladder winch Rated pull 250 KN (20 t) Rope speed 18-35 m/min Wire rope capacity 150 m Swing and spud winches - 4 pcs Rated pull 50 KN (5,0 t) Rope speed 18-35 m/min Wire rope capacity 150 m Soil milling equipment types and parameters 1. Waterjet Water head 125 m Water capacity 630 cbm/h 2. Cutter Diameter 1,8 m Hydraulic motor power 500 kWt Auxiliary water pump Water head 50 m Water capacity 300 cbm/h Onboard slurry pipeline fittings Check hatch before slurry pump Flexible suction corrugated tube 1 pcs Turning stern device rubber cloth Rubber expansion joint for slurry pump 2 pcs Installed dredging systems and vessel equipment Counter-landslide setup YES Slurry pump rinsing system YES Outboard boxcooler Double-circuit Ejector nozzle for waterjet milling YES Improved assembly YES Machine room ventilation extract and input Side pontoons drainage system YES Machine room drainage system YES Fire extinguishing system YES Electrical equipment Elcetric rack 1 Dredger control panel 2 pcs Machine room light points 4 Otside spotlights qt. 2 Optional equipment Electric version dredger with electric driven motors, engines and equipment Dredging efficiency control system Video surveillance system Alarm and equipment malfunction warning system Digital equipment state monitoring system Consistent equipment work automatization Deck crane Piling spuds Elctric based drives Ergonomic operator's seat Strengthened hull from marine steel Anticorrosive hull coating from polyurea PHONE ME: +79517915168 PHONE ME: +79517915168 PHONE ME: +79517915168
0 notes
Link
Nouvelle annonce en Tunisie
2800 Dredging installation Dredge pump type AH, AHR, HH, L, LR, M, SP, SPR, ZGB, ZGBP Pump flow 2800 cbm/h Pump capacity on dry soil 560 t/h Pump slurry head 70 m Maximum dredging depth 7 m - 25 m Slurry transportation distance 1200 m Suction / discharge pipe diameter 22 in Dredger main body characteristics Suction ladder length 12 m - 30 m Board height 1,8 m Minimum steel thickness of dredger hull Central pontoon - side, deck, bulkheads S = 10 mm - bottom S = 12 mm - transom S = 16 mm Side pontoon - bottom S = 8 mm - side, deck, bulkheads S = 6 mm Dredging pump drive - diesel engine Engine brand Russian origin or Caterpillar, MAN, Cummins, Weichai Engine power - minimal 490 kWt (666 h.p.) - optimal 700 kWt (952 h.p.) - maximal 910 kWt (1238 h.p.) Gearbox hydraulic Fuel tank capacity 6 cbm Diesel power station Engine brand installed Russian origin or any on demand Power station capacity - minimal 200 kWt - optimal 300 kWt - maximal 400 kWt Fuel tank capacity 4 cbm Hydraulic auxiliary engine Engine brand installed Russian origin or any on demand Hydraulic station diesel engine capacity - minimal 200 kWt - optimal 300 kWt - maximal 400 kWt Fuel tank capacity 2 cbm Ladder winch Rated pull 200 KN (20 t) Rope speed 18-35 m/min Wire rope capacity 150 m Swing and spud winches - 4 pcs Rated pull 30 KN (3,0 t) Rope speed 18-35 m/min Wire rope capacity 150 m Soil milling equipment types and parameters 1. Waterjet Water head 90 m Water capacity 630 cbm/h 2. Cutter Diameter 1,5 m Hydraulic motor power 450 kWt Auxiliary water pump Water head 50 m Water capacity 200 cbm/h Onboard slurry pipeline fittings Check hatch before slurry pump Flexible suction corrugated tube 1 pcs Turning stern device rubber cloth Rubber expansion joint for slurry pump 2 pcs Installed dredging systems and vessel equipment Counter-landslide setup YES Slurry pump rinsing system YES Outboard boxcooler Double-circuit Ejector nozzle for waterjet milling YES Improved assembly YES Machine room ventilation extract and input Side pontoons drainage system YES Machine room drainage system YES Fire extinguishing system YES Electrical equipment Elcetric rack 1 Dredger control panel 2 pcs Machine room light points 4 Otside spotlights qt. 2 Optional equipment Electric version dredger with electric driven motors, engines and equipment Dredging efficiency control system Video surveillance system Alarm and equipment malfunction warning system Digital equipment state monitoring system Consistent equipment work automatization Deck crane Piling spuds Elctric based drives Ergonomic operator's seat Strengthened hull from marine steel Anticorrosive hull coating from polyurea PHONE ME: +79517915168 PHONE ME: +79517915168 PHONE ME: +79517915168 PHONE ME: +79517915168
0 notes
Link
Nouvelle annonce en Tunisie
2600 Dredging installation Dredge pump type AH, AHR, HH, L, LR, M, SP, SPR, ZGB, ZGBP Pump flow 2600 cbm/h Pump capacity on dry soil 520 t/h Pump slurry head 70 m Maximum dredging depth 7 m - 25 m Slurry transportation distance 1200 m Suction / discharge pipe diameter 20 in Dredger main body characteristics Suction ladder length 12 m - 30 m Board height 1,5 m Minimum steel thickness of dredger hull Central pontoon - side, deck, bulkheads S = 10 mm - bottom S = 12 mm - transom S = 16 mm Side pontoon - bottom S = 8 mm - side, deck, bulkheads S = 6 mm Dredging pump drive - diesel engine Engine brand Russian origin or Caterpillar, MAN, Cummins, Weichai Engine power - minimal 455 kWt (619 h.p.) - optimal 650 kWt (884 h.p.) - maximal 845 kWt (1149 h.p.) Gearbox hydraulic Fuel tank capacity 6 cbm Diesel power station Engine brand installed Russian origin or any on demand Power station capacity - minimal 200 kWt - optimal 300 kWt - maximal 400 kWt Fuel tank capacity 4 cbm Hydraulic auxiliary engine Engine brand installed Russian origin or any on demand Hydraulic station diesel engine capacity - minimal 200 kWt - optimal 300 kWt - maximal 400 kWt Fuel tank capacity 2 cbm Ladder winch Rated pull 200 KN (20 t) Rope speed 18-35 m/min Wire rope capacity 150 m Swing and spud winches - 4 pcs Rated pull 30 KN (3,0 t) Rope speed 18-35 m/min Wire rope capacity 150 m Soil milling equipment types and parameters 1. Waterjet Water head 90 m Water capacity 630 cbm/h 2. Cutter Diameter 1,5 m Hydraulic motor power 450 kWt Auxiliary water pump Water head 50 m Water capacity 200 cbm/h Onboard slurry pipeline fittings Check hatch before slurry pump Flexible suction corrugated tube 1 pcs Turning stern device rubber cloth Rubber expansion joint for slurry pump 2 pcs Installed dredging systems and vessel equipment Counter-landslide setup YES Slurry pump rinsing system YES Outboard boxcooler Double-circuit Ejector nozzle for waterjet milling YES Improved assembly YES Machine room ventilation extract and input Side pontoons drainage system YES Machine room drainage system YES Fire extinguishing system YES Electrical equipment Elcetric rack 1 Dredger control panel 2 pcs Machine room light points 4 Otside spotlights qt. 2 Optional equipment Electric version dredger with electric driven motors, engines and equipment Dredging efficiency control system Video surveillance system Alarm and equipment malfunction warning system Digital equipment state monitoring system Consistent equipment work automatization Deck crane Piling spuds Elctric based drives Ergonomic operator's seat Strengthened hull from marine steel Anticorrosive hull coating from polyurea PHONE ME: +79517915168 PHONE ME: +79517915168 PHONE ME: +79517915168 PHONE ME: +79517915168
0 notes