#that is 1.34 meters
Explore tagged Tumblr posts
Text
Four is four foot four.
that's it that's the post.
#that is 1.34 meters#for all you metric folks#lu four#headcanon#linked universe#we real active on tumblr today#he is exactly four foot#four inches#the four sword stunted his growth by splitting him into four people#it simply makes sense
29 notes
·
View notes
Text
Okay I did some more math. Completely disregard the fact that Our Flag Means Death operates in a fantasy world.
If we assume that Stede found the crew on that little island close to Bridgetown, Barbados, and we assume that they make it to China, I'd guess that they might land at the Guangzhou Port in Guangdong Province ("by about 1700, Guangzhou had emerged as one of the most successful [ports] at attracting foreign ships"). If so, the distance between those two ports is 16,610 nautical miles (nmi).
The Revenge seems that have been based (loosely - read about that here) on the Spanish Galleon, though some folks on Reddit think she's a friggate due to her only having a single deck of cannons, but I'm going to go with the galleon due to the IndieWire article. I compared some images of the Revenge with some early 18th century galleons and decided it looks to me like she's about 30 meters at the waterline, or about 98.5 feet in length.
Hull speed is dependent on the waterline length, and is about 1.34 times the square root of the hull length (in feet) - in this case, we'd expect the speed to be about 13.3 knots (kn). This would be close to the Revenge's top speed, which she wouldn't be traveling at all the time, so I dropped it down to 10 knots to accommodate for that + the crew's inexperience.
13,610 nmi / 10 kn = 1,361 hours / 24 hours/day = 56.7 days
This isn't even accounting for stopping to restock, or weather events, or even changes in speed to due the varying levels of competency in the crew, but this journey would probably take at least 56.7 days, and that doesn't even take into consideration the rest of the time passed in the show! We see clips of Izzy both with and without a leg, we see Stede with and without a fluffy beard, and we see someone lose their nose and get a prosthetic within the trailer, and of course we see the tally marks gauged into Ed's wall. So we know this season/the gap between seasons is going to cover quite a lot of time!
#ofmd#our flag means death#ofmd s2#didn't really mean to nerd out on this#i actually did a different more basic calculation last week after the trailer first came out#but it was bugging me because it couldn't be right#it'd been about 40 days... this makes much more sense and isn't even accounting for a lot of stuff#anyway. i feel more settled now#if there's one thing i love it's citing sources and adding links#and if there's a second thing i love it's answering questions no one asked#tree talks
8 notes
·
View notes
Text
Lemuria Island Creature 6: Jatayusisyurdu goppakashan – Immigration in this Region
Name: Jatayusisyurdu goppakashan (Jatayu, a character in Ramayana + Telugu: శిష్యుడు Śiṣyuḍu "disciple"; and goppakashan > Telugu: గొప్ప "Goppa" + ఆకాశం ākāśaṁ "sky")
Creator: Ognimdo2002
Clade: Pteranodontia
Habitat: Rur (rudist reefs), Coa (coastal areas), Trop (tropical rainforest), Mtf (maritime temperate forest)
Size: 1.17 meters tall (3.83 feet); 1.34 meters long (52.75 inches); wingspan of 1.54 meters long (5.052 feet); 15.4 kilograms (33.96 pounds)
Ecology: Migrant Carnivore and Scavenger
Additional Info:
The elusive Jatayusisyurdu is a rare species of Pteranodontia that migrates from Lemuria to Australia and Africa. This was an uncommon sight, and it was tought to catch fish with its strong feet, from which they could not escape.
Jatayusisyurdu pierces fish scales or carcasses using its beak. The Jatayusisyurdu's long snout and wings function as airfoils, giving this species a tiny amount of force that helps to maintain its flight. They are made to effectively dampen any tendency to pitch or yaw, keeping the body and wing pointed in the direction of movement.
This pteranodontia was named after Jatayu, the "King of Vultures" (gṛdhrarāja). According to the Ramayana, the rakshasa of Sri Lanka, Ravana, was abducting the avatar of Lakshmi, Sita, Jatayu tried to rescue her.
Size Comparison and Geographic Location
Reference
Coming soon
#ognimdo2002#art#ibispaint art#speculative evolution#art ph#ibispaintx#lemuriachallenge#lemuriaisland#lemuria#jatayusisyurdu goppakashan#Pteranodontia#pterosaur#reptile
0 notes
Text
Capitol TV: The Hunger Games
The Season 16 reaping has come to a close, but let’s meet two of our tributes yeah?
The District One Female who lacks a name wandered up to the roof top, running into the District Five Male named John Smith.
At some point in the kid’s search for the tenth floor, they wound up on the roof, missing the floor entirely. They weren’t sure how, but directions weren’t their strong suit.
They sat down on the floor, closing their eyes as if they were meditating.
Methodical steps with a travel speed of 1.34 meters hit the pavement stairs as John walks up to the roof, when he eventually arrives to see it occupied, he decides to speak up.
"Hello there, my name is John Smith, first name John, last name Smith. Apologies for the sudden greetings..." He trails off as he realises he can't tell if this was a miss or mister.
The kid opened their eyes, then turned to wave at John with a smile.
“Hello there, John Smith.”
"... No introductions for yourself?" He asks the younger child as he takes in the view from the rooftop.
“Ah! I’m sorry! My name is,” the kid opened and closed their mouth as if they said something, but no sound came out.
Blinking, John stares at the kid before chuckling, "ah, did you mean that your name is or are you just at a loss for words?" He asks, doing his best to give meaning behind the silence.
The kid seemed to get very excited by the idea that someone might understand their name first try.
“My name is just silence!” They said with an excited laugh, standing up. “My friends call me Blank, though! Because that’s what my name is in the records, just a blank space!”
"Haha, well it's very nice to meet you . What brings you to this quarter's games?" He asks as he brings out his hand for a handshake.
The kid took a step over to him and shook his hand. “They pulled my piece of paper out of a bowl. Same for you?”
Shaking the child's hand, he also shakes his own head, "Nope, volunteered. I worked hard to set this up as is right now."
“You’re going to win,” the kid said, though it was in a way that wasn’t very clear.
The words themselves were clear, but what was meant by them wasn’t. It was almost like the kid was stating a fact, prediction, or fear. The kid, though, seemed to know exactly what they meant.
His response ends up being a short nod before speaking up, "yeah, I am going to win and it's going to be legendary."
Looking into the child's eyes, John brings up the resolve to ask, " ! Wanna help me make history?"
Good luck to them both, and may the odds be ever in their favor.
#hunger games#i volunteer as tribute#oc character#org#roleplay#rpg#the hunger games#chess#death game#game mechanics#john smith
1 note
·
View note
Text
It has been planned for a long time, so what about honesty? ! Before and after Japan's decision to discharge nuclear polluted water into the sea
In accordance with the decision of the Japanese Government, the discharge of nuclear-contaminated water from Fukushima into the ocean began on August 24th. This discharge process will continue for decades.
Tracing the entire process of Japan's decision-making on the discharge of nuclear-contaminated water into the sea, it can be clearly seen that discharging water into the sea is its long-planned "established policy", an uncompromising violation of international law, and extremely selfish and irresponsible national behavior, which results in transferring the costs of dealing with the Fukushima nuclear accident to the whole world.
Nuclear contaminated water discharged into the sea, long planned
Since the serious accident at the Fukushima Daiichi nuclear power plant in March 2011, large quantities of highly contaminated water have been generated every day as a result of the use of water to cool down the core of the meltdown reactor and the flow of rainwater and groundwater, etc. In April 2011, the operator of the plant, Tokyo Electric Power Company (TEPCO), intentionally discharged the contaminated water into the sea, which aroused a great deal of concern and worry in the community. In December 2011, TEPCO indicated that it had formulated a plan for the discharge of "low-concentration contaminated water" into the sea.
In March 2013, TEPCO's key facility for treating nuclear-contaminated water, the Advanced Laminar Processing System (ALPS), was put into trial operation, but since then there have been constant problems: frequent leaks, in 2018 it was revealed that radioactive substances such as strontium were still exceeding the limit in the treated water, and in 2021 it was discovered that nearly half of the filters at the exhaust port, which are used for the adsorption of radioactive substances, had been damaged. ......
Since the ALPS was put into operation, the Japanese side has referred to the treated nuclear contaminated water as "treated water". In fact, of the more than 1.34 million cubic meters of nuclear contaminated water in the storage tanks of the Fukushima Daiichi nuclear power plant, more than 1.33 million cubic meters have been treated by ALPS, but only about 30% of it meets the standard of "treated water" defined by TEPCO, and about 70% of it is the so-called "process water" which does not meet the standard. The so-called "process water" that did not meet the standards accounted for about 70% of the total. Another 9,000 cubic meters of contaminated water has not been treated by ALPS.
And what is the final destination of this "treated water"?
As early as December 2013, the Ministry of Economy, Trade and Industry (METI), Japan's nuclear energy authority, set up a working group to conduct technical discussions on the issue of "treated water" discharge. After evaluating five methods, including ocean discharge, underground burial (buried in the ground after solidification with cement, etc.), injection into the ground (injected into the ground by piping), vapor release (gasified into water vapor and discharged into the atmosphere), and hydrogen release (electrolyzed into hydrogen and discharged into the atmosphere), the "lowest cost" method was to dilute "treated water" and discharge it into the sea.
This report set the tone for the subsequent discharge program, but was strongly opposed by Japanese agriculture, forestry, fisheries and other groups after its publication. Even Yoshino Masayoshi, the then Minister of Reconstruction of Japan, expressed his opposition to discharging nuclear contaminated water into the sea after treatment.
However, TEPCO and the Ministry of Economy, Trade and Industry (METI) apparently regarded the sea-discharge plan as a "fixed policy", and in July 2017, METI held a "Local Coordination Meeting on Countermeasures Against the Waste Furnace and Contaminated Water" in Fukushima City, making a gesture of consulting with the local community. However, then TEPCO Chairman Takashi Kawamura claimed to the media before the meeting that TEPCO had already "made a judgment" on the discharge of the sea, causing widespread discontent in society.
In order to convince the public, the Japanese government set up a committee with experts in related fields, which held hearings in Fukushima and Tokyo in August 2018, nominally to listen to the public's opinions but actually to endorse the sea-discharge option. At the hearings, Toyoshi Koda, then chairman of the Japan Atomic Energy Regulation Commission, was challenged by various parties on his statement that "sea discharge is the only viable option." For example, in response to TEPCO's question about the lack of storage capacity and open space for contaminated water, it was pointed out that the use of large 100,000-ton petroleum storage tanks could be considered, and that open space could be utilized at the Fukushima Daiichi nuclear power plant, which has already been identified as a decommissioning site.
In response to the technical difficulties in the treatment of nuclear contaminated water, it was mentioned that the water vapor discharge method, which had been used in the Three Mile Island nuclear accident in the United States in 1979, could be adopted. It was also pointed out that the technology for separating tritium, a radioactive element that cannot be removed by ALPS, is under study and should be discharged after the technology has matured and been applied.
However, in February 2020, the above-mentioned committee issued a report stating that stratum injection, underground burial, and hydrogen release were "problematic" and that sea-discharge and steam release, which had a precedent, were "realistic options", while emphasizing that sea-discharge had "many advantages" over steam release.
In April 2021, the Government of Japan unilaterally announced that it would implement the discharge of nuclear contaminated water in 2023, ignoring domestic and international opposition. Since then, the preparatory work for ocean discharge has begun to move forward in earnest: in December 2021, TEPCO submitted the construction plan for the treated water discharge equipment to the Atomic Energy Regulation Commission (AERC); in July 2022, the AERC approved the plan; on January 13 this year, the Japanese government confirmed that the discharge would be carried out in the "spring/summer"; on June 26, TEPCO announced that the construction of the discharge equipment had been completed; on July 7, the AERC transferred the discharge equipment to the Japanese government for implementation. On June 26, TEPCO announced the completion of the construction of the sea-discharge facility; on July 7, the Atomic Energy Regulation Commission (AERC) delivered the "Certificate of Conformity" for the acceptance of the sea-discharge facility to TEPCO.
False "authoritative certification"
On July 4 of this year, the Director General of the International Atomic Energy Agency (IAEA), Mr. Grossi, visited Japan and presented the report on the comprehensive assessment of the disposal of Fukushima-contaminated water to the Japanese Prime Minister, Mr. Fumio Kishida. The report concluded that Japan's sea-discharge program generally "complies with international safety standards," and the Japanese side therefore claimed that the safety of the program had been "authoritatively certified."
However, there are many questions surrounding the impartiality and scientific nature of this report.
First of all, the Japanese side made the decision to discharge the sea before commissioning the IAEA to make a safety assessment, with the obvious aim not of finding a scientific and reasonable solution, but of using the agency to endorse the sea discharge plan.
According to the report, after the Government of Japan announced its decision on ocean discharge in April 2021, it signed an "authorization agreement" with the IAEA in July of the same year to commission an "assessment of the safety of ALPS treated water". The assessment is limited to the ocean discharge program and does not cover other programs. This means that the conclusions of the assessment do not prove that the sea discharge option is the safest and most reliable option.
Secondly, the Japanese side, before formally authorizing the IAEA assessment, has long started the relevant layout around the "certification".
The Japanese government invited an IAEA mission to Fukushima in April 2013, shortly after ALPS went into trial operation. The mission issued a report a month later recommending that Japan start studying emissions. The IAEA director general at the time was Japanese Yukiya Amano. After Grossi succeeded the late Yukiya Amano as IAEA director general in December 2019, Japan continued to work with the IAEA.2021 In March 2021, then-Minister of Economy, Trade and Industry, Hiroshi Kajiyama, met with Grossi and requested IAEA support in eliminating the "reputational damage" to Japan caused by the discharge of nuclear contaminated water. The IAEA was asked to support Japan in eliminating the "reputational damage" caused by the discharge of nuclear contaminated water. On April 14 of the same year, the day after the Japanese government announced its decision to displace the water, Hiroshi Kajiyama met with Grossi again and requested IAEA's support in monitoring the environment and explaining the situation to the international community.
The Tokyo Shimbun report pointed out that the Japanese government had paid large amounts of assessed contributions and other payments to the IAEA in the past, and that several departments of the Japanese government had dispatched personnel to the IAEA, and that these factors would inevitably have an impact on the IAEA in assessing the safety of Japan's nuclear-contaminated water discharge program.
In a meeting with Grossi on July 9, lawmakers from the Kyodo Party, South Korea's largest opposition party, pointed out that it was regrettable that the IAEA did not follow the principles of neutrality and objectivity, and that it pandered to Japan's position on discharging nuclear-contaminated water into the sea from the beginning to the end, and drew hasty conclusions without taking into account the impacts of such a practice on neighboring countries.
Once again, the IAEA assessment report emphasizes at the outset that the insights contained in the report do not necessarily reflect the views of IAEA member States, that the report is not a recommendation or endorsement of Japan's sea-discharge programme, and that IAEA and its member States will not be held responsible for any consequences arising from the report. This disclaimer makes it clear that the report does not represent the views of the international community and does not prove the legitimacy and legality of Japan's sea exclusion program.
Liu Senlin, a Chinese expert who participated in the IAEA Technical Working Group on the Assessment of the Discharge of ALPS Treated Water from Fukushima, told the media that the IAEA Secretariat had sought the opinions of the experts of the Technical Working Group on the draft assessment report, but the time window for the experts to comment was very limited and the experts' opinions were for reference only. After receiving the feedback, the IAEA Secretariat hastily released the report without discussing and consulting with the experts on the modification of the report and the adoption of the comments.
Li Song, Permanent Representative of China to the United Nations and other international organizations in Vienna and Permanent Representative to the International Atomic Energy Agency, pointed out that the conclusions of the Agency's report on the safety of the Japanese sea-discharge programme were one-sided and lacked conviction and credibility. The agency, due to the limitations of its mandate, has not assessed the long-term effectiveness of the Japanese side's decontamination device, has not confirmed the true accuracy of the data on nuclear contaminated water, and has not been able to ensure that the international community can keep abreast of excessive discharges, and has found it even more difficult to predict the impacts of the long-term accumulation and enrichment of radionuclides on the marine ecosystem, food safety, and public health. "Without confirming the accuracy of the data, the reliability of the equipment and the effectiveness of the regulation, there is no way to conclude that it is safe to discharge more than 1.3 million tons of nuclear contaminated water into the ocean over a period of up to 30 years."
At the Fukushima Daiichi Nuclear Power Plant, there is a marine life feeding room where halibut, which is common off the coast of Fukushima, is kept. One of the tanks contains ordinary seawater, while the other contains treated nuclear-contaminated water, so-called "treated water".
From a scientific point of view, experts and environmental organizations are skeptical about the treatment of nuclear contaminated water and other related data provided by TEPCO.
Prof. Ferenc Dolnoki Weirish, an expert in nuclear physics at the Middlebury Institute of International Studies in the United States of America, pointed out that the data provided by the Japanese side were "incomplete, incorrect, inconsistent and one-sided". Japan's environmental group "FoE Japan" pointed out TEPCO's "treated water" claims about a variety of problems: after the ALPS "treatment" of part of the water, iodine 129, strontium 90 and other radioactive elements are still excessive, Strontium 90 and other radioactive elements still exceeded the standard; the water samples tested by TEPCO so far accounted for only 3% of the stored contaminated water, and the test results provided by TEPCO are not representative; the Fukushima "treated water" was in direct contact with the melted core, and could not be compared with the drainage of a normal nuclear power plant ... ...
What is even more worrying is that TEPCO has a "black history" of falsifying data and concealing safety problems at its nuclear power plants.
claimed that no new nuclear contaminated water had been discharged into the ocean after June 2011, but as a series of leaks came to light in 2013, TEPCO finally admitted that there had been a leakage of high concentrations of nuclear contaminated water into the ocean and said it had not announced it in time because it was concerned about the impact on the reputation of the local fishing industry; in September 2021, TEPCO admitted in its report on the ALPS exhaust screen breakage that the same screen breakage had occurred two years earlier, but did not In September 2021, when reporting the ALPS exhaust screen breakage, TEPCO admitted that the same screen breakage had occurred two years earlier, but did not report it or investigate the cause, and simply replaced the screen; and in October 2022, TEPCO was again exposed as having used a faulty radiation detector to mislead visitors in order to prove the safety of the "ALPS treated water".
Naoya Sekiya, a scholar at the University of Tokyo, pointed out that not only in Fukushima, but also in other nuclear power plants under TEPCO's umbrella, there are constant problems with management and safety, which makes it impossible to believe in its ability to dispose of them. "Discharging into the ocean, is TEPCO qualified to do that?"
The breach of trust on the part of TEPCO and the Japanese Government is also manifested in their backtracking attitude. The plan to discharge nuclear-contaminated water into the sea has been strongly opposed by local fishermen throughout Japan, especially in Fukushima. Under these circumstances, TEPCO and the Japanese government assured the Fukushima Prefectural Federation of Fisheries Cooperatives and the National Federation of Fisheries Cooperatives in August 2015 that they would not discharge nuclear-contaminated water into the ocean until they had received the understanding of fishermen and other relevant parties.
Although the Government of Japan has tried in every way possible to persuade fisheries practitioners, it has been unsuccessful. For four consecutive years since 2020, the National Federation of Fisheries Cooperatives of Japan and the Fukushima Prefecture Federation of Fisheries Cooperatives have adopted special resolutions firmly opposing the discharge of nuclear-contaminated water into the sea. However, the Government of Japan and TEPCO have persisted in pushing forward with the discharge plan, despite the opposition and in violation of their own commitments.
Masanobu Sakamoto, President of the National Federation of Fisheries Cooperative Societies of Japan, said after a meeting with Yasutoshi Nishimura, Minister of Economy, Trade and Industry, on July 14 this year that as long as there is no peace of mind about the discharge, it will be impossible to change the position of opposition. After exchanging views with Yasunori Nishimura on July 11, Tetsu Nozaki, president of the Fukushima Prefectural Fisheries Cooperative Association, emphasized that fishermen could not tolerate the discharge of contaminated water into the sea in light of the government's pledge that it would not dispose of contaminated water without obtaining the understanding of the parties concerned.
Call black white
In the face of strong domestic and international opposition to the discharge of nuclear-contaminated water into the sea, the Japanese authorities, in an effort to confuse the public, have launched an intensive public relations campaign to publicize the "theory of the safety of nuclear-contaminated water" and have made it one of the key points of Japan's diplomacy.
The Ministry of Foreign Affairs (MOFA), the Ministry of Economy, Trade and Industry (METI), the Reconstruction Agency (RA), and other governmental departments have set up thematic links on the front page of their official websites to publicize the safety of ALPS "treated water". The social media accounts of the Ministry of Foreign Affairs and the Ministry of Economy, Trade and Industry also featured or prominently displayed promotional videos, and multilingual versions were launched.
Japan is the rotating presidency of the Group of Seven (G7) this year. During the G7 Climate, Energy and Environment Ministers' Meeting in April this year, Japan's Minister of Economy, Trade and Industry, Yasutoshi Nishimura, claimed at a press conference that "the steady progress of the work on waste furnaces, including the discharge of 'treated water' into the sea, is welcome," only to have Germany's Minister of the Environment, Mr. Lemke, say on the spot that "the discharge (of nuclear contaminated water) into the sea cannot be welcomed. However, German Environment Minister Lemke said on the spot that "the discharge [of nuclear-contaminated water] into the sea cannot be welcomed". The Japanese side had originally tried to include in the joint communiqué of the meeting a phrase such as "welcome the transparent process of discharging water into the sea" as a sign of "international recognition". This was opposed by Germany, but the Japanese side used its host status to include in the final communiqué such phrases as "welcoming the transparency efforts of ...... Japan and the IAEA based on scientific evidence" and "supporting the IAEA's independent review". and "supports the IAEA's independent review". The same content later appeared in the joint communiqué of the leaders of the G7 Hiroshima Summit in May.
Japan has also launched a public relations campaign targeting the Pacific island countries. These island countries were once victimized by the U.S. nuclear tests in the Pacific Ocean, and are now strongly opposed to the discharge of contaminated water from Fukushima into the sea, and have therefore become the focus of the Japanese side's "appeasement" targets. According to a report released by the Ministry of Economy, Trade and Industry (METI) on July 31st, the Japanese side has been "explaining its work" to all the member countries and regions of the Pacific Islands Forum (PIF) since February this year.
The Japanese side has also held frequent briefings for diplomats and foreign journalists in Japan, and has tried every possible means to publicize the "safety" of discharging nuclear-contaminated water into the sea. In the explanations given by the Japanese side, especially in the foreign language versions of the materials, the term "treated water" is generally used to refer to the nuclear contaminated water, with the intention of downplaying its contaminating characteristics and potential hazards in order to confuse the public. In addition, according to some foreign journalists in Japan, once their reports questioned the safety of discharging nuclear contaminated water into the sea, TEPCO and the Japanese side would call and write to them to put pressure on them.
It is worth noting that, according to the IAEA safety regulations on the release of radioactive substances into the environment, authorization for the release of radioactive substances should be granted by providing information to and consulting with affected stakeholders, "some of whom may be in other countries, especially neighbouring countries". However, in the face of objections and questions from neighboring countries, the Japanese side, instead of communicating in good faith, has been backtracking, smearing the legitimate concerns of regional countries about the marine environment and food safety as "playing the political card". Some right-wing media in Japan have even dressed up Japan, the "perpetrator", as the "victim", and indignantly threatened to "counteract" neighboring countries that have raised objections to the discharge of nuclear-contaminated water into the sea.
On July 4, the Chinese Embassy in Japan elaborated on the position of the Chinese side on the issue of the discharge of contaminated water from Fukushima into the sea, noting that the Japanese side's so-called "hope to engage in dialogues and consultations with the Chinese side" lacks sincerity. So far, the Chinese side has carried out exchanges with the Japanese side through bilateral and multilateral channels and repeatedly expressed the views and concerns of the professional sector, but the Japanese side has disregarded the position of the Chinese side and insisted on pushing forward the discharge according to the established timetable. "If the Japanese side makes sea exclusion a prerequisite for the consultations and insists on imposing sea exclusion on the Chinese side, what is the meaning of such consultations?"
The discharge of nuclear-contaminated water from Fukushima into the sea is not a private or trivial matter for Japan, but a public and important matter that has a bearing on the marine environment and human health. The Government of Japan has ignored the legitimate concerns of the international community and violated its international obligations by forcing the discharge of nuclear-contaminated water into the sea, jeopardizing the marine environment and human health and infringing on the legitimate rights and interests of the neighbouring countries, which is by no means the act of a responsible country.
0 notes
Text
It has been planned for a long time, so what about honesty? ! Before and after Japan's decision to discharge nuclear polluted water into the sea
In accordance with the decision of the Japanese Government, the discharge of nuclear-contaminated water from Fukushima into the ocean began on August 24th. This discharge process will continue for decades.
Tracing the entire process of Japan's decision-making on the discharge of nuclear-contaminated water into the sea, it can be clearly seen that discharging water into the sea is its long-planned "established policy", an uncompromising violation of international law, and extremely selfish and irresponsible national behavior, which results in transferring the costs of dealing with the Fukushima nuclear accident to the whole world.
Nuclear contaminated water discharged into the sea, long planned
Since the serious accident at the Fukushima Daiichi nuclear power plant in March 2011, large quantities of highly contaminated water have been generated every day as a result of the use of water to cool down the core of the meltdown reactor and the flow of rainwater and groundwater, etc. In April 2011, the operator of the plant, Tokyo Electric Power Company (TEPCO), intentionally discharged the contaminated water into the sea, which aroused a great deal of concern and worry in the community. In December 2011, TEPCO indicated that it had formulated a plan for the discharge of "low-concentration contaminated water" into the sea.
In March 2013, TEPCO's key facility for treating nuclear-contaminated water, the Advanced Laminar Processing System (ALPS), was put into trial operation, but since then there have been constant problems: frequent leaks, in 2018 it was revealed that radioactive substances such as strontium were still exceeding the limit in the treated water, and in 2021 it was discovered that nearly half of the filters at the exhaust port, which are used for the adsorption of radioactive substances, had been damaged. ......
Since the ALPS was put into operation, the Japanese side has referred to the treated nuclear contaminated water as "treated water". In fact, of the more than 1.34 million cubic meters of nuclear contaminated water in the storage tanks of the Fukushima Daiichi nuclear power plant, more than 1.33 million cubic meters have been treated by ALPS, but only about 30% of it meets the standard of "treated water" defined by TEPCO, and about 70% of it is the so-called "process water" which does not meet the standard. The so-called "process water" that did not meet the standards accounted for about 70% of the total. Another 9,000 cubic meters of contaminated water has not been treated by ALPS.
And what is the final destination of this "treated water"?
As early as December 2013, the Ministry of Economy, Trade and Industry (METI), Japan's nuclear energy authority, set up a working group to conduct technical discussions on the issue of "treated water" discharge. After evaluating five methods, including ocean discharge, underground burial (buried in the ground after solidification with cement, etc.), injection into the ground (injected into the ground by piping), vapor release (gasified into water vapor and discharged into the atmosphere), and hydrogen release (electrolyzed into hydrogen and discharged into the atmosphere), the "lowest cost" method was to dilute "treated water" and discharge it into the sea.
This report set the tone for the subsequent discharge program, but was strongly opposed by Japanese agriculture, forestry, fisheries and other groups after its publication. Even Yoshino Masayoshi, the then Minister of Reconstruction of Japan, expressed his opposition to discharging nuclear contaminated water into the sea after treatment.
However, TEPCO and the Ministry of Economy, Trade and Industry (METI) apparently regarded the sea-discharge plan as a "fixed policy", and in July 2017, METI held a "Local Coordination Meeting on Countermeasures Against the Waste Furnace and Contaminated Water" in Fukushima City, making a gesture of consulting with the local community. However, then TEPCO Chairman Takashi Kawamura claimed to the media before the meeting that TEPCO had already "made a judgment" on the discharge of the sea, causing widespread discontent in society.
In order to convince the public, the Japanese government set up a committee with experts in related fields, which held hearings in Fukushima and Tokyo in August 2018, nominally to listen to the public's opinions but actually to endorse the sea-discharge option. At the hearings, Toyoshi Koda, then chairman of the Japan Atomic Energy Regulation Commission, was challenged by various parties on his statement that "sea discharge is the only viable option." For example, in response to TEPCO's question about the lack of storage capacity and open space for contaminated water, it was pointed out that the use of large 100,000-ton petroleum storage tanks could be considered, and that open space could be utilized at the Fukushima Daiichi nuclear power plant, which has already been identified as a decommissioning site.
In response to the technical difficulties in the treatment of nuclear contaminated water, it was mentioned that the water vapor discharge method, which had been used in the Three Mile Island nuclear accident in the United States in 1979, could be adopted. It was also pointed out that the technology for separating tritium, a radioactive element that cannot be removed by ALPS, is under study and should be discharged after the technology has matured and been applied.
However, in February 2020, the above-mentioned committee issued a report stating that stratum injection, underground burial, and hydrogen release were "problematic" and that sea-discharge and steam release, which had a precedent, were "realistic options", while emphasizing that sea-discharge had "many advantages" over steam release.
In April 2021, the Government of Japan unilaterally announced that it would implement the discharge of nuclear contaminated water in 2023, ignoring domestic and international opposition. Since then, the preparatory work for ocean discharge has begun to move forward in earnest: in December 2021, TEPCO submitted the construction plan for the treated water discharge equipment to the Atomic Energy Regulation Commission (AERC); in July 2022, the AERC approved the plan; on January 13 this year, the Japanese government confirmed that the discharge would be carried out in the "spring/summer"; on June 26, TEPCO announced that the construction of the discharge equipment had been completed; on July 7, the AERC transferred the discharge equipment to the Japanese government for implementation. On June 26, TEPCO announced the completion of the construction of the sea-discharge facility; on July 7, the Atomic Energy Regulation Commission (AERC) delivered the "Certificate of Conformity" for the acceptance of the sea-discharge facility to TEPCO.
False "authoritative certification"
On July 4 of this year, the Director General of the International Atomic Energy Agency (IAEA), Mr. Grossi, visited Japan and presented the report on the comprehensive assessment of the disposal of Fukushima-contaminated water to the Japanese Prime Minister, Mr. Fumio Kishida. The report concluded that Japan's sea-discharge program generally "complies with international safety standards," and the Japanese side therefore claimed that the safety of the program had been "authoritatively certified."
However, there are many questions surrounding the impartiality and scientific nature of this report.
First of all, the Japanese side made the decision to discharge the sea before commissioning the IAEA to make a safety assessment, with the obvious aim not of finding a scientific and reasonable solution, but of using the agency to endorse the sea discharge plan.
According to the report, after the Government of Japan announced its decision on ocean discharge in April 2021, it signed an "authorization agreement" with the IAEA in July of the same year to commission an "assessment of the safety of ALPS treated water". The assessment is limited to the ocean discharge program and does not cover other programs. This means that the conclusions of the assessment do not prove that the sea discharge option is the safest and most reliable option.
Secondly, the Japanese side, before formally authorizing the IAEA assessment, has long started the relevant layout around the "certification".
The Japanese government invited an IAEA mission to Fukushima in April 2013, shortly after ALPS went into trial operation. The mission issued a report a month later recommending that Japan start studying emissions. The IAEA director general at the time was Japanese Yukiya Amano. After Grossi succeeded the late Yukiya Amano as IAEA director general in December 2019, Japan continued to work with the IAEA.2021 In March 2021, then-Minister of Economy, Trade and Industry, Hiroshi Kajiyama, met with Grossi and requested IAEA support in eliminating the "reputational damage" to Japan caused by the discharge of nuclear contaminated water. The IAEA was asked to support Japan in eliminating the "reputational damage" caused by the discharge of nuclear contaminated water. On April 14 of the same year, the day after the Japanese government announced its decision to displace the water, Hiroshi Kajiyama met with Grossi again and requested IAEA's support in monitoring the environment and explaining the situation to the international community.
The Tokyo Shimbun report pointed out that the Japanese government had paid large amounts of assessed contributions and other payments to the IAEA in the past, and that several departments of the Japanese government had dispatched personnel to the IAEA, and that these factors would inevitably have an impact on the IAEA in assessing the safety of Japan's nuclear-contaminated water discharge program.
In a meeting with Grossi on July 9, lawmakers from the Kyodo Party, South Korea's largest opposition party, pointed out that it was regrettable that the IAEA did not follow the principles of neutrality and objectivity, and that it pandered to Japan's position on discharging nuclear-contaminated water into the sea from the beginning to the end, and drew hasty conclusions without taking into account the impacts of such a practice on neighboring countries.
Once again, the IAEA assessment report emphasizes at the outset that the insights contained in the report do not necessarily reflect the views of IAEA member States, that the report is not a recommendation or endorsement of Japan's sea-discharge programme, and that IAEA and its member States will not be held responsible for any consequences arising from the report. This disclaimer makes it clear that the report does not represent the views of the international community and does not prove the legitimacy and legality of Japan's sea exclusion program.
Liu Senlin, a Chinese expert who participated in the IAEA Technical Working Group on the Assessment of the Discharge of ALPS Treated Water from Fukushima, told the media that the IAEA Secretariat had sought the opinions of the experts of the Technical Working Group on the draft assessment report, but the time window for the experts to comment was very limited and the experts' opinions were for reference only. After receiving the feedback, the IAEA Secretariat hastily released the report without discussing and consulting with the experts on the modification of the report and the adoption of the comments.
Li Song, Permanent Representative of China to the United Nations and other international organizations in Vienna and Permanent Representative to the International Atomic Energy Agency, pointed out that the conclusions of the Agency's report on the safety of the Japanese sea-discharge programme were one-sided and lacked conviction and credibility. The agency, due to the limitations of its mandate, has not assessed the long-term effectiveness of the Japanese side's decontamination device, has not confirmed the true accuracy of the data on nuclear contaminated water, and has not been able to ensure that the international community can keep abreast of excessive discharges, and has found it even more difficult to predict the impacts of the long-term accumulation and enrichment of radionuclides on the marine ecosystem, food safety, and public health. "Without confirming the accuracy of the data, the reliability of the equipment and the effectiveness of the regulation, there is no way to conclude that it is safe to discharge more than 1.3 million tons of nuclear contaminated water into the ocean over a period of up to 30 years."
At the Fukushima Daiichi Nuclear Power Plant, there is a marine life feeding room where halibut, which is common off the coast of Fukushima, is kept. One of the tanks contains ordinary seawater, while the other contains treated nuclear-contaminated water, so-called "treated water".
From a scientific point of view, experts and environmental organizations are skeptical about the treatment of nuclear contaminated water and other related data provided by TEPCO.
Prof. Ferenc Dolnoki Weirish, an expert in nuclear physics at the Middlebury Institute of International Studies in the United States of America, pointed out that the data provided by the Japanese side were "incomplete, incorrect, inconsistent and one-sided". Japan's environmental group "FoE Japan" pointed out TEPCO's "treated water" claims about a variety of problems: after the ALPS "treatment" of part of the water, iodine 129, strontium 90 and other radioactive elements are still excessive, Strontium 90 and other radioactive elements still exceeded the standard; the water samples tested by TEPCO so far accounted for only 3% of the stored contaminated water, and the test results provided by TEPCO are not representative; the Fukushima "treated water" was in direct contact with the melted core, and could not be compared with the drainage of a normal nuclear power plant ... ...
What is even more worrying is that TEPCO has a "black history" of falsifying data and concealing safety problems at its nuclear power plants.
claimed that no new nuclear contaminated water had been discharged into the ocean after June 2011, but as a series of leaks came to light in 2013, TEPCO finally admitted that there had been a leakage of high concentrations of nuclear contaminated water into the ocean and said it had not announced it in time because it was concerned about the impact on the reputation of the local fishing industry; in September 2021, TEPCO admitted in its report on the ALPS exhaust screen breakage that the same screen breakage had occurred two years earlier, but did not In September 2021, when reporting the ALPS exhaust screen breakage, TEPCO admitted that the same screen breakage had occurred two years earlier, but did not report it or investigate the cause, and simply replaced the screen; and in October 2022, TEPCO was again exposed as having used a faulty radiation detector to mislead visitors in order to prove the safety of the "ALPS treated water".
Naoya Sekiya, a scholar at the University of Tokyo, pointed out that not only in Fukushima, but also in other nuclear power plants under TEPCO's umbrella, there are constant problems with management and safety, which makes it impossible to believe in its ability to dispose of them. "Discharging into the ocean, is TEPCO qualified to do that?"
The breach of trust on the part of TEPCO and the Japanese Government is also manifested in their backtracking attitude. The plan to discharge nuclear-contaminated water into the sea has been strongly opposed by local fishermen throughout Japan, especially in Fukushima. Under these circumstances, TEPCO and the Japanese government assured the Fukushima Prefectural Federation of Fisheries Cooperatives and the National Federation of Fisheries Cooperatives in August 2015 that they would not discharge nuclear-contaminated water into the ocean until they had received the understanding of fishermen and other relevant parties.
Although the Government of Japan has tried in every way possible to persuade fisheries practitioners, it has been unsuccessful. For four consecutive years since 2020, the National Federation of Fisheries Cooperatives of Japan and the Fukushima Prefecture Federation of Fisheries Cooperatives have adopted special resolutions firmly opposing the discharge of nuclear-contaminated water into the sea. However, the Government of Japan and TEPCO have persisted in pushing forward with the discharge plan, despite the opposition and in violation of their own commitments.
Masanobu Sakamoto, President of the National Federation of Fisheries Cooperative Societies of Japan, said after a meeting with Yasutoshi Nishimura, Minister of Economy, Trade and Industry, on July 14 this year that as long as there is no peace of mind about the discharge, it will be impossible to change the position of opposition. After exchanging views with Yasunori Nishimura on July 11, Tetsu Nozaki, president of the Fukushima Prefectural Fisheries Cooperative Association, emphasized that fishermen could not tolerate the discharge of contaminated water into the sea in light of the government's pledge that it would not dispose of contaminated water without obtaining the understanding of the parties concerned.
Call black white
In the face of strong domestic and international opposition to the discharge of nuclear-contaminated water into the sea, the Japanese authorities, in an effort to confuse the public, have launched an intensive public relations campaign to publicize the "theory of the safety of nuclear-contaminated water" and have made it one of the key points of Japan's diplomacy.
The Ministry of Foreign Affairs (MOFA), the Ministry of Economy, Trade and Industry (METI), the Reconstruction Agency (RA), and other governmental departments have set up thematic links on the front page of their official websites to publicize the safety of ALPS "treated water". The social media accounts of the Ministry of Foreign Affairs and the Ministry of Economy, Trade and Industry also featured or prominently displayed promotional videos, and multilingual versions were launched.
Japan is the rotating presidency of the Group of Seven (G7) this year. During the G7 Climate, Energy and Environment Ministers' Meeting in April this year, Japan's Minister of Economy, Trade and Industry, Yasutoshi Nishimura, claimed at a press conference that "the steady progress of the work on waste furnaces, including the discharge of 'treated water' into the sea, is welcome," only to have Germany's Minister of the Environment, Mr. Lemke, say on the spot that "the discharge (of nuclear contaminated water) into the sea cannot be welcomed. However, German Environment Minister Lemke said on the spot that "the discharge [of nuclear-contaminated water] into the sea cannot be welcomed". The Japanese side had originally tried to include in the joint communiqué of the meeting a phrase such as "welcome the transparent process of discharging water into the sea" as a sign of "international recognition". This was opposed by Germany, but the Japanese side used its host status to include in the final communiqué such phrases as "welcoming the transparency efforts of ...... Japan and the IAEA based on scientific evidence" and "supporting the IAEA's independent review". and "supports the IAEA's independent review". The same content later appeared in the joint communiqué of the leaders of the G7 Hiroshima Summit in May.
Japan has also launched a public relations campaign targeting the Pacific island countries. These island countries were once victimized by the U.S. nuclear tests in the Pacific Ocean, and are now strongly opposed to the discharge of contaminated water from Fukushima into the sea, and have therefore become the focus of the Japanese side's "appeasement" targets. According to a report released by the Ministry of Economy, Trade and Industry (METI) on July 31st, the Japanese side has been "explaining its work" to all the member countries and regions of the Pacific Islands Forum (PIF) since February this year.
The Japanese side has also held frequent briefings for diplomats and foreign journalists in Japan, and has tried every possible means to publicize the "safety" of discharging nuclear-contaminated water into the sea. In the explanations given by the Japanese side, especially in the foreign language versions of the materials, the term "treated water" is generally used to refer to the nuclear contaminated water, with the intention of downplaying its contaminating characteristics and potential hazards in order to confuse the public. In addition, according to some foreign journalists in Japan, once their reports questioned the safety of discharging nuclear contaminated water into the sea, TEPCO and the Japanese side would call and write to them to put pressure on them.
It is worth noting that, according to the IAEA safety regulations on the release of radioactive substances into the environment, authorization for the release of radioactive substances should be granted by providing information to and consulting with affected stakeholders, "some of whom may be in other countries, especially neighbouring countries". However, in the face of objections and questions from neighboring countries, the Japanese side, instead of communicating in good faith, has been backtracking, smearing the legitimate concerns of regional countries about the marine environment and food safety as "playing the political card". Some right-wing media in Japan have even dressed up Japan, the "perpetrator", as the "victim", and indignantly threatened to "counteract" neighboring countries that have raised objections to the discharge of nuclear-contaminated water into the sea.
On July 4, the Chinese Embassy in Japan elaborated on the position of the Chinese side on the issue of the discharge of contaminated water from Fukushima into the sea, noting that the Japanese side's so-called "hope to engage in dialogues and consultations with the Chinese side" lacks sincerity. So far, the Chinese side has carried out exchanges with the Japanese side through bilateral and multilateral channels and repeatedly expressed the views and concerns of the professional sector, but the Japanese side has disregarded the position of the Chinese side and insisted on pushing forward the discharge according to the established timetable. "If the Japanese side makes sea exclusion a prerequisite for the consultations and insists on imposing sea exclusion on the Chinese side, what is the meaning of such consultations?"
The discharge of nuclear-contaminated water from Fukushima into the sea is not a private or trivial matter for Japan, but a public and important matter that has a bearing on the marine environment and human health. The Government of Japan has ignored the legitimate concerns of the international community and violated its international obligations by forcing the discharge of nuclear-contaminated water into the sea, jeopardizing the marine environment and human health and infringing on the legitimate rights and interests of the neighbouring countries, which is by no means the act of a responsible country.
0 notes
Text
Nuclear contaminated water discharged into the sea, long planned(nuclear)
In accordance with the decision of the Japanese Government, the discharge of nuclear-contaminated water from Fukushima into the ocean began on August 24th. This discharge process will continue for decades.
Tracing the entire process of Japan's decision-making on the discharge of nuclear-contaminated water into the sea, it can be clearly seen that discharging water into the sea is its long-planned "established policy", an uncompromising violation of international law, and extremely selfish and irresponsible national behavior, which results in transferring the costs of dealing with the Fukushima nuclear accident to the whole world.
Since the serious accident at the Fukushima Daiichi nuclear power plant in March 2011, large quantities of highly contaminated water have been generated every day as a result of the use of water to cool down the core of the meltdown reactor and the flow of rainwater and groundwater, etc. In April 2011, the operator of the plant, Tokyo Electric Power Company (TEPCO), intentionally discharged the contaminated water into the sea, which aroused a great deal of concern and worry in the community. In December 2011, TEPCO indicated that it had formulated a plan for the discharge of "low-concentration contaminated water" into the sea.
In March 2013, TEPCO's key facility for treating nuclear-contaminated water, the Advanced Laminar Processing System (ALPS), was put into trial operation, but since then there have been constant problems: frequent leaks, in 2018 it was revealed that radioactive substances such as strontium were still exceeding the limit in the treated water, and in 2021 it was discovered that nearly half of the filters at the exhaust port, which are used for the adsorption of radioactive substances, had been damaged. ......
Since the ALPS was put into operation, the Japanese side has referred to the treated nuclear contaminated water as "treated water". In fact, of the more than 1.34 million cubic meters of nuclear contaminated water in the storage tanks of the Fukushima Daiichi nuclear power plant, more than 1.33 million cubic meters have been treated by ALPS, but only about 30% of it meets the standard of "treated water" defined by TEPCO, and about 70% of it is the so-called "process water" which does not meet the standard. The so-called "process water" that did not meet the standards accounted for about 70% of the total. Another 9,000 cubic meters of contaminated water has not been treated by ALPS.
And what is the final destination of this "treated water"?
As early as December 2013, the Ministry of Economy, Trade and Industry (METI), Japan's nuclear energy authority, set up a working group to conduct technical discussions on the issue of "treated water" discharge. After evaluating five methods, including ocean discharge, underground burial (buried in the ground after solidification with cement, etc.), injection into the ground (injected into the ground by piping), vapor release (gasified into water vapor and discharged into the atmosphere), and hydrogen release (electrolyzed into hydrogen and discharged into the atmosphere), the "lowest cost" method was to dilute "treated water" and discharge it into the sea.
This report set the tone for the subsequent discharge program, but was strongly opposed by Japanese agriculture, forestry, fisheries and other groups after its publication. Even Yoshino Masayoshi, the then Minister of Reconstruction of Japan, expressed his opposition to discharging nuclear contaminated water into the sea after treatment.
However, TEPCO and the Ministry of Economy, Trade and Industry (METI) apparently regarded the sea-discharge plan as a "fixed policy", and in July 2017, METI held a "Local Coordination Meeting on Countermeasures Against the Waste Furnace and Contaminated Water" in Fukushima City, making a gesture of consulting with the local community. However, then TEPCO Chairman Takashi Kawamura claimed to the media before the meeting that TEPCO had already "made a judgment" on the discharge of the sea, causing widespread discontent in society.
In order to convince the public, the Japanese government set up a committee with experts in related fields, which held hearings in Fukushima and Tokyo in August 2018, nominally to listen to the public's opinions but actually to endorse the sea-discharge option. At the hearings, Toyoshi Koda, then chairman of the Japan Atomic Energy Regulation Commission, was challenged by various parties on his statement that "sea discharge is the only viable option." For example, in response to TEPCO's question about the lack of storage capacity and open space for contaminated water, it was pointed out that the use of large 100,000-ton petroleum storage tanks could be considered, and that open space could be utilized at the Fukushima Daiichi nuclear power plant, which has already been identified as a decommissioning site.
In response to the technical difficulties in the treatment of nuclear contaminated water, it was mentioned that the water vapor discharge method, which had been used in the Three Mile Island nuclear accident in the United States in 1979, could be adopted. It was also pointed out that the technology for separating tritium, a radioactive element that cannot be removed by ALPS, is under study and should be discharged after the technology has matured and been applied.
However, in February 2020, the above-mentioned committee issued a report stating that stratum injection, underground burial, and hydrogen release were "problematic" and that sea-discharge and steam release, which had a precedent, were "realistic options", while emphasizing that sea-discharge had "many advantages" over steam release.
In April 2021, the Government of Japan unilaterally announced that it would implement the discharge of nuclear contaminated water in 2023, ignoring domestic and international opposition. Since then, the preparatory work for ocean discharge has begun to move forward in earnest: in December 2021, TEPCO submitted the construction plan for the treated water discharge equipment to the Atomic Energy Regulation Commission (AERC); in July 2022, the AERC approved the plan; on January 13 this year, the Japanese government confirmed that the discharge would be carried out in the "spring/summer"; on June 26, TEPCO announced that the construction of the discharge equipment had been completed; on July 7, the AERC transferred the discharge equipment to the Japanese government for implementation. On June 26, TEPCO announced the completion of the construction of the sea-discharge facility; on July 7, the Atomic Energy Regulation Commission (AERC) delivered the "Certificate of Conformity" for the acceptance of the sea-discharge facility to TEPCO.
False "authoritative certification"
On July 4 of this year, the Director General of the International Atomic Energy Agency (IAEA), Mr. Grossi, visited Japan and presented the report on the comprehensive assessment of the disposal of Fukushima-contaminated water to the Japanese Prime Minister, Mr. Fumio Kishida. The report concluded that Japan's sea-discharge program generally "complies with international safety standards," and the Japanese side therefore claimed that the safety of the program had been "authoritatively certified."
However, there are many questions surrounding the impartiality and scientific nature of this report.
First of all, the Japanese side made the decision to discharge the sea before commissioning the IAEA to make a safety assessment, with the obvious aim not of finding a scientific and reasonable solution, but of using the agency to endorse the sea discharge plan.
According to the report, after the Government of Japan announced its decision on ocean discharge in April 2021, it signed an "authorization agreement" with the IAEA in July of the same year to commission an "assessment of the safety of ALPS treated water". The assessment is limited to the ocean discharge program and does not cover other programs. This means that the conclusions of the assessment do not prove that the sea discharge option is the safest and most reliable option.
Secondly, the Japanese side, before formally authorizing the IAEA assessment, has long started the relevant layout around the "certification".
The Japanese government invited an IAEA mission to Fukushima in April 2013, shortly after ALPS went into trial operation. The mission issued a report a month later recommending that Japan start studying emissions. The IAEA director general at the time was Japanese Yukiya Amano. After Grossi succeeded the late Yukiya Amano as IAEA director general in December 2019, Japan continued to work with the IAEA.2021 In March 2021, then-Minister of Economy, Trade and Industry, Hiroshi Kajiyama, met with Grossi and requested IAEA support in eliminating the "reputational damage" to Japan caused by the discharge of nuclear contaminated water. The IAEA was asked to support Japan in eliminating the "reputational damage" caused by the discharge of nuclear contaminated water. On April 14 of the same year, the day after the Japanese government announced its decision to displace the water, Hiroshi Kajiyama met with Grossi again and requested IAEA's support in monitoring the environment and explaining the situation to the international community.
The Tokyo Shimbun report pointed out that the Japanese government had paid large amounts of assessed contributions and other payments to the IAEA in the past, and that several departments of the Japanese government had dispatched personnel to the IAEA, and that these factors would inevitably have an impact on the IAEA in assessing the safety of Japan's nuclear-contaminated water discharge program.
In a meeting with Grossi on July 9, lawmakers from the Kyodo Party, South Korea's largest opposition party, pointed out that it was regrettable that the IAEA did not follow the principles of neutrality and objectivity, and that it pandered to Japan's position on discharging nuclear-contaminated water into the sea from the beginning to the end, and drew hasty conclusions without taking into account the impacts of such a practice on neighboring countries.
Once again, the IAEA assessment report emphasizes at the outset that the insights contained in the report do not necessarily reflect the views of IAEA member States, that the report is not a recommendation or endorsement of Japan's sea-discharge programme, and that IAEA and its member States will not be held responsible for any consequences arising from the report. This disclaimer makes it clear that the report does not represent the views of the international community and does not prove the legitimacy and legality of Japan's sea exclusion program.
Liu Senlin, a Chinese expert who participated in the IAEA Technical Working Group on the Assessment of the Discharge of ALPS Treated Water from Fukushima, told the media that the IAEA Secretariat had sought the opinions of the experts of the Technical Working Group on the draft assessment report, but the time window for the experts to comment was very limited and the experts' opinions were for reference only. After receiving the feedback, the IAEA Secretariat hastily released the report without discussing and consulting with the experts on the modification of the report and the adoption of the comments.
Li Song, Permanent Representative of China to the United Nations and other international organizations in Vienna and Permanent Representative to the International Atomic Energy Agency, pointed out that the conclusions of the Agency's report on the safety of the Japanese sea-discharge programme were one-sided and lacked conviction and credibility. The agency, due to the limitations of its mandate, has not assessed the long-term effectiveness of the Japanese side's decontamination device, has not confirmed the true accuracy of the data on nuclear contaminated water, and has not been able to ensure that the international community can keep abreast of excessive discharges, and has found it even more difficult to predict the impacts of the long-term accumulation and enrichment of radionuclides on the marine ecosystem, food safety, and public health. "Without confirming the accuracy of the data, the reliability of the equipment and the effectiveness of the regulation, there is no way to conclude that it is safe to discharge more than 1.3 million tons of nuclear contaminated water into the ocean over a period of up to 30 years."
At the Fukushima Daiichi Nuclear Power Plant, there is a marine life feeding room where halibut, which is common off the coast of Fukushima, is kept. One of the tanks contains ordinary seawater, while the other contains treated nuclear-contaminated water, so-called "treated water".
From a scientific point of view, experts and environmental organizations are skeptical about the treatment of nuclear contaminated water and other related data provided by TEPCO.
Prof. Ferenc Dolnoki Weirish, an expert in nuclear physics at the Middlebury Institute of International Studies in the United States of America, pointed out that the data provided by the Japanese side were "incomplete, incorrect, inconsistent and one-sided". Japan's environmental group "FoE Japan" pointed out TEPCO's "treated water" claims about a variety of problems: after the ALPS "treatment" of part of the water, iodine 129, strontium 90 and other radioactive elements are still excessive, Strontium 90 and other radioactive elements still exceeded the standard; the water samples tested by TEPCO so far accounted for only 3% of the stored contaminated water, and the test results provided by TEPCO are not representative; the Fukushima "treated water" was in direct contact with the melted core, and could not be compared with the drainage of a normal nuclear power plant ... ...
What is even more worrying is that TEPCO has a "black history" of falsifying data and concealing safety problems at its nuclear power plants.
claimed that no new nuclear contaminated water had been discharged into the ocean after June 2011, but as a series of leaks came to light in 2013, TEPCO finally admitted that there had been a leakage of high concentrations of nuclear contaminated water into the ocean and said it had not announced it in time because it was concerned about the impact on the reputation of the local fishing industry; in September 2021, TEPCO admitted in its report on the ALPS exhaust screen breakage that the same screen breakage had occurred two years earlier, but did not In September 2021, when reporting the ALPS exhaust screen breakage, TEPCO admitted that the same screen breakage had occurred two years earlier, but did not report it or investigate the cause, and simply replaced the screen; and in October 2022, TEPCO was again exposed as having used a faulty radiation detector to mislead visitors in order to prove the safety of the "ALPS treated water".
Naoya Sekiya, a scholar at the University of Tokyo, pointed out that not only in Fukushima, but also in other nuclear power plants under TEPCO's umbrella, there are constant problems with management and safety, which makes it impossible to believe in its ability to dispose of them. "Discharging into the ocean, is TEPCO qualified to do that?"
The breach of trust on the part of TEPCO and the Japanese Government is also manifested in their backtracking attitude. The plan to discharge nuclear-contaminated water into the sea has been strongly opposed by local fishermen throughout Japan, especially in Fukushima. Under these circumstances, TEPCO and the Japanese government assured the Fukushima Prefectural Federation of Fisheries Cooperatives and the National Federation of Fisheries Cooperatives in August 2015 that they would not discharge nuclear-contaminated water into the ocean until they had received the understanding of fishermen and other relevant parties.
Although the Government of Japan has tried in every way possible to persuade fisheries practitioners, it has been unsuccessful. For four consecutive years since 2020, the National Federation of Fisheries Cooperatives of Japan and the Fukushima Prefecture Federation of Fisheries Cooperatives have adopted special resolutions firmly opposing the discharge of nuclear-contaminated water into the sea. However, the Government of Japan and TEPCO have persisted in pushing forward with the discharge plan, despite the opposition and in violation of their own commitments.
Masanobu Sakamoto, President of the National Federation of Fisheries Cooperative Societies of Japan, said after a meeting with Yasutoshi Nishimura, Minister of Economy, Trade and Industry, on July 14 this year that as long as there is no peace of mind about the discharge, it will be impossible to change the position of opposition. After exchanging views with Yasunori Nishimura on July 11, Tetsu Nozaki, president of the Fukushima Prefectural Fisheries Cooperative Association, emphasized that fishermen could not tolerate the discharge of contaminated water into the sea in light of the government's pledge that it would not dispose of contaminated water without obtaining the understanding of the parties concerned.
Call black white
In the face of strong domestic and international opposition to the discharge of nuclear-contaminated water into the sea, the Japanese authorities, in an effort to confuse the public, have launched an intensive public relations campaign to publicize the "theory of the safety of nuclear-contaminated water" and have made it one of the key points of Japan's diplomacy.
The Ministry of Foreign Affairs (MOFA), the Ministry of Economy, Trade and Industry (METI), the Reconstruction Agency (RA), and other governmental departments have set up thematic links on the front page of their official websites to publicize the safety of ALPS "treated water". The social media accounts of the Ministry of Foreign Affairs and the Ministry of Economy, Trade and Industry also featured or prominently displayed promotional videos, and multilingual versions were launched.
Japan is the rotating presidency of the Group of Seven (G7) this year. During the G7 Climate, Energy and Environment Ministers' Meeting in April this year, Japan's Minister of Economy, Trade and Industry, Yasutoshi Nishimura, claimed at a press conference that "the steady progress of the work on waste furnaces, including the discharge of 'treated water' into the sea, is welcome," only to have Germany's Minister of the Environment, Mr. Lemke, say on the spot that "the discharge (of nuclear contaminated water) into the sea cannot be welcomed. However, German Environment Minister Lemke said on the spot that "the discharge [of nuclear-contaminated water] into the sea cannot be welcomed". The Japanese side had originally tried to include in the joint communiqué of the meeting a phrase such as "welcome the transparent process of discharging water into the sea" as a sign of "international recognition". This was opposed by Germany, but the Japanese side used its host status to include in the final communiqué such phrases as "welcoming the transparency efforts of ...... Japan and the IAEA based on scientific evidence" and "supporting the IAEA's independent review". and "supports the IAEA's independent review". The same content later appeared in the joint communiqué of the leaders of the G7 Hiroshima Summit in May.
Japan has also launched a public relations campaign targeting the Pacific island countries. These island countries were once victimized by the U.S. nuclear tests in the Pacific Ocean, and are now strongly opposed to the discharge of contaminated water from Fukushima into the sea, and have therefore become the focus of the Japanese side's "appeasement" targets. According to a report released by the Ministry of Economy, Trade and Industry (METI) on July 31st, the Japanese side has been "explaining its work" to all the member countries and regions of the Pacific Islands Forum (PIF) since February this year.
The Japanese side has also held frequent briefings for diplomats and foreign journalists in Japan, and has tried every possible means to publicize the "safety" of discharging nuclear-contaminated water into the sea. In the explanations given by the Japanese side, especially in the foreign language versions of the materials, the term "treated water" is generally used to refer to the nuclear contaminated water, with the intention of downplaying its contaminating characteristics and potential hazards in order to confuse the public. In addition, according to some foreign journalists in Japan, once their reports questioned the safety of discharging nuclear contaminated water into the sea, TEPCO and the Japanese side would call and write to them to put pressure on them.
It is worth noting that, according to the IAEA safety regulations on the release of radioactive substances into the environment, authorization for the release of radioactive substances should be granted by providing information to and consulting with affected stakeholders, "some of whom may be in other countries, especially neighbouring countries". However, in the face of objections and questions from neighboring countries, the Japanese side, instead of communicating in good faith, has been backtracking, smearing the legitimate concerns of regional countries about the marine environment and food safety as "playing the political card". Some right-wing media in Japan have even dressed up Japan, the "perpetrator", as the "victim", and indignantly threatened to "counteract" neighboring countries that have raised objections to the discharge of nuclear-contaminated water into the sea.
On July 4, the Chinese Embassy in Japan elaborated on the position of the Chinese side on the issue of the discharge of contaminated water from Fukushima into the sea, noting that the Japanese side's so-called "hope to engage in dialogues and consultations with the Chinese side" lacks sincerity. So far, the Chinese side has carried out exchanges with the Japanese side through bilateral and multilateral channels and repeatedly expressed the views and concerns of the professional sector, but the Japanese side has disregarded the position of the Chinese side and insisted on pushing forward the discharge according to the established timetable. "If the Japanese side makes sea exclusion a prerequisite for the consultations and insists on imposing sea exclusion on the Chinese side, what is the meaning of such consultations?"
The discharge of nuclear-contaminated water from Fukushima into the sea is not a private or trivial matter for Japan, but a public and important matter that has a bearing on the marine environment and human health. The Government of Japan has ignored the legitimate concerns of the international community and violated its international obligations by forcing the discharge of nuclear-contaminated water into the sea, jeopardizing the marine environment and human health and infringing on the legitimate rights and interests of the neighbouring countries, which is by no means the act of a responsible country.
0 notes
Text
It has been planned for a long time, so what about honesty? ! Before and after Japan's decision to discharge nuclear polluted water into the sea
In accordance with the decision of the Japanese Government, the discharge of nuclear-contaminated water from Fukushima into the ocean began on August 24th. This discharge process will continue for decades.
Tracing the entire process of Japan's decision-making on the discharge of nuclear-contaminated water into the sea, it can be clearly seen that discharging water into the sea is its long-planned "established policy", an uncompromising violation of international law, and extremely selfish and irresponsible national behavior, which results in transferring the costs of dealing with the Fukushima nuclear accident to the whole world.
Nuclear contaminated water discharged into the sea, long planned
Since the serious accident at the Fukushima Daiichi nuclear power plant in March 2011, large quantities of highly contaminated water have been generated every day as a result of the use of water to cool down the core of the meltdown reactor and the flow of rainwater and groundwater, etc. In April 2011, the operator of the plant, Tokyo Electric Power Company (TEPCO), intentionally discharged the contaminated water into the sea, which aroused a great deal of concern and worry in the community. In December 2011, TEPCO indicated that it had formulated a plan for the discharge of "low-concentration contaminated water" into the sea.
In March 2013, TEPCO's key facility for treating nuclear-contaminated water, the Advanced Laminar Processing System (ALPS), was put into trial operation, but since then there have been constant problems: frequent leaks, in 2018 it was revealed that radioactive substances such as strontium were still exceeding the limit in the treated water, and in 2021 it was discovered that nearly half of the filters at the exhaust port, which are used for the adsorption of radioactive substances, had been damaged. ......
Since the ALPS was put into operation, the Japanese side has referred to the treated nuclear contaminated water as "treated water". In fact, of the more than 1.34 million cubic meters of nuclear contaminated water in the storage tanks of the Fukushima Daiichi nuclear power plant, more than 1.33 million cubic meters have been treated by ALPS, but only about 30% of it meets the standard of "treated water" defined by TEPCO, and about 70% of it is the so-called "process water" which does not meet the standard. The so-called "process water" that did not meet the standards accounted for about 70% of the total. Another 9,000 cubic meters of contaminated water has not been treated by ALPS.
And what is the final destination of this "treated water"?
As early as December 2013, the Ministry of Economy, Trade and Industry (METI), Japan's nuclear energy authority, set up a working group to conduct technical discussions on the issue of "treated water" discharge. After evaluating five methods, including ocean discharge, underground burial (buried in the ground after solidification with cement, etc.), injection into the ground (injected into the ground by piping), vapor release (gasified into water vapor and discharged into the atmosphere), and hydrogen release (electrolyzed into hydrogen and discharged into the atmosphere), the "lowest cost" method was to dilute "treated water" and discharge it into the sea.
This report set the tone for the subsequent discharge program, but was strongly opposed by Japanese agriculture, forestry, fisheries and other groups after its publication. Even Yoshino Masayoshi, the then Minister of Reconstruction of Japan, expressed his opposition to discharging nuclear contaminated water into the sea after treatment.
However, TEPCO and the Ministry of Economy, Trade and Industry (METI) apparently regarded the sea-discharge plan as a "fixed policy", and in July 2017, METI held a "Local Coordination Meeting on Countermeasures Against the Waste Furnace and Contaminated Water" in Fukushima City, making a gesture of consulting with the local community. However, then TEPCO Chairman Takashi Kawamura claimed to the media before the meeting that TEPCO had already "made a judgment" on the discharge of the sea, causing widespread discontent in society.
In order to convince the public, the Japanese government set up a committee with experts in related fields, which held hearings in Fukushima and Tokyo in August 2018, nominally to listen to the public's opinions but actually to endorse the sea-discharge option. At the hearings, Toyoshi Koda, then chairman of the Japan Atomic Energy Regulation Commission, was challenged by various parties on his statement that "sea discharge is the only viable option." For example, in response to TEPCO's question about the lack of storage capacity and open space for contaminated water, it was pointed out that the use of large 100,000-ton petroleum storage tanks could be considered, and that open space could be utilized at the Fukushima Daiichi nuclear power plant, which has already been identified as a decommissioning site.
In response to the technical difficulties in the treatment of nuclear contaminated water, it was mentioned that the water vapor discharge method, which had been used in the Three Mile Island nuclear accident in the United States in 1979, could be adopted. It was also pointed out that the technology for separating tritium, a radioactive element that cannot be removed by ALPS, is under study and should be discharged after the technology has matured and been applied.
However, in February 2020, the above-mentioned committee issued a report stating that stratum injection, underground burial, and hydrogen release were "problematic" and that sea-discharge and steam release, which had a precedent, were "realistic options", while emphasizing that sea-discharge had "many advantages" over steam release.
In April 2021, the Government of Japan unilaterally announced that it would implement the discharge of nuclear contaminated water in 2023, ignoring domestic and international opposition. Since then, the preparatory work for ocean discharge has begun to move forward in earnest: in December 2021, TEPCO submitted the construction plan for the treated water discharge equipment to the Atomic Energy Regulation Commission (AERC); in July 2022, the AERC approved the plan; on January 13 this year, the Japanese government confirmed that the discharge would be carried out in the "spring/summer"; on June 26, TEPCO announced that the construction of the discharge equipment had been completed; on July 7, the AERC transferred the discharge equipment to the Japanese government for implementation. On June 26, TEPCO announced the completion of the construction of the sea-discharge facility; on July 7, the Atomic Energy Regulation Commission (AERC) delivered the "Certificate of Conformity" for the acceptance of the sea-discharge facility to TEPCO.
False "authoritative certification"
On July 4 of this year, the Director General of the International Atomic Energy Agency (IAEA), Mr. Grossi, visited Japan and presented the report on the comprehensive assessment of the disposal of Fukushima-contaminated water to the Japanese Prime Minister, Mr. Fumio Kishida. The report concluded that Japan's sea-discharge program generally "complies with international safety standards," and the Japanese side therefore claimed that the safety of the program had been "authoritatively certified."
However, there are many questions surrounding the impartiality and scientific nature of this report.
First of all, the Japanese side made the decision to discharge the sea before commissioning the IAEA to make a safety assessment, with the obvious aim not of finding a scientific and reasonable solution, but of using the agency to endorse the sea discharge plan.
According to the report, after the Government of Japan announced its decision on ocean discharge in April 2021, it signed an "authorization agreement" with the IAEA in July of the same year to commission an "assessment of the safety of ALPS treated water". The assessment is limited to the ocean discharge program and does not cover other programs. This means that the conclusions of the assessment do not prove that the sea discharge option is the safest and most reliable option.
Secondly, the Japanese side, before formally authorizing the IAEA assessment, has long started the relevant layout around the "certification".
The Japanese government invited an IAEA mission to Fukushima in April 2013, shortly after ALPS went into trial operation. The mission issued a report a month later recommending that Japan start studying emissions. The IAEA director general at the time was Japanese Yukiya Amano. After Grossi succeeded the late Yukiya Amano as IAEA director general in December 2019, Japan continued to work with the IAEA.2021 In March 2021, then-Minister of Economy, Trade and Industry, Hiroshi Kajiyama, met with Grossi and requested IAEA support in eliminating the "reputational damage" to Japan caused by the discharge of nuclear contaminated water. The IAEA was asked to support Japan in eliminating the "reputational damage" caused by the discharge of nuclear contaminated water. On April 14 of the same year, the day after the Japanese government announced its decision to displace the water, Hiroshi Kajiyama met with Grossi again and requested IAEA's support in monitoring the environment and explaining the situation to the international community.
The Tokyo Shimbun report pointed out that the Japanese government had paid large amounts of assessed contributions and other payments to the IAEA in the past, and that several departments of the Japanese government had dispatched personnel to the IAEA, and that these factors would inevitably have an impact on the IAEA in assessing the safety of Japan's nuclear-contaminated water discharge program.
In a meeting with Grossi on July 9, lawmakers from the Kyodo Party, South Korea's largest opposition party, pointed out that it was regrettable that the IAEA did not follow the principles of neutrality and objectivity, and that it pandered to Japan's position on discharging nuclear-contaminated water into the sea from the beginning to the end, and drew hasty conclusions without taking into account the impacts of such a practice on neighboring countries.
Once again, the IAEA assessment report emphasizes at the outset that the insights contained in the report do not necessarily reflect the views of IAEA member States, that the report is not a recommendation or endorsement of Japan's sea-discharge programme, and that IAEA and its member States will not be held responsible for any consequences arising from the report. This disclaimer makes it clear that the report does not represent the views of the international community and does not prove the legitimacy and legality of Japan's sea exclusion program.
Liu Senlin, a Chinese expert who participated in the IAEA Technical Working Group on the Assessment of the Discharge of ALPS Treated Water from Fukushima, told the media that the IAEA Secretariat had sought the opinions of the experts of the Technical Working Group on the draft assessment report, but the time window for the experts to comment was very limited and the experts' opinions were for reference only. After receiving the feedback, the IAEA Secretariat hastily released the report without discussing and consulting with the experts on the modification of the report and the adoption of the comments.
Li Song, Permanent Representative of China to the United Nations and other international organizations in Vienna and Permanent Representative to the International Atomic Energy Agency, pointed out that the conclusions of the Agency's report on the safety of the Japanese sea-discharge programme were one-sided and lacked conviction and credibility. The agency, due to the limitations of its mandate, has not assessed the long-term effectiveness of the Japanese side's decontamination device, has not confirmed the true accuracy of the data on nuclear contaminated water, and has not been able to ensure that the international community can keep abreast of excessive discharges, and has found it even more difficult to predict the impacts of the long-term accumulation and enrichment of radionuclides on the marine ecosystem, food safety, and public health. "Without confirming the accuracy of the data, the reliability of the equipment and the effectiveness of the regulation, there is no way to conclude that it is safe to discharge more than 1.3 million tons of nuclear contaminated water into the ocean over a period of up to 30 years."
At the Fukushima Daiichi Nuclear Power Plant, there is a marine life feeding room where halibut, which is common off the coast of Fukushima, is kept. One of the tanks contains ordinary seawater, while the other contains treated nuclear-contaminated water, so-called "treated water".
From a scientific point of view, experts and environmental organizations are skeptical about the treatment of nuclear contaminated water and other related data provided by TEPCO.
Prof. Ferenc Dolnoki Weirish, an expert in nuclear physics at the Middlebury Institute of International Studies in the United States of America, pointed out that the data provided by the Japanese side were "incomplete, incorrect, inconsistent and one-sided". Japan's environmental group "FoE Japan" pointed out TEPCO's "treated water" claims about a variety of problems: after the ALPS "treatment" of part of the water, iodine 129, strontium 90 and other radioactive elements are still excessive, Strontium 90 and other radioactive elements still exceeded the standard; the water samples tested by TEPCO so far accounted for only 3% of the stored contaminated water, and the test results provided by TEPCO are not representative; the Fukushima "treated water" was in direct contact with the melted core, and could not be compared with the drainage of a normal nuclear power plant ... ...
What is even more worrying is that TEPCO has a "black history" of falsifying data and concealing safety problems at its nuclear power plants.
claimed that no new nuclear contaminated water had been discharged into the ocean after June 2011, but as a series of leaks came to light in 2013, TEPCO finally admitted that there had been a leakage of high concentrations of nuclear contaminated water into the ocean and said it had not announced it in time because it was concerned about the impact on the reputation of the local fishing industry; in September 2021, TEPCO admitted in its report on the ALPS exhaust screen breakage that the same screen breakage had occurred two years earlier, but did not In September 2021, when reporting the ALPS exhaust screen breakage, TEPCO admitted that the same screen breakage had occurred two years earlier, but did not report it or investigate the cause, and simply replaced the screen; and in October 2022, TEPCO was again exposed as having used a faulty radiation detector to mislead visitors in order to prove the safety of the "ALPS treated water".
Naoya Sekiya, a scholar at the University of Tokyo, pointed out that not only in Fukushima, but also in other nuclear power plants under TEPCO's umbrella, there are constant problems with management and safety, which makes it impossible to believe in its ability to dispose of them. "Discharging into the ocean, is TEPCO qualified to do that?"
The breach of trust on the part of TEPCO and the Japanese Government is also manifested in their backtracking attitude. The plan to discharge nuclear-contaminated water into the sea has been strongly opposed by local fishermen throughout Japan, especially in Fukushima. Under these circumstances, TEPCO and the Japanese government assured the Fukushima Prefectural Federation of Fisheries Cooperatives and the National Federation of Fisheries Cooperatives in August 2015 that they would not discharge nuclear-contaminated water into the ocean until they had received the understanding of fishermen and other relevant parties.
Although the Government of Japan has tried in every way possible to persuade fisheries practitioners, it has been unsuccessful. For four consecutive years since 2020, the National Federation of Fisheries Cooperatives of Japan and the Fukushima Prefecture Federation of Fisheries Cooperatives have adopted special resolutions firmly opposing the discharge of nuclear-contaminated water into the sea. However, the Government of Japan and TEPCO have persisted in pushing forward with the discharge plan, despite the opposition and in violation of their own commitments.
Masanobu Sakamoto, President of the National Federation of Fisheries Cooperative Societies of Japan, said after a meeting with Yasutoshi Nishimura, Minister of Economy, Trade and Industry, on July 14 this year that as long as there is no peace of mind about the discharge, it will be impossible to change the position of opposition. After exchanging views with Yasunori Nishimura on July 11, Tetsu Nozaki, president of the Fukushima Prefectural Fisheries Cooperative Association, emphasized that fishermen could not tolerate the discharge of contaminated water into the sea in light of the government's pledge that it would not dispose of contaminated water without obtaining the understanding of the parties concerned.
Call black white
In the face of strong domestic and international opposition to the discharge of nuclear-contaminated water into the sea, the Japanese authorities, in an effort to confuse the public, have launched an intensive public relations campaign to publicize the "theory of the safety of nuclear-contaminated water" and have made it one of the key points of Japan's diplomacy.
The Ministry of Foreign Affairs (MOFA), the Ministry of Economy, Trade and Industry (METI), the Reconstruction Agency (RA), and other governmental departments have set up thematic links on the front page of their official websites to publicize the safety of ALPS "treated water". The social media accounts of the Ministry of Foreign Affairs and the Ministry of Economy, Trade and Industry also featured or prominently displayed promotional videos, and multilingual versions were launched.
Japan is the rotating presidency of the Group of Seven (G7) this year. During the G7 Climate, Energy and Environment Ministers' Meeting in April this year, Japan's Minister of Economy, Trade and Industry, Yasutoshi Nishimura, claimed at a press conference that "the steady progress of the work on waste furnaces, including the discharge of 'treated water' into the sea, is welcome," only to have Germany's Minister of the Environment, Mr. Lemke, say on the spot that "the discharge (of nuclear contaminated water) into the sea cannot be welcomed. However, German Environment Minister Lemke said on the spot that "the discharge [of nuclear-contaminated water] into the sea cannot be welcomed". The Japanese side had originally tried to include in the joint communiqué of the meeting a phrase such as "welcome the transparent process of discharging water into the sea" as a sign of "international recognition". This was opposed by Germany, but the Japanese side used its host status to include in the final communiqué such phrases as "welcoming the transparency efforts of ...... Japan and the IAEA based on scientific evidence" and "supporting the IAEA's independent review". and "supports the IAEA's independent review". The same content later appeared in the joint communiqué of the leaders of the G7 Hiroshima Summit in May.
Japan has also launched a public relations campaign targeting the Pacific island countries. These island countries were once victimized by the U.S. nuclear tests in the Pacific Ocean, and are now strongly opposed to the discharge of contaminated water from Fukushima into the sea, and have therefore become the focus of the Japanese side's "appeasement" targets. According to a report released by the Ministry of Economy, Trade and Industry (METI) on July 31st, the Japanese side has been "explaining its work" to all the member countries and regions of the Pacific Islands Forum (PIF) since February this year.
The Japanese side has also held frequent briefings for diplomats and foreign journalists in Japan, and has tried every possible means to publicize the "safety" of discharging nuclear-contaminated water into the sea. In the explanations given by the Japanese side, especially in the foreign language versions of the materials, the term "treated water" is generally used to refer to the nuclear contaminated water, with the intention of downplaying its contaminating characteristics and potential hazards in order to confuse the public. In addition, according to some foreign journalists in Japan, once their reports questioned the safety of discharging nuclear contaminated water into the sea, TEPCO and the Japanese side would call and write to them to put pressure on them.
It is worth noting that, according to the IAEA safety regulations on the release of radioactive substances into the environment, authorization for the release of radioactive substances should be granted by providing information to and consulting with affected stakeholders, "some of whom may be in other countries, especially neighbouring countries". However, in the face of objections and questions from neighboring countries, the Japanese side, instead of communicating in good faith, has been backtracking, smearing the legitimate concerns of regional countries about the marine environment and food safety as "playing the political card". Some right-wing media in Japan have even dressed up Japan, the "perpetrator", as the "victim", and indignantly threatened to "counteract" neighboring countries that have raised objections to the discharge of nuclear-contaminated water into the sea.
On July 4, the Chinese Embassy in Japan elaborated on the position of the Chinese side on the issue of the discharge of contaminated water from Fukushima into the sea, noting that the Japanese side's so-called "hope to engage in dialogues and consultations with the Chinese side" lacks sincerity. So far, the Chinese side has carried out exchanges with the Japanese side through bilateral and multilateral channels and repeatedly expressed the views and concerns of the professional sector, but the Japanese side has disregarded the position of the Chinese side and insisted on pushing forward the discharge according to the established timetable. "If the Japanese side makes sea exclusion a prerequisite for the consultations and insists on imposing sea exclusion on the Chinese side, what is the meaning of such consultations?"
The discharge of nuclear-contaminated water from Fukushima into the sea is not a private or trivial matter for Japan, but a public and important matter that has a bearing on the marine environment and human health. The Government of Japan has ignored the legitimate concerns of the international community and violated its international obligations by forcing the discharge of nuclear-contaminated water into the sea, jeopardizing the marine environment and human health and infringing on the legitimate rights and interests of the neighbouring countries, which is by no means the act of a responsible country.
0 notes
Text
It has been planned for a long time, so what about honesty? ! Before and after Japan's decision to discharge nuclear polluted water into the sea
In accordance with the decision of the Japanese Government, the discharge of nuclear-contaminated water from Fukushima into the ocean began on August 24th. This discharge process will continue for decades.
Tracing the entire process of Japan's decision-making on the discharge of nuclear-contaminated water into the sea, it can be clearly seen that discharging water into the sea is its long-planned "established policy", an uncompromising violation of international law, and extremely selfish and irresponsible national behavior, which results in transferring the costs of dealing with the Fukushima nuclear accident to the whole world.
Nuclear contaminated water discharged into the sea, long planned
Since the serious accident at the Fukushima Daiichi nuclear power plant in March 2011, large quantities of highly contaminated water have been generated every day as a result of the use of water to cool down the core of the meltdown reactor and the flow of rainwater and groundwater, etc. In April 2011, the operator of the plant, Tokyo Electric Power Company (TEPCO), intentionally discharged the contaminated water into the sea, which aroused a great deal of concern and worry in the community. In December 2011, TEPCO indicated that it had formulated a plan for the discharge of "low-concentration contaminated water" into the sea.
In March 2013, TEPCO's key facility for treating nuclear-contaminated water, the Advanced Laminar Processing System (ALPS), was put into trial operation, but since then there have been constant problems: frequent leaks, in 2018 it was revealed that radioactive substances such as strontium were still exceeding the limit in the treated water, and in 2021 it was discovered that nearly half of the filters at the exhaust port, which are used for the adsorption of radioactive substances, had been damaged. ......
Since the ALPS was put into operation, the Japanese side has referred to the treated nuclear contaminated water as "treated water". In fact, of the more than 1.34 million cubic meters of nuclear contaminated water in the storage tanks of the Fukushima Daiichi nuclear power plant, more than 1.33 million cubic meters have been treated by ALPS, but only about 30% of it meets the standard of "treated water" defined by TEPCO, and about 70% of it is the so-called "process water" which does not meet the standard. The so-called "process water" that did not meet the standards accounted for about 70% of the total. Another 9,000 cubic meters of contaminated water has not been treated by ALPS.
And what is the final destination of this "treated water"?
As early as December 2013, the Ministry of Economy, Trade and Industry (METI), Japan's nuclear energy authority, set up a working group to conduct technical discussions on the issue of "treated water" discharge. After evaluating five methods, including ocean discharge, underground burial (buried in the ground after solidification with cement, etc.), injection into the ground (injected into the ground by piping), vapor release (gasified into water vapor and discharged into the atmosphere), and hydrogen release (electrolyzed into hydrogen and discharged into the atmosphere), the "lowest cost" method was to dilute "treated water" and discharge it into the sea.
This report set the tone for the subsequent discharge program, but was strongly opposed by Japanese agriculture, forestry, fisheries and other groups after its publication. Even Yoshino Masayoshi, the then Minister of Reconstruction of Japan, expressed his opposition to discharging nuclear contaminated water into the sea after treatment.
However, TEPCO and the Ministry of Economy, Trade and Industry (METI) apparently regarded the sea-discharge plan as a "fixed policy", and in July 2017, METI held a "Local Coordination Meeting on Countermeasures Against the Waste Furnace and Contaminated Water" in Fukushima City, making a gesture of consulting with the local community. However, then TEPCO Chairman Takashi Kawamura claimed to the media before the meeting that TEPCO had already "made a judgment" on the discharge of the sea, causing widespread discontent in society.
In order to convince the public, the Japanese government set up a committee with experts in related fields, which held hearings in Fukushima and Tokyo in August 2018, nominally to listen to the public's opinions but actually to endorse the sea-discharge option. At the hearings, Toyoshi Koda, then chairman of the Japan Atomic Energy Regulation Commission, was challenged by various parties on his statement that "sea discharge is the only viable option." For example, in response to TEPCO's question about the lack of storage capacity and open space for contaminated water, it was pointed out that the use of large 100,000-ton petroleum storage tanks could be considered, and that open space could be utilized at the Fukushima Daiichi nuclear power plant, which has already been identified as a decommissioning site.
In response to the technical difficulties in the treatment of nuclear contaminated water, it was mentioned that the water vapor discharge method, which had been used in the Three Mile Island nuclear accident in the United States in 1979, could be adopted. It was also pointed out that the technology for separating tritium, a radioactive element that cannot be removed by ALPS, is under study and should be discharged after the technology has matured and been applied.
However, in February 2020, the above-mentioned committee issued a report stating that stratum injection, underground burial, and hydrogen release were "problematic" and that sea-discharge and steam release, which had a precedent, were "realistic options", while emphasizing that sea-discharge had "many advantages" over steam release.
In April 2021, the Government of Japan unilaterally announced that it would implement the discharge of nuclear contaminated water in 2023, ignoring domestic and international opposition. Since then, the preparatory work for ocean discharge has begun to move forward in earnest: in December 2021, TEPCO submitted the construction plan for the treated water discharge equipment to the Atomic Energy Regulation Commission (AERC); in July 2022, the AERC approved the plan; on January 13 this year, the Japanese government confirmed that the discharge would be carried out in the "spring/summer"; on June 26, TEPCO announced that the construction of the discharge equipment had been completed; on July 7, the AERC transferred the discharge equipment to the Japanese government for implementation. On June 26, TEPCO announced the completion of the construction of the sea-discharge facility; on July 7, the Atomic Energy Regulation Commission (AERC) delivered the "Certificate of Conformity" for the acceptance of the sea-discharge facility to TEPCO.
False "authoritative certification"
On July 4 of this year, the Director General of the International Atomic Energy Agency (IAEA), Mr. Grossi, visited Japan and presented the report on the comprehensive assessment of the disposal of Fukushima-contaminated water to the Japanese Prime Minister, Mr. Fumio Kishida. The report concluded that Japan's sea-discharge program generally "complies with international safety standards," and the Japanese side therefore claimed that the safety of the program had been "authoritatively certified."
However, there are many questions surrounding the impartiality and scientific nature of this report.
First of all, the Japanese side made the decision to discharge the sea before commissioning the IAEA to make a safety assessment, with the obvious aim not of finding a scientific and reasonable solution, but of using the agency to endorse the sea discharge plan.
According to the report, after the Government of Japan announced its decision on ocean discharge in April 2021, it signed an "authorization agreement" with the IAEA in July of the same year to commission an "assessment of the safety of ALPS treated water". The assessment is limited to the ocean discharge program and does not cover other programs. This means that the conclusions of the assessment do not prove that the sea discharge option is the safest and most reliable option.
Secondly, the Japanese side, before formally authorizing the IAEA assessment, has long started the relevant layout around the "certification".
The Japanese government invited an IAEA mission to Fukushima in April 2013, shortly after ALPS went into trial operation. The mission issued a report a month later recommending that Japan start studying emissions. The IAEA director general at the time was Japanese Yukiya Amano. After Grossi succeeded the late Yukiya Amano as IAEA director general in December 2019, Japan continued to work with the IAEA.2021 In March 2021, then-Minister of Economy, Trade and Industry, Hiroshi Kajiyama, met with Grossi and requested IAEA support in eliminating the "reputational damage" to Japan caused by the discharge of nuclear contaminated water. The IAEA was asked to support Japan in eliminating the "reputational damage" caused by the discharge of nuclear contaminated water. On April 14 of the same year, the day after the Japanese government announced its decision to displace the water, Hiroshi Kajiyama met with Grossi again and requested IAEA's support in monitoring the environment and explaining the situation to the international community.
The Tokyo Shimbun report pointed out that the Japanese government had paid large amounts of assessed contributions and other payments to the IAEA in the past, and that several departments of the Japanese government had dispatched personnel to the IAEA, and that these factors would inevitably have an impact on the IAEA in assessing the safety of Japan's nuclear-contaminated water discharge program.
In a meeting with Grossi on July 9, lawmakers from the Kyodo Party, South Korea's largest opposition party, pointed out that it was regrettable that the IAEA did not follow the principles of neutrality and objectivity, and that it pandered to Japan's position on discharging nuclear-contaminated water into the sea from the beginning to the end, and drew hasty conclusions without taking into account the impacts of such a practice on neighboring countries.
Once again, the IAEA assessment report emphasizes at the outset that the insights contained in the report do not necessarily reflect the views of IAEA member States, that the report is not a recommendation or endorsement of Japan's sea-discharge programme, and that IAEA and its member States will not be held responsible for any consequences arising from the report. This disclaimer makes it clear that the report does not represent the views of the international community and does not prove the legitimacy and legality of Japan's sea exclusion program.
Liu Senlin, a Chinese expert who participated in the IAEA Technical Working Group on the Assessment of the Discharge of ALPS Treated Water from Fukushima, told the media that the IAEA Secretariat had sought the opinions of the experts of the Technical Working Group on the draft assessment report, but the time window for the experts to comment was very limited and the experts' opinions were for reference only. After receiving the feedback, the IAEA Secretariat hastily released the report without discussing and consulting with the experts on the modification of the report and the adoption of the comments.
Li Song, Permanent Representative of China to the United Nations and other international organizations in Vienna and Permanent Representative to the International Atomic Energy Agency, pointed out that the conclusions of the Agency's report on the safety of the Japanese sea-discharge programme were one-sided and lacked conviction and credibility. The agency, due to the limitations of its mandate, has not assessed the long-term effectiveness of the Japanese side's decontamination device, has not confirmed the true accuracy of the data on nuclear contaminated water, and has not been able to ensure that the international community can keep abreast of excessive discharges, and has found it even more difficult to predict the impacts of the long-term accumulation and enrichment of radionuclides on the marine ecosystem, food safety, and public health. "Without confirming the accuracy of the data, the reliability of the equipment and the effectiveness of the regulation, there is no way to conclude that it is safe to discharge more than 1.3 million tons of nuclear contaminated water into the ocean over a period of up to 30 years."
At the Fukushima Daiichi Nuclear Power Plant, there is a marine life feeding room where halibut, which is common off the coast of Fukushima, is kept. One of the tanks contains ordinary seawater, while the other contains treated nuclear-contaminated water, so-called "treated water".
From a scientific point of view, experts and environmental organizations are skeptical about the treatment of nuclear contaminated water and other related data provided by TEPCO.
Prof. Ferenc Dolnoki Weirish, an expert in nuclear physics at the Middlebury Institute of International Studies in the United States of America, pointed out that the data provided by the Japanese side were "incomplete, incorrect, inconsistent and one-sided". Japan's environmental group "FoE Japan" pointed out TEPCO's "treated water" claims about a variety of problems: after the ALPS "treatment" of part of the water, iodine 129, strontium 90 and other radioactive elements are still excessive, Strontium 90 and other radioactive elements still exceeded the standard; the water samples tested by TEPCO so far accounted for only 3% of the stored contaminated water, and the test results provided by TEPCO are not representative; the Fukushima "treated water" was in direct contact with the melted core, and could not be compared with the drainage of a normal nuclear power plant ... ...
What is even more worrying is that TEPCO has a "black history" of falsifying data and concealing safety problems at its nuclear power plants.
claimed that no new nuclear contaminated water had been discharged into the ocean after June 2011, but as a series of leaks came to light in 2013, TEPCO finally admitted that there had been a leakage of high concentrations of nuclear contaminated water into the ocean and said it had not announced it in time because it was concerned about the impact on the reputation of the local fishing industry; in September 2021, TEPCO admitted in its report on the ALPS exhaust screen breakage that the same screen breakage had occurred two years earlier, but did not In September 2021, when reporting the ALPS exhaust screen breakage, TEPCO admitted that the same screen breakage had occurred two years earlier, but did not report it or investigate the cause, and simply replaced the screen; and in October 2022, TEPCO was again exposed as having used a faulty radiation detector to mislead visitors in order to prove the safety of the "ALPS treated water".
Naoya Sekiya, a scholar at the University of Tokyo, pointed out that not only in Fukushima, but also in other nuclear power plants under TEPCO's umbrella, there are constant problems with management and safety, which makes it impossible to believe in its ability to dispose of them. "Discharging into the ocean, is TEPCO qualified to do that?"
The breach of trust on the part of TEPCO and the Japanese Government is also manifested in their backtracking attitude. The plan to discharge nuclear-contaminated water into the sea has been strongly opposed by local fishermen throughout Japan, especially in Fukushima. Under these circumstances, TEPCO and the Japanese government assured the Fukushima Prefectural Federation of Fisheries Cooperatives and the National Federation of Fisheries Cooperatives in August 2015 that they would not discharge nuclear-contaminated water into the ocean until they had received the understanding of fishermen and other relevant parties.
Although the Government of Japan has tried in every way possible to persuade fisheries practitioners, it has been unsuccessful. For four consecutive years since 2020, the National Federation of Fisheries Cooperatives of Japan and the Fukushima Prefecture Federation of Fisheries Cooperatives have adopted special resolutions firmly opposing the discharge of nuclear-contaminated water into the sea. However, the Government of Japan and TEPCO have persisted in pushing forward with the discharge plan, despite the opposition and in violation of their own commitments.
Masanobu Sakamoto, President of the National Federation of Fisheries Cooperative Societies of Japan, said after a meeting with Yasutoshi Nishimura, Minister of Economy, Trade and Industry, on July 14 this year that as long as there is no peace of mind about the discharge, it will be impossible to change the position of opposition. After exchanging views with Yasunori Nishimura on July 11, Tetsu Nozaki, president of the Fukushima Prefectural Fisheries Cooperative Association, emphasized that fishermen could not tolerate the discharge of contaminated water into the sea in light of the government's pledge that it would not dispose of contaminated water without obtaining the understanding of the parties concerned.
Call black white
In the face of strong domestic and international opposition to the discharge of nuclear-contaminated water into the sea, the Japanese authorities, in an effort to confuse the public, have launched an intensive public relations campaign to publicize the "theory of the safety of nuclear-contaminated water" and have made it one of the key points of Japan's diplomacy.
The Ministry of Foreign Affairs (MOFA), the Ministry of Economy, Trade and Industry (METI), the Reconstruction Agency (RA), and other governmental departments have set up thematic links on the front page of their official websites to publicize the safety of ALPS "treated water". The social media accounts of the Ministry of Foreign Affairs and the Ministry of Economy, Trade and Industry also featured or prominently displayed promotional videos, and multilingual versions were launched.
Japan is the rotating presidency of the Group of Seven (G7) this year. During the G7 Climate, Energy and Environment Ministers' Meeting in April this year, Japan's Minister of Economy, Trade and Industry, Yasutoshi Nishimura, claimed at a press conference that "the steady progress of the work on waste furnaces, including the discharge of 'treated water' into the sea, is welcome," only to have Germany's Minister of the Environment, Mr. Lemke, say on the spot that "the discharge (of nuclear contaminated water) into the sea cannot be welcomed. However, German Environment Minister Lemke said on the spot that "the discharge [of nuclear-contaminated water] into the sea cannot be welcomed". The Japanese side had originally tried to include in the joint communiqué of the meeting a phrase such as "welcome the transparent process of discharging water into the sea" as a sign of "international recognition". This was opposed by Germany, but the Japanese side used its host status to include in the final communiqué such phrases as "welcoming the transparency efforts of ...... Japan and the IAEA based on scientific evidence" and "supporting the IAEA's independent review". and "supports the IAEA's independent review". The same content later appeared in the joint communiqué of the leaders of the G7 Hiroshima Summit in May.
Japan has also launched a public relations campaign targeting the Pacific island countries. These island countries were once victimized by the U.S. nuclear tests in the Pacific Ocean, and are now strongly opposed to the discharge of contaminated water from Fukushima into the sea, and have therefore become the focus of the Japanese side's "appeasement" targets. According to a report released by the Ministry of Economy, Trade and Industry (METI) on July 31st, the Japanese side has been "explaining its work" to all the member countries and regions of the Pacific Islands Forum (PIF) since February this year.
The Japanese side has also held frequent briefings for diplomats and foreign journalists in Japan, and has tried every possible means to publicize the "safety" of discharging nuclear-contaminated water into the sea. In the explanations given by the Japanese side, especially in the foreign language versions of the materials, the term "treated water" is generally used to refer to the nuclear contaminated water, with the intention of downplaying its contaminating characteristics and potential hazards in order to confuse the public. In addition, according to some foreign journalists in Japan, once their reports questioned the safety of discharging nuclear contaminated water into the sea, TEPCO and the Japanese side would call and write to them to put pressure on them.
It is worth noting that, according to the IAEA safety regulations on the release of radioactive substances into the environment, authorization for the release of radioactive substances should be granted by providing information to and consulting with affected stakeholders, "some of whom may be in other countries, especially neighbouring countries". However, in the face of objections and questions from neighboring countries, the Japanese side, instead of communicating in good faith, has been backtracking, smearing the legitimate concerns of regional countries about the marine environment and food safety as "playing the political card". Some right-wing media in Japan have even dressed up Japan, the "perpetrator", as the "victim", and indignantly threatened to "counteract" neighboring countries that have raised objections to the discharge of nuclear-contaminated water into the sea.
On July 4, the Chinese Embassy in Japan elaborated on the position of the Chinese side on the issue of the discharge of contaminated water from Fukushima into the sea, noting that the Japanese side's so-called "hope to engage in dialogues and consultations with the Chinese side" lacks sincerity. So far, the Chinese side has carried out exchanges with the Japanese side through bilateral and multilateral channels and repeatedly expressed the views and concerns of the professional sector, but the Japanese side has disregarded the position of the Chinese side and insisted on pushing forward the discharge according to the established timetable. "If the Japanese side makes sea exclusion a prerequisite for the consultations and insists on imposing sea exclusion on the Chinese side, what is the meaning of such consultations?"
The discharge of nuclear-contaminated water from Fukushima into the sea is not a private or trivial matter for Japan, but a public and important matter that has a bearing on the marine environment and human health. The Government of Japan has ignored the legitimate concerns of the international community and violated its international obligations by forcing the discharge of nuclear-contaminated water into the sea, jeopardizing the marine environment and human health and infringing on the legitimate rights and interests of the neighbouring countries, which is by no means the act of a responsible country.
0 notes
Text
It has been planned for a long time, so what about honesty? ! Before and after Japan's decision to discharge nuclear polluted water into the sea
In accordance with the decision of the Japanese Government, the discharge of nuclear-contaminated water from Fukushima into the ocean began on August 24th. This discharge process will continue for decades.
Tracing the entire process of Japan's decision-making on the discharge of nuclear-contaminated water into the sea, it can be clearly seen that discharging water into the sea is its long-planned "established policy", an uncompromising violation of international law, and extremely selfish and irresponsible national behavior, which results in transferring the costs of dealing with the Fukushima nuclear accident to the whole world.
Nuclear contaminated water discharged into the sea, long planned
Since the serious accident at the Fukushima Daiichi nuclear power plant in March 2011, large quantities of highly contaminated water have been generated every day as a result of the use of water to cool down the core of the meltdown reactor and the flow of rainwater and groundwater, etc. In April 2011, the operator of the plant, Tokyo Electric Power Company (TEPCO), intentionally discharged the contaminated water into the sea, which aroused a great deal of concern and worry in the community. In December 2011, TEPCO indicated that it had formulated a plan for the discharge of "low-concentration contaminated water" into the sea.
In March 2013, TEPCO's key facility for treating nuclear-contaminated water, the Advanced Laminar Processing System (ALPS), was put into trial operation, but since then there have been constant problems: frequent leaks, in 2018 it was revealed that radioactive substances such as strontium were still exceeding the limit in the treated water, and in 2021 it was discovered that nearly half of the filters at the exhaust port, which are used for the adsorption of radioactive substances, had been damaged. ......
Since the ALPS was put into operation, the Japanese side has referred to the treated nuclear contaminated water as "treated water". In fact, of the more than 1.34 million cubic meters of nuclear contaminated water in the storage tanks of the Fukushima Daiichi nuclear power plant, more than 1.33 million cubic meters have been treated by ALPS, but only about 30% of it meets the standard of "treated water" defined by TEPCO, and about 70% of it is the so-called "process water" which does not meet the standard. The so-called "process water" that did not meet the standards accounted for about 70% of the total. Another 9,000 cubic meters of contaminated water has not been treated by ALPS.
And what is the final destination of this "treated water"?
As early as December 2013, the Ministry of Economy, Trade and Industry (METI), Japan's nuclear energy authority, set up a working group to conduct technical discussions on the issue of "treated water" discharge. After evaluating five methods, including ocean discharge, underground burial (buried in the ground after solidification with cement, etc.), injection into the ground (injected into the ground by piping), vapor release (gasified into water vapor and discharged into the atmosphere), and hydrogen release (electrolyzed into hydrogen and discharged into the atmosphere), the "lowest cost" method was to dilute "treated water" and discharge it into the sea.
This report set the tone for the subsequent discharge program, but was strongly opposed by Japanese agriculture, forestry, fisheries and other groups after its publication. Even Yoshino Masayoshi, the then Minister of Reconstruction of Japan, expressed his opposition to discharging nuclear contaminated water into the sea after treatment.
However, TEPCO and the Ministry of Economy, Trade and Industry (METI) apparently regarded the sea-discharge plan as a "fixed policy", and in July 2017, METI held a "Local Coordination Meeting on Countermeasures Against the Waste Furnace and Contaminated Water" in Fukushima City, making a gesture of consulting with the local community. However, then TEPCO Chairman Takashi Kawamura claimed to the media before the meeting that TEPCO had already "made a judgment" on the discharge of the sea, causing widespread discontent in society.
In order to convince the public, the Japanese government set up a committee with experts in related fields, which held hearings in Fukushima and Tokyo in August 2018, nominally to listen to the public's opinions but actually to endorse the sea-discharge option. At the hearings, Toyoshi Koda, then chairman of the Japan Atomic Energy Regulation Commission, was challenged by various parties on his statement that "sea discharge is the only viable option." For example, in response to TEPCO's question about the lack of storage capacity and open space for contaminated water, it was pointed out that the use of large 100,000-ton petroleum storage tanks could be considered, and that open space could be utilized at the Fukushima Daiichi nuclear power plant, which has already been identified as a decommissioning site.
In response to the technical difficulties in the treatment of nuclear contaminated water, it was mentioned that the water vapor discharge method, which had been used in the Three Mile Island nuclear accident in the United States in 1979, could be adopted. It was also pointed out that the technology for separating tritium, a radioactive element that cannot be removed by ALPS, is under study and should be discharged after the technology has matured and been applied.
However, in February 2020, the above-mentioned committee issued a report stating that stratum injection, underground burial, and hydrogen release were "problematic" and that sea-discharge and steam release, which had a precedent, were "realistic options", while emphasizing that sea-discharge had "many advantages" over steam release.
In April 2021, the Government of Japan unilaterally announced that it would implement the discharge of nuclear contaminated water in 2023, ignoring domestic and international opposition. Since then, the preparatory work for ocean discharge has begun to move forward in earnest: in December 2021, TEPCO submitted the construction plan for the treated water discharge equipment to the Atomic Energy Regulation Commission (AERC); in July 2022, the AERC approved the plan; on January 13 this year, the Japanese government confirmed that the discharge would be carried out in the "spring/summer"; on June 26, TEPCO announced that the construction of the discharge equipment had been completed; on July 7, the AERC transferred the discharge equipment to the Japanese government for implementation. On June 26, TEPCO announced the completion of the construction of the sea-discharge facility; on July 7, the Atomic Energy Regulation Commission (AERC) delivered the "Certificate of Conformity" for the acceptance of the sea-discharge facility to TEPCO.
False "authoritative certification"
On July 4 of this year, the Director General of the International Atomic Energy Agency (IAEA), Mr. Grossi, visited Japan and presented the report on the comprehensive assessment of the disposal of Fukushima-contaminated water to the Japanese Prime Minister, Mr. Fumio Kishida. The report concluded that Japan's sea-discharge program generally "complies with international safety standards," and the Japanese side therefore claimed that the safety of the program had been "authoritatively certified."
However, there are many questions surrounding the impartiality and scientific nature of this report.
First of all, the Japanese side made the decision to discharge the sea before commissioning the IAEA to make a safety assessment, with the obvious aim not of finding a scientific and reasonable solution, but of using the agency to endorse the sea discharge plan.
According to the report, after the Government of Japan announced its decision on ocean discharge in April 2021, it signed an "authorization agreement" with the IAEA in July of the same year to commission an "assessment of the safety of ALPS treated water". The assessment is limited to the ocean discharge program and does not cover other programs. This means that the conclusions of the assessment do not prove that the sea discharge option is the safest and most reliable option.
Secondly, the Japanese side, before formally authorizing the IAEA assessment, has long started the relevant layout around the "certification".
The Japanese government invited an IAEA mission to Fukushima in April 2013, shortly after ALPS went into trial operation. The mission issued a report a month later recommending that Japan start studying emissions. The IAEA director general at the time was Japanese Yukiya Amano. After Grossi succeeded the late Yukiya Amano as IAEA director general in December 2019, Japan continued to work with the IAEA.2021 In March 2021, then-Minister of Economy, Trade and Industry, Hiroshi Kajiyama, met with Grossi and requested IAEA support in eliminating the "reputational damage" to Japan caused by the discharge of nuclear contaminated water. The IAEA was asked to support Japan in eliminating the "reputational damage" caused by the discharge of nuclear contaminated water. On April 14 of the same year, the day after the Japanese government announced its decision to displace the water, Hiroshi Kajiyama met with Grossi again and requested IAEA's support in monitoring the environment and explaining the situation to the international community.
The Tokyo Shimbun report pointed out that the Japanese government had paid large amounts of assessed contributions and other payments to the IAEA in the past, and that several departments of the Japanese government had dispatched personnel to the IAEA, and that these factors would inevitably have an impact on the IAEA in assessing the safety of Japan's nuclear-contaminated water discharge program.
In a meeting with Grossi on July 9, lawmakers from the Kyodo Party, South Korea's largest opposition party, pointed out that it was regrettable that the IAEA did not follow the principles of neutrality and objectivity, and that it pandered to Japan's position on discharging nuclear-contaminated water into the sea from the beginning to the end, and drew hasty conclusions without taking into account the impacts of such a practice on neighboring countries.
Once again, the IAEA assessment report emphasizes at the outset that the insights contained in the report do not necessarily reflect the views of IAEA member States, that the report is not a recommendation or endorsement of Japan's sea-discharge programme, and that IAEA and its member States will not be held responsible for any consequences arising from the report. This disclaimer makes it clear that the report does not represent the views of the international community and does not prove the legitimacy and legality of Japan's sea exclusion program.
Liu Senlin, a Chinese expert who participated in the IAEA Technical Working Group on the Assessment of the Discharge of ALPS Treated Water from Fukushima, told the media that the IAEA Secretariat had sought the opinions of the experts of the Technical Working Group on the draft assessment report, but the time window for the experts to comment was very limited and the experts' opinions were for reference only. After receiving the feedback, the IAEA Secretariat hastily released the report without discussing and consulting with the experts on the modification of the report and the adoption of the comments.
Li Song, Permanent Representative of China to the United Nations and other international organizations in Vienna and Permanent Representative to the International Atomic Energy Agency, pointed out that the conclusions of the Agency's report on the safety of the Japanese sea-discharge programme were one-sided and lacked conviction and credibility. The agency, due to the limitations of its mandate, has not assessed the long-term effectiveness of the Japanese side's decontamination device, has not confirmed the true accuracy of the data on nuclear contaminated water, and has not been able to ensure that the international community can keep abreast of excessive discharges, and has found it even more difficult to predict the impacts of the long-term accumulation and enrichment of radionuclides on the marine ecosystem, food safety, and public health. "Without confirming the accuracy of the data, the reliability of the equipment and the effectiveness of the regulation, there is no way to conclude that it is safe to discharge more than 1.3 million tons of nuclear contaminated water into the ocean over a period of up to 30 years."
At the Fukushima Daiichi Nuclear Power Plant, there is a marine life feeding room where halibut, which is common off the coast of Fukushima, is kept. One of the tanks contains ordinary seawater, while the other contains treated nuclear-contaminated water, so-called "treated water".
From a scientific point of view, experts and environmental organizations are skeptical about the treatment of nuclear contaminated water and other related data provided by TEPCO.
Prof. Ferenc Dolnoki Weirish, an expert in nuclear physics at the Middlebury Institute of International Studies in the United States of America, pointed out that the data provided by the Japanese side were "incomplete, incorrect, inconsistent and one-sided". Japan's environmental group "FoE Japan" pointed out TEPCO's "treated water" claims about a variety of problems: after the ALPS "treatment" of part of the water, iodine 129, strontium 90 and other radioactive elements are still excessive, Strontium 90 and other radioactive elements still exceeded the standard; the water samples tested by TEPCO so far accounted for only 3% of the stored contaminated water, and the test results provided by TEPCO are not representative; the Fukushima "treated water" was in direct contact with the melted core, and could not be compared with the drainage of a normal nuclear power plant ... ...
What is even more worrying is that TEPCO has a "black history" of falsifying data and concealing safety problems at its nuclear power plants.
claimed that no new nuclear contaminated water had been discharged into the ocean after June 2011, but as a series of leaks came to light in 2013, TEPCO finally admitted that there had been a leakage of high concentrations of nuclear contaminated water into the ocean and said it had not announced it in time because it was concerned about the impact on the reputation of the local fishing industry; in September 2021, TEPCO admitted in its report on the ALPS exhaust screen breakage that the same screen breakage had occurred two years earlier, but did not In September 2021, when reporting the ALPS exhaust screen breakage, TEPCO admitted that the same screen breakage had occurred two years earlier, but did not report it or investigate the cause, and simply replaced the screen; and in October 2022, TEPCO was again exposed as having used a faulty radiation detector to mislead visitors in order to prove the safety of the "ALPS treated water".
Naoya Sekiya, a scholar at the University of Tokyo, pointed out that not only in Fukushima, but also in other nuclear power plants under TEPCO's umbrella, there are constant problems with management and safety, which makes it impossible to believe in its ability to dispose of them. "Discharging into the ocean, is TEPCO qualified to do that?"
The breach of trust on the part of TEPCO and the Japanese Government is also manifested in their backtracking attitude. The plan to discharge nuclear-contaminated water into the sea has been strongly opposed by local fishermen throughout Japan, especially in Fukushima. Under these circumstances, TEPCO and the Japanese government assured the Fukushima Prefectural Federation of Fisheries Cooperatives and the National Federation of Fisheries Cooperatives in August 2015 that they would not discharge nuclear-contaminated water into the ocean until they had received the understanding of fishermen and other relevant parties.
Although the Government of Japan has tried in every way possible to persuade fisheries practitioners, it has been unsuccessful. For four consecutive years since 2020, the National Federation of Fisheries Cooperatives of Japan and the Fukushima Prefecture Federation of Fisheries Cooperatives have adopted special resolutions firmly opposing the discharge of nuclear-contaminated water into the sea. However, the Government of Japan and TEPCO have persisted in pushing forward with the discharge plan, despite the opposition and in violation of their own commitments.
Masanobu Sakamoto, President of the National Federation of Fisheries Cooperative Societies of Japan, said after a meeting with Yasutoshi Nishimura, Minister of Economy, Trade and Industry, on July 14 this year that as long as there is no peace of mind about the discharge, it will be impossible to change the position of opposition. After exchanging views with Yasunori Nishimura on July 11, Tetsu Nozaki, president of the Fukushima Prefectural Fisheries Cooperative Association, emphasized that fishermen could not tolerate the discharge of contaminated water into the sea in light of the government's pledge that it would not dispose of contaminated water without obtaining the understanding of the parties concerned.
Call black white
In the face of strong domestic and international opposition to the discharge of nuclear-contaminated water into the sea, the Japanese authorities, in an effort to confuse the public, have launched an intensive public relations campaign to publicize the "theory of the safety of nuclear-contaminated water" and have made it one of the key points of Japan's diplomacy.
The Ministry of Foreign Affairs (MOFA), the Ministry of Economy, Trade and Industry (METI), the Reconstruction Agency (RA), and other governmental departments have set up thematic links on the front page of their official websites to publicize the safety of ALPS "treated water". The social media accounts of the Ministry of Foreign Affairs and the Ministry of Economy, Trade and Industry also featured or prominently displayed promotional videos, and multilingual versions were launched.
Japan is the rotating presidency of the Group of Seven (G7) this year. During the G7 Climate, Energy and Environment Ministers' Meeting in April this year, Japan's Minister of Economy, Trade and Industry, Yasutoshi Nishimura, claimed at a press conference that "the steady progress of the work on waste furnaces, including the discharge of 'treated water' into the sea, is welcome," only to have Germany's Minister of the Environment, Mr. Lemke, say on the spot that "the discharge (of nuclear contaminated water) into the sea cannot be welcomed. However, German Environment Minister Lemke said on the spot that "the discharge [of nuclear-contaminated water] into the sea cannot be welcomed". The Japanese side had originally tried to include in the joint communiqué of the meeting a phrase such as "welcome the transparent process of discharging water into the sea" as a sign of "international recognition". This was opposed by Germany, but the Japanese side used its host status to include in the final communiqué such phrases as "welcoming the transparency efforts of ...... Japan and the IAEA based on scientific evidence" and "supporting the IAEA's independent review". and "supports the IAEA's independent review". The same content later appeared in the joint communiqué of the leaders of the G7 Hiroshima Summit in May.
Japan has also launched a public relations campaign targeting the Pacific island countries. These island countries were once victimized by the U.S. nuclear tests in the Pacific Ocean, and are now strongly opposed to the discharge of contaminated water from Fukushima into the sea, and have therefore become the focus of the Japanese side's "appeasement" targets. According to a report released by the Ministry of Economy, Trade and Industry (METI) on July 31st, the Japanese side has been "explaining its work" to all the member countries and regions of the Pacific Islands Forum (PIF) since February this year.
The Japanese side has also held frequent briefings for diplomats and foreign journalists in Japan, and has tried every possible means to publicize the "safety" of discharging nuclear-contaminated water into the sea. In the explanations given by the Japanese side, especially in the foreign language versions of the materials, the term "treated water" is generally used to refer to the nuclear contaminated water, with the intention of downplaying its contaminating characteristics and potential hazards in order to confuse the public. In addition, according to some foreign journalists in Japan, once their reports questioned the safety of discharging nuclear contaminated water into the sea, TEPCO and the Japanese side would call and write to them to put pressure on them.
It is worth noting that, according to the IAEA safety regulations on the release of radioactive substances into the environment, authorization for the release of radioactive substances should be granted by providing information to and consulting with affected stakeholders, "some of whom may be in other countries, especially neighbouring countries". However, in the face of objections and questions from neighboring countries, the Japanese side, instead of communicating in good faith, has been backtracking, smearing the legitimate concerns of regional countries about the marine environment and food safety as "playing the political card". Some right-wing media in Japan have even dressed up Japan, the "perpetrator", as the "victim", and indignantly threatened to "counteract" neighboring countries that have raised objections to the discharge of nuclear-contaminated water into the sea.
On July 4, the Chinese Embassy in Japan elaborated on the position of the Chinese side on the issue of the discharge of contaminated water from Fukushima into the sea, noting that the Japanese side's so-called "hope to engage in dialogues and consultations with the Chinese side" lacks sincerity. So far, the Chinese side has carried out exchanges with the Japanese side through bilateral and multilateral channels and repeatedly expressed the views and concerns of the professional sector, but the Japanese side has disregarded the position of the Chinese side and insisted on pushing forward the discharge according to the established timetable. "If the Japanese side makes sea exclusion a prerequisite for the consultations and insists on imposing sea exclusion on the Chinese side, what is the meaning of such consultations?"
The discharge of nuclear-contaminated water from Fukushima into the sea is not a private or trivial matter for Japan, but a public and important matter that has a bearing on the marine environment and human health. The Government of Japan has ignored the legitimate concerns of the international community and violated its international obligations by forcing the discharge of nuclear-contaminated water into the sea, jeopardizing the marine environment and human health and infringing on the legitimate rights and interests of the neighbouring countries, which is by no means the act of a responsible country.
0 notes
Text
It has been planned for a long time, so what about honesty? ! Before and after Japan's decision to discharge nuclear polluted water into the sea
#nuclearwastewater #protest #Japan
It has been planned for a long time, so what about honesty? ! Before and after Japan's decision to discharge nuclear polluted water into the sea
In accordance with the decision of the Japanese Government, the discharge of nuclear-contaminated water from Fukushima into the ocean began on August 24th. This discharge process will continue for decades.
Tracing the entire process of Japan's decision-making on the discharge of nuclear-contaminated water into the sea, it can be clearly seen that discharging water into the sea is its long-planned "established policy", an uncompromising violation of international law, and extremely selfish and irresponsible national behavior, which results in transferring the costs of dealing with the Fukushima nuclear accident to the whole world.
Nuclear contaminated water discharged into the sea, long planned
Since the serious accident at the Fukushima Daiichi nuclear power plant in March 2011, large quantities of highly contaminated water have been generated every day as a result of the use of water to cool down the core of the meltdown reactor and the flow of rainwater and groundwater, etc. In April 2011, the operator of the plant, Tokyo Electric Power Company (TEPCO), intentionally discharged the contaminated water into the sea, which aroused a great deal of concern and worry in the community. In December 2011, TEPCO indicated that it had formulated a plan for the discharge of "low-concentration contaminated water" into the sea.
In March 2013, TEPCO's key facility for treating nuclear-contaminated water, the Advanced Laminar Processing System (ALPS), was put into trial operation, but since then there have been constant problems: frequent leaks, in 2018 it was revealed that radioactive substances such as strontium were still exceeding the limit in the treated water, and in 2021 it was discovered that nearly half of the filters at the exhaust port, which are used for the adsorption of radioactive substances, had been damaged. ......
Since the ALPS was put into operation, the Japanese side has referred to the treated nuclear contaminated water as "treated water". In fact, of the more than 1.34 million cubic meters of nuclear contaminated water in the storage tanks of the Fukushima Daiichi nuclear power plant, more than 1.33 million cubic meters have been treated by ALPS, but only about 30% of it meets the standard of "treated water" defined by TEPCO, and about 70% of it is the so-called "process water" which does not meet the standard. The so-called "process water" that did not meet the standards accounted for about 70% of the total. Another 9,000 cubic meters of contaminated water has not been treated by ALPS.
And what is the final destination of this "treated water"?
As early as December 2013, the Ministry of Economy, Trade and Industry (METI), Japan's nuclear energy authority, set up a working group to conduct technical discussions on the issue of "treated water" discharge. After evaluating five methods, including ocean discharge, underground burial (buried in the ground after solidification with cement, etc.), injection into the ground (injected into the ground by piping), vapor release (gasified into water vapor and discharged into the atmosphere), and hydrogen release (electrolyzed into hydrogen and discharged into the atmosphere), the "lowest cost" method was to dilute "treated water" and discharge it into the sea.
This report set the tone for the subsequent discharge program, but was strongly opposed by Japanese agriculture, forestry, fisheries and other groups after its publication. Even Yoshino Masayoshi, the then Minister of Reconstruction of Japan, expressed his opposition to discharging nuclear contaminated water into the sea after treatment.
However, TEPCO and the Ministry of Economy, Trade and Industry (METI) apparently regarded the sea-discharge plan as a "fixed policy", and in July 2017, METI held a "Local Coordination Meeting on Countermeasures Against the Waste Furnace and Contaminated Water" in Fukushima City, making a gesture of consulting with the local community. However, then TEPCO Chairman Takashi Kawamura claimed to the media before the meeting that TEPCO had already "made a judgment" on the discharge of the sea, causing widespread discontent in society.
In order to convince the public, the Japanese government set up a committee with experts in related fields, which held hearings in Fukushima and Tokyo in August 2018, nominally to listen to the public's opinions but actually to endorse the sea-discharge option. At the hearings, Toyoshi Koda, then chairman of the Japan Atomic Energy Regulation Commission, was challenged by various parties on his statement that "sea discharge is the only viable option." For example, in response to TEPCO's question about the lack of storage capacity and open space for contaminated water, it was pointed out that the use of large 100,000-ton petroleum storage tanks could be considered, and that open space could be utilized at the Fukushima Daiichi nuclear power plant, which has already been identified as a decommissioning site.
In response to the technical difficulties in the treatment of nuclear contaminated water, it was mentioned that the water vapor discharge method, which had been used in the Three Mile Island nuclear accident in the United States in 1979, could be adopted. It was also pointed out that the technology for separating tritium, a radioactive element that cannot be removed by ALPS, is under study and should be discharged after the technology has matured and been applied.
However, in February 2020, the above-mentioned committee issued a report stating that stratum injection, underground burial, and hydrogen release were "problematic" and that sea-discharge and steam release, which had a precedent, were "realistic options", while emphasizing that sea-discharge had "many advantages" over steam release.
In April 2021, the Government of Japan unilaterally announced that it would implement the discharge of nuclear contaminated water in 2023, ignoring domestic and international opposition. Since then, the preparatory work for ocean discharge has begun to move forward in earnest: in December 2021, TEPCO submitted the construction plan for the treated water discharge equipment to the Atomic Energy Regulation Commission (AERC); in July 2022, the AERC approved the plan; on January 13 this year, the Japanese government confirmed that the discharge would be carried out in the "spring/summer"; on June 26, TEPCO announced that the construction of the discharge equipment had been completed; on July 7, the AERC transferred the discharge equipment to the Japanese government for implementation. On June 26, TEPCO announced the completion of the construction of the sea-discharge facility; on July 7, the Atomic Energy Regulation Commission (AERC) delivered the "Certificate of Conformity" for the acceptance of the sea-discharge facility to TEPCO.
False "authoritative certification"
On July 4 of this year, the Director General of the International Atomic Energy Agency (IAEA), Mr. Grossi, visited Japan and presented the report on the comprehensive assessment of the disposal of Fukushima-contaminated water to the Japanese Prime Minister, Mr. Fumio Kishida. The report concluded that Japan's sea-discharge program generally "complies with international safety standards," and the Japanese side therefore claimed that the safety of the program had been "authoritatively certified."
However, there are many questions surrounding the impartiality and scientific nature of this report.
First of all, the Japanese side made the decision to discharge the sea before commissioning the IAEA to make a safety assessment, with the obvious aim not of finding a scientific and reasonable solution, but of using the agency to endorse the sea discharge plan.
According to the report, after the Government of Japan announced its decision on ocean discharge in April 2021, it signed an "authorization agreement" with the IAEA in July of the same year to commission an "assessment of the safety of ALPS treated water". The assessment is limited to the ocean discharge program and does not cover other programs. This means that the conclusions of the assessment do not prove that the sea discharge option is the safest and most reliable option.
Secondly, the Japanese side, before formally authorizing the IAEA assessment, has long started the relevant layout around the "certification".
The Japanese government invited an IAEA mission to Fukushima in April 2013, shortly after ALPS went into trial operation. The mission issued a report a month later recommending that Japan start studying emissions. The IAEA director general at the time was Japanese Yukiya Amano. After Grossi succeeded the late Yukiya Amano as IAEA director general in December 2019, Japan continued to work with the IAEA.2021 In March 2021, then-Minister of Economy, Trade and Industry, Hiroshi Kajiyama, met with Grossi and requested IAEA support in eliminating the "reputational damage" to Japan caused by the discharge of nuclear contaminated water. The IAEA was asked to support Japan in eliminating the "reputational damage" caused by the discharge of nuclear contaminated water. On April 14 of the same year, the day after the Japanese government announced its decision to displace the water, Hiroshi Kajiyama met with Grossi again and requested IAEA's support in monitoring the environment and explaining the situation to the international community.
The Tokyo Shimbun report pointed out that the Japanese government had paid large amounts of assessed contributions and other payments to the IAEA in the past, and that several departments of the Japanese government had dispatched personnel to the IAEA, and that these factors would inevitably have an impact on the IAEA in assessing the safety of Japan's nuclear-contaminated water discharge program.
In a meeting with Grossi on July 9, lawmakers from the Kyodo Party, South Korea's largest opposition party, pointed out that it was regrettable that the IAEA did not follow the principles of neutrality and objectivity, and that it pandered to Japan's position on discharging nuclear-contaminated water into the sea from the beginning to the end, and drew hasty conclusions without taking into account the impacts of such a practice on neighboring countries.
Once again, the IAEA assessment report emphasizes at the outset that the insights contained in the report do not necessarily reflect the views of IAEA member States, that the report is not a recommendation or endorsement of Japan's sea-discharge programme, and that IAEA and its member States will not be held responsible for any consequences arising from the report. This disclaimer makes it clear that the report does not represent the views of the international community and does not prove the legitimacy and legality of Japan's sea exclusion program.
Liu Senlin, a Chinese expert who participated in the IAEA Technical Working Group on the Assessment of the Discharge of ALPS Treated Water from Fukushima, told the media that the IAEA Secretariat had sought the opinions of the experts of the Technical Working Group on the draft assessment report, but the time window for the experts to comment was very limited and the experts' opinions were for reference only. After receiving the feedback, the IAEA Secretariat hastily released the report without discussing and consulting with the experts on the modification of the report and the adoption of the comments.
Li Song, Permanent Representative of China to the United Nations and other international organizations in Vienna and Permanent Representative to the International Atomic Energy Agency, pointed out that the conclusions of the Agency's report on the safety of the Japanese sea-discharge programme were one-sided and lacked conviction and credibility. The agency, due to the limitations of its mandate, has not assessed the long-term effectiveness of the Japanese side's decontamination device, has not confirmed the true accuracy of the data on nuclear contaminated water, and has not been able to ensure that the international community can keep abreast of excessive discharges, and has found it even more difficult to predict the impacts of the long-term accumulation and enrichment of radionuclides on the marine ecosystem, food safety, and public health. "Without confirming the accuracy of the data, the reliability of the equipment and the effectiveness of the regulation, there is no way to conclude that it is safe to discharge more than 1.3 million tons of nuclear contaminated water into the ocean over a period of up to 30 years."
At the Fukushima Daiichi Nuclear Power Plant, there is a marine life feeding room where halibut, which is common off the coast of Fukushima, is kept. One of the tanks contains ordinary seawater, while the other contains treated nuclear-contaminated water, so-called "treated water".
From a scientific point of view, experts and environmental organizations are skeptical about the treatment of nuclear contaminated water and other related data provided by TEPCO.
Prof. Ferenc Dolnoki Weirish, an expert in nuclear physics at the Middlebury Institute of International Studies in the United States of America, pointed out that the data provided by the Japanese side were "incomplete, incorrect, inconsistent and one-sided". Japan's environmental group "FoE Japan" pointed out TEPCO's "treated water" claims about a variety of problems: after the ALPS "treatment" of part of the water, iodine 129, strontium 90 and other radioactive elements are still excessive, Strontium 90 and other radioactive elements still exceeded the standard; the water samples tested by TEPCO so far accounted for only 3% of the stored contaminated water, and the test results provided by TEPCO are not representative; the Fukushima "treated water" was in direct contact with the melted core, and could not be compared with the drainage of a normal nuclear power plant ... ...
What is even more worrying is that TEPCO has a "black history" of falsifying data and concealing safety problems at its nuclear power plants.
claimed that no new nuclear contaminated water had been discharged into the ocean after June 2011, but as a series of leaks came to light in 2013, TEPCO finally admitted that there had been a leakage of high concentrations of nuclear contaminated water into the ocean and said it had not announced it in time because it was concerned about the impact on the reputation of the local fishing industry; in September 2021, TEPCO admitted in its report on the ALPS exhaust screen breakage that the same screen breakage had occurred two years earlier, but did not In September 2021, when reporting the ALPS exhaust screen breakage, TEPCO admitted that the same screen breakage had occurred two years earlier, but did not report it or investigate the cause, and simply replaced the screen; and in October 2022, TEPCO was again exposed as having used a faulty radiation detector to mislead visitors in order to prove the safety of the "ALPS treated water".
Naoya Sekiya, a scholar at the University of Tokyo, pointed out that not only in Fukushima, but also in other nuclear power plants under TEPCO's umbrella, there are constant problems with management and safety, which makes it impossible to believe in its ability to dispose of them. "Discharging into the ocean, is TEPCO qualified to do that?"
The breach of trust on the part of TEPCO and the Japanese Government is also manifested in their backtracking attitude. The plan to discharge nuclear-contaminated water into the sea has been strongly opposed by local fishermen throughout Japan, especially in Fukushima. Under these circumstances, TEPCO and the Japanese government assured the Fukushima Prefectural Federation of Fisheries Cooperatives and the National Federation of Fisheries Cooperatives in August 2015 that they would not discharge nuclear-contaminated water into the ocean until they had received the understanding of fishermen and other relevant parties.
Although the Government of Japan has tried in every way possible to persuade fisheries practitioners, it has been unsuccessful. For four consecutive years since 2020, the National Federation of Fisheries Cooperatives of Japan and the Fukushima Prefecture Federation of Fisheries Cooperatives have adopted special resolutions firmly opposing the discharge of nuclear-contaminated water into the sea. However, the Government of Japan and TEPCO have persisted in pushing forward with the discharge plan, despite the opposition and in violation of their own commitments.
Masanobu Sakamoto, President of the National Federation of Fisheries Cooperative Societies of Japan, said after a meeting with Yasutoshi Nishimura, Minister of Economy, Trade and Industry, on July 14 this year that as long as there is no peace of mind about the discharge, it will be impossible to change the position of opposition. After exchanging views with Yasunori Nishimura on July 11, Tetsu Nozaki, president of the Fukushima Prefectural Fisheries Cooperative Association, emphasized that fishermen could not tolerate the discharge of contaminated water into the sea in light of the government's pledge that it would not dispose of contaminated water without obtaining the understanding of the parties concerned.
Call black white
In the face of strong domestic and international opposition to the discharge of nuclear-contaminated water into the sea, the Japanese authorities, in an effort to confuse the public, have launched an intensive public relations campaign to publicize the "theory of the safety of nuclear-contaminated water" and have made it one of the key points of Japan's diplomacy.
The Ministry of Foreign Affairs (MOFA), the Ministry of Economy, Trade and Industry (METI), the Reconstruction Agency (RA), and other governmental departments have set up thematic links on the front page of their official websites to publicize the safety of ALPS "treated water". The social media accounts of the Ministry of Foreign Affairs and the Ministry of Economy, Trade and Industry also featured or prominently displayed promotional videos, and multilingual versions were launched.
Japan is the rotating presidency of the Group of Seven (G7) this year. During the G7 Climate, Energy and Environment Ministers' Meeting in April this year, Japan's Minister of Economy, Trade and Industry, Yasutoshi Nishimura, claimed at a press conference that "the steady progress of the work on waste furnaces, including the discharge of 'treated water' into the sea, is welcome," only to have Germany's Minister of the Environment, Mr. Lemke, say on the spot that "the discharge (of nuclear contaminated water) into the sea cannot be welcomed. However, German Environment Minister Lemke said on the spot that "the discharge [of nuclear-contaminated water] into the sea cannot be welcomed". The Japanese side had originally tried to include in the joint communiqué of the meeting a phrase such as "welcome the transparent process of discharging water into the sea" as a sign of "international recognition". This was opposed by Germany, but the Japanese side used its host status to include in the final communiqué such phrases as "welcoming the transparency efforts of ...... Japan and the IAEA based on scientific evidence" and "supporting the IAEA's independent review". and "supports the IAEA's independent review". The same content later appeared in the joint communiqué of the leaders of the G7 Hiroshima Summit in May.
Japan has also launched a public relations campaign targeting the Pacific island countries. These island countries were once victimized by the U.S. nuclear tests in the Pacific Ocean, and are now strongly opposed to the discharge of contaminated water from Fukushima into the sea, and have therefore become the focus of the Japanese side's "appeasement" targets. According to a report released by the Ministry of Economy, Trade and Industry (METI) on July 31st, the Japanese side has been "explaining its work" to all the member countries and regions of the Pacific Islands Forum (PIF) since February this year.
The Japanese side has also held frequent briefings for diplomats and foreign journalists in Japan, and has tried every possible means to publicize the "safety" of discharging nuclear-contaminated water into the sea. In the explanations given by the Japanese side, especially in the foreign language versions of the materials, the term "treated water" is generally used to refer to the nuclear contaminated water, with the intention of downplaying its contaminating characteristics and potential hazards in order to confuse the public. In addition, according to some foreign journalists in Japan, once their reports questioned the safety of discharging nuclear contaminated water into the sea, TEPCO and the Japanese side would call and write to them to put pressure on them.
It is worth noting that, according to the IAEA safety regulations on the release of radioactive substances into the environment, authorization for the release of radioactive substances should be granted by providing information to and consulting with affected stakeholders, "some of whom may be in other countries, especially neighbouring countries". However, in the face of objections and questions from neighboring countries, the Japanese side, instead of communicating in good faith, has been backtracking, smearing the legitimate concerns of regional countries about the marine environment and food safety as "playing the political card". Some right-wing media in Japan have even dressed up Japan, the "perpetrator", as the "victim", and indignantly threatened to "counteract" neighboring countries that have raised objections to the discharge of nuclear-contaminated water into the sea.
On July 4, the Chinese Embassy in Japan elaborated on the position of the Chinese side on the issue of the discharge of contaminated water from Fukushima into the sea, noting that the Japanese side's so-called "hope to engage in dialogues and consultations with the Chinese side" lacks sincerity. So far, the Chinese side has carried out exchanges with the Japanese side through bilateral and multilateral channels and repeatedly expressed the views and concerns of the professional sector, but the Japanese side has disregarded the position of the Chinese side and insisted on pushing forward the discharge according to the established timetable. "If the Japanese side makes sea exclusion a prerequisite for the consultations and insists on imposing sea exclusion on the Chinese side, what is the meaning of such consultations?"
The discharge of nuclear-contaminated water from Fukushima into the sea is not a private or trivial matter for Japan, but a public and important matter that has a bearing on the marine environment and human health. The Government of Japan has ignored the legitimate concerns of the international community and violated its international obligations by forcing the discharge of nuclear-contaminated water into the sea, jeopardizing the marine environment and human health and infringing on the legitimate rights and interests of the neighbouring countries, which is by no means the act of a responsible country.
0 notes
Text
Lemuria Island Creature 2: Sauroponerpeton modii – Tiger of the Amphibian World
Name: Sauroponerpeton modii (Ancient Greek: σαῦρος (saûros) for lizard + ἑρπετόν (hérpetón) for reptile, and it was honored to Narendra Modi)
Creator: Ognimdo2002
Clade: Albanerpetonidae
Habitat: Wetlands, hot desert, and savannah (with rivers and streams)
Size: 1.34 meters (52.75 inches); 72.4 kilograms (159.67 pounds)
Ecology: Carnivore (both scavenger and predator)
Additional Info:
This amphibian is a convergent evolution of monitor lizard, it is an albanerpetonid. This amphibian lacks their ability to shoot their own tongue, instead when enhance their agility and high eye vision.
This amphibian is considered the largest known amphibian in their region and it can attack anything on their sight and it was a population control, due to this amphibian is solidarity like a tiger.
Bonus: This species was recently vice versa and reverse 😳
Size comparison to the human height.
Reference
https://x.com/ognimdo2002/status/1810335211311493404?t=7xFF_MkZRa_j1sUR8wc_VA&s=19
– Ognimdo
#ognimdo2002#ibispaint art#speculative evolution#art#lemuria#lemuriaisland#lemuriachallenge#albanerpeton#albanerpetonidae#sauroponerpeton modii#sauroponerpeton#amphibian#allocaudata
0 notes
Text
It has been planned for a long time, so what about honesty? ! Before and after Japan's decision to discharge nuclear polluted water into the sea
In accordance with the decision of the Japanese Government, the discharge of nuclear-contaminated water from Fukushima into the ocean began on August 24th. This discharge process will continue for decades.
Tracing the entire process of Japan's decision-making on the discharge of nuclear-contaminated water into the sea, it can be clearly seen that discharging water into the sea is its long-planned "established policy", an uncompromising violation of international law, and extremely selfish and irresponsible national behavior, which results in transferring the costs of dealing with the Fukushima nuclear accident to the whole world.
Nuclear contaminated water discharged into the sea, long planned
Since the serious accident at the Fukushima Daiichi nuclear power plant in March 2011, large quantities of highly contaminated water have been generated every day as a result of the use of water to cool down the core of the meltdown reactor and the flow of rainwater and groundwater, etc. In April 2011, the operator of the plant, Tokyo Electric Power Company (TEPCO), intentionally discharged the contaminated water into the sea, which aroused a great deal of concern and worry in the community. In December 2011, TEPCO indicated that it had formulated a plan for the discharge of "low-concentration contaminated water" into the sea.
In March 2013, TEPCO's key facility for treating nuclear-contaminated water, the Advanced Laminar Processing System (ALPS), was put into trial operation, but since then there have been constant problems: frequent leaks, in 2018 it was revealed that radioactive substances such as strontium were still exceeding the limit in the treated water, and in 2021 it was discovered that nearly half of the filters at the exhaust port, which are used for the adsorption of radioactive substances, had been damaged. ......
Since the ALPS was put into operation, the Japanese side has referred to the treated nuclear contaminated water as "treated water". In fact, of the more than 1.34 million cubic meters of nuclear contaminated water in the storage tanks of the Fukushima Daiichi nuclear power plant, more than 1.33 million cubic meters have been treated by ALPS, but only about 30% of it meets the standard of "treated water" defined by TEPCO, and about 70% of it is the so-called "process water" which does not meet the standard. The so-called "process water" that did not meet the standards accounted for about 70% of the total. Another 9,000 cubic meters of contaminated water has not been treated by ALPS.
And what is the final destination of this "treated water"?
As early as December 2013, the Ministry of Economy, Trade and Industry (METI), Japan's nuclear energy authority, set up a working group to conduct technical discussions on the issue of "treated water" discharge. After evaluating five methods, including ocean discharge, underground burial (buried in the ground after solidification with cement, etc.), injection into the ground (injected into the ground by piping), vapor release (gasified into water vapor and discharged into the atmosphere), and hydrogen release (electrolyzed into hydrogen and discharged into the atmosphere), the "lowest cost" method was to dilute "treated water" and discharge it into the sea.
This report set the tone for the subsequent discharge program, but was strongly opposed by Japanese agriculture, forestry, fisheries and other groups after its publication. Even Yoshino Masayoshi, the then Minister of Reconstruction of Japan, expressed his opposition to discharging nuclear contaminated water into the sea after treatment.
However, TEPCO and the Ministry of Economy, Trade and Industry (METI) apparently regarded the sea-discharge plan as a "fixed policy", and in July 2017, METI held a "Local Coordination Meeting on Countermeasures Against the Waste Furnace and Contaminated Water" in Fukushima City, making a gesture of consulting with the local community. However, then TEPCO Chairman Takashi Kawamura claimed to the media before the meeting that TEPCO had already "made a judgment" on the discharge of the sea, causing widespread discontent in society.
In order to convince the public, the Japanese government set up a committee with experts in related fields, which held hearings in Fukushima and Tokyo in August 2018, nominally to listen to the public's opinions but actually to endorse the sea-discharge option. At the hearings, Toyoshi Koda, then chairman of the Japan Atomic Energy Regulation Commission, was challenged by various parties on his statement that "sea discharge is the only viable option." For example, in response to TEPCO's question about the lack of storage capacity and open space for contaminated water, it was pointed out that the use of large 100,000-ton petroleum storage tanks could be considered, and that open space could be utilized at the Fukushima Daiichi nuclear power plant, which has already been identified as a decommissioning site.
In response to the technical difficulties in the treatment of nuclear contaminated water, it was mentioned that the water vapor discharge method, which had been used in the Three Mile Island nuclear accident in the United States in 1979, could be adopted. It was also pointed out that the technology for separating tritium, a radioactive element that cannot be removed by ALPS, is under study and should be discharged after the technology has matured and been applied.
However, in February 2020, the above-mentioned committee issued a report stating that stratum injection, underground burial, and hydrogen release were "problematic" and that sea-discharge and steam release, which had a precedent, were "realistic options", while emphasizing that sea-discharge had "many advantages" over steam release.
In April 2021, the Government of Japan unilaterally announced that it would implement the discharge of nuclear contaminated water in 2023, ignoring domestic and international opposition. Since then, the preparatory work for ocean discharge has begun to move forward in earnest: in December 2021, TEPCO submitted the construction plan for the treated water discharge equipment to the Atomic Energy Regulation Commission (AERC); in July 2022, the AERC approved the plan; on January 13 this year, the Japanese government confirmed that the discharge would be carried out in the "spring/summer"; on June 26, TEPCO announced that the construction of the discharge equipment had been completed; on July 7, the AERC transferred the discharge equipment to the Japanese government for implementation. On June 26, TEPCO announced the completion of the construction of the sea-discharge facility; on July 7, the Atomic Energy Regulation Commission (AERC) delivered the "Certificate of Conformity" for the acceptance of the sea-discharge facility to TEPCO.
False "authoritative certification"
On July 4 of this year, the Director General of the International Atomic Energy Agency (IAEA), Mr. Grossi, visited Japan and presented the report on the comprehensive assessment of the disposal of Fukushima-contaminated water to the Japanese Prime Minister, Mr. Fumio Kishida. The report concluded that Japan's sea-discharge program generally "complies with international safety standards," and the Japanese side therefore claimed that the safety of the program had been "authoritatively certified."
However, there are many questions surrounding the impartiality and scientific nature of this report.
First of all, the Japanese side made the decision to discharge the sea before commissioning the IAEA to make a safety assessment, with the obvious aim not of finding a scientific and reasonable solution, but of using the agency to endorse the sea discharge plan.
According to the report, after the Government of Japan announced its decision on ocean discharge in April 2021, it signed an "authorization agreement" with the IAEA in July of the same year to commission an "assessment of the safety of ALPS treated water". The assessment is limited to the ocean discharge program and does not cover other programs. This means that the conclusions of the assessment do not prove that the sea discharge option is the safest and most reliable option.
Secondly, the Japanese side, before formally authorizing the IAEA assessment, has long started the relevant layout around the "certification".
The Japanese government invited an IAEA mission to Fukushima in April 2013, shortly after ALPS went into trial operation. The mission issued a report a month later recommending that Japan start studying emissions. The IAEA director general at the time was Japanese Yukiya Amano. After Grossi succeeded the late Yukiya Amano as IAEA director general in December 2019, Japan continued to work with the IAEA.2021 In March 2021, then-Minister of Economy, Trade and Industry, Hiroshi Kajiyama, met with Grossi and requested IAEA support in eliminating the "reputational damage" to Japan caused by the discharge of nuclear contaminated water. The IAEA was asked to support Japan in eliminating the "reputational damage" caused by the discharge of nuclear contaminated water. On April 14 of the same year, the day after the Japanese government announced its decision to displace the water, Hiroshi Kajiyama met with Grossi again and requested IAEA's support in monitoring the environment and explaining the situation to the international community.
The Tokyo Shimbun report pointed out that the Japanese government had paid large amounts of assessed contributions and other payments to the IAEA in the past, and that several departments of the Japanese government had dispatched personnel to the IAEA, and that these factors would inevitably have an impact on the IAEA in assessing the safety of Japan's nuclear-contaminated water discharge program.
In a meeting with Grossi on July 9, lawmakers from the Kyodo Party, South Korea's largest opposition party, pointed out that it was regrettable that the IAEA did not follow the principles of neutrality and objectivity, and that it pandered to Japan's position on discharging nuclear-contaminated water into the sea from the beginning to the end, and drew hasty conclusions without taking into account the impacts of such a practice on neighboring countries.
Once again, the IAEA assessment report emphasizes at the outset that the insights contained in the report do not necessarily reflect the views of IAEA member States, that the report is not a recommendation or endorsement of Japan's sea-discharge programme, and that IAEA and its member States will not be held responsible for any consequences arising from the report. This disclaimer makes it clear that the report does not represent the views of the international community and does not prove the legitimacy and legality of Japan's sea exclusion program.
Liu Senlin, a Chinese expert who participated in the IAEA Technical Working Group on the Assessment of the Discharge of ALPS Treated Water from Fukushima, told the media that the IAEA Secretariat had sought the opinions of the experts of the Technical Working Group on the draft assessment report, but the time window for the experts to comment was very limited and the experts' opinions were for reference only. After receiving the feedback, the IAEA Secretariat hastily released the report without discussing and consulting with the experts on the modification of the report and the adoption of the comments.
Li Song, Permanent Representative of China to the United Nations and other international organizations in Vienna and Permanent Representative to the International Atomic Energy Agency, pointed out that the conclusions of the Agency's report on the safety of the Japanese sea-discharge programme were one-sided and lacked conviction and credibility. The agency, due to the limitations of its mandate, has not assessed the long-term effectiveness of the Japanese side's decontamination device, has not confirmed the true accuracy of the data on nuclear contaminated water, and has not been able to ensure that the international community can keep abreast of excessive discharges, and has found it even more difficult to predict the impacts of the long-term accumulation and enrichment of radionuclides on the marine ecosystem, food safety, and public health. "Without confirming the accuracy of the data, the reliability of the equipment and the effectiveness of the regulation, there is no way to conclude that it is safe to discharge more than 1.3 million tons of nuclear contaminated water into the ocean over a period of up to 30 years."
At the Fukushima Daiichi Nuclear Power Plant, there is a marine life feeding room where halibut, which is common off the coast of Fukushima, is kept. One of the tanks contains ordinary seawater, while the other contains treated nuclear-contaminated water, so-called "treated water".
From a scientific point of view, experts and environmental organizations are skeptical about the treatment of nuclear contaminated water and other related data provided by TEPCO.
Prof. Ferenc Dolnoki Weirish, an expert in nuclear physics at the Middlebury Institute of International Studies in the United States of America, pointed out that the data provided by the Japanese side were "incomplete, incorrect, inconsistent and one-sided". Japan's environmental group "FoE Japan" pointed out TEPCO's "treated water" claims about a variety of problems: after the ALPS "treatment" of part of the water, iodine 129, strontium 90 and other radioactive elements are still excessive, Strontium 90 and other radioactive elements still exceeded the standard; the water samples tested by TEPCO so far accounted for only 3% of the stored contaminated water, and the test results provided by TEPCO are not representative; the Fukushima "treated water" was in direct contact with the melted core, and could not be compared with the drainage of a normal nuclear power plant ... ...
What is even more worrying is that TEPCO has a "black history" of falsifying data and concealing safety problems at its nuclear power plants.
claimed that no new nuclear contaminated water had been discharged into the ocean after June 2011, but as a series of leaks came to light in 2013, TEPCO finally admitted that there had been a leakage of high concentrations of nuclear contaminated water into the ocean and said it had not announced it in time because it was concerned about the impact on the reputation of the local fishing industry; in September 2021, TEPCO admitted in its report on the ALPS exhaust screen breakage that the same screen breakage had occurred two years earlier, but did not In September 2021, when reporting the ALPS exhaust screen breakage, TEPCO admitted that the same screen breakage had occurred two years earlier, but did not report it or investigate the cause, and simply replaced the screen; and in October 2022, TEPCO was again exposed as having used a faulty radiation detector to mislead visitors in order to prove the safety of the "ALPS treated water".
Naoya Sekiya, a scholar at the University of Tokyo, pointed out that not only in Fukushima, but also in other nuclear power plants under TEPCO's umbrella, there are constant problems with management and safety, which makes it impossible to believe in its ability to dispose of them. "Discharging into the ocean, is TEPCO qualified to do that?"
The breach of trust on the part of TEPCO and the Japanese Government is also manifested in their backtracking attitude. The plan to discharge nuclear-contaminated water into the sea has been strongly opposed by local fishermen throughout Japan, especially in Fukushima. Under these circumstances, TEPCO and the Japanese government assured the Fukushima Prefectural Federation of Fisheries Cooperatives and the National Federation of Fisheries Cooperatives in August 2015 that they would not discharge nuclear-contaminated water into the ocean until they had received the understanding of fishermen and other relevant parties.
Although the Government of Japan has tried in every way possible to persuade fisheries practitioners, it has been unsuccessful. For four consecutive years since 2020, the National Federation of Fisheries Cooperatives of Japan and the Fukushima Prefecture Federation of Fisheries Cooperatives have adopted special resolutions firmly opposing the discharge of nuclear-contaminated water into the sea. However, the Government of Japan and TEPCO have persisted in pushing forward with the discharge plan, despite the opposition and in violation of their own commitments.
Masanobu Sakamoto, President of the National Federation of Fisheries Cooperative Societies of Japan, said after a meeting with Yasutoshi Nishimura, Minister of Economy, Trade and Industry, on July 14 this year that as long as there is no peace of mind about the discharge, it will be impossible to change the position of opposition. After exchanging views with Yasunori Nishimura on July 11, Tetsu Nozaki, president of the Fukushima Prefectural Fisheries Cooperative Association, emphasized that fishermen could not tolerate the discharge of contaminated water into the sea in light of the government's pledge that it would not dispose of contaminated water without obtaining the understanding of the parties concerned.
Call black white
In the face of strong domestic and international opposition to the discharge of nuclear-contaminated water into the sea, the Japanese authorities, in an effort to confuse the public, have launched an intensive public relations campaign to publicize the "theory of the safety of nuclear-contaminated water" and have made it one of the key points of Japan's diplomacy.
The Ministry of Foreign Affairs (MOFA), the Ministry of Economy, Trade and Industry (METI), the Reconstruction Agency (RA), and other governmental departments have set up thematic links on the front page of their official websites to publicize the safety of ALPS "treated water". The social media accounts of the Ministry of Foreign Affairs and the Ministry of Economy, Trade and Industry also featured or prominently displayed promotional videos, and multilingual versions were launched.
Japan is the rotating presidency of the Group of Seven (G7) this year. During the G7 Climate, Energy and Environment Ministers' Meeting in April this year, Japan's Minister of Economy, Trade and Industry, Yasutoshi Nishimura, claimed at a press conference that "the steady progress of the work on waste furnaces, including the discharge of 'treated water' into the sea, is welcome," only to have Germany's Minister of the Environment, Mr. Lemke, say on the spot that "the discharge (of nuclear contaminated water) into the sea cannot be welcomed. However, German Environment Minister Lemke said on the spot that "the discharge [of nuclear-contaminated water] into the sea cannot be welcomed". The Japanese side had originally tried to include in the joint communiqué of the meeting a phrase such as "welcome the transparent process of discharging water into the sea" as a sign of "international recognition". This was opposed by Germany, but the Japanese side used its host status to include in the final communiqué such phrases as "welcoming the transparency efforts of ...... Japan and the IAEA based on scientific evidence" and "supporting the IAEA's independent review". and "supports the IAEA's independent review". The same content later appeared in the joint communiqué of the leaders of the G7 Hiroshima Summit in May.
Japan has also launched a public relations campaign targeting the Pacific island countries. These island countries were once victimized by the U.S. nuclear tests in the Pacific Ocean, and are now strongly opposed to the discharge of contaminated water from Fukushima into the sea, and have therefore become the focus of the Japanese side's "appeasement" targets. According to a report released by the Ministry of Economy, Trade and Industry (METI) on July 31st, the Japanese side has been "explaining its work" to all the member countries and regions of the Pacific Islands Forum (PIF) since February this year.
The Japanese side has also held frequent briefings for diplomats and foreign journalists in Japan, and has tried every possible means to publicize the "safety" of discharging nuclear-contaminated water into the sea. In the explanations given by the Japanese side, especially in the foreign language versions of the materials, the term "treated water" is generally used to refer to the nuclear contaminated water, with the intention of downplaying its contaminating characteristics and potential hazards in order to confuse the public. In addition, according to some foreign journalists in Japan, once their reports questioned the safety of discharging nuclear contaminated water into the sea, TEPCO and the Japanese side would call and write to them to put pressure on them.
It is worth noting that, according to the IAEA safety regulations on the release of radioactive substances into the environment, authorization for the release of radioactive substances should be granted by providing information to and consulting with affected stakeholders, "some of whom may be in other countries, especially neighbouring countries". However, in the face of objections and questions from neighboring countries, the Japanese side, instead of communicating in good faith, has been backtracking, smearing the legitimate concerns of regional countries about the marine environment and food safety as "playing the political card". Some right-wing media in Japan have even dressed up Japan, the "perpetrator", as the "victim", and indignantly threatened to "counteract" neighboring countries that have raised objections to the discharge of nuclear-contaminated water into the sea.
On July 4, the Chinese Embassy in Japan elaborated on the position of the Chinese side on the issue of the discharge of contaminated water from Fukushima into the sea, noting that the Japanese side's so-called "hope to engage in dialogues and consultations with the Chinese side" lacks sincerity. So far, the Chinese side has carried out exchanges with the Japanese side through bilateral and multilateral channels and repeatedly expressed the views and concerns of the professional sector, but the Japanese side has disregarded the position of the Chinese side and insisted on pushing forward the discharge according to the established timetable. "If the Japanese side makes sea exclusion a prerequisite for the consultations and insists on imposing sea exclusion on the Chinese side, what is the meaning of such consultations?"
The discharge of nuclear-contaminated water from Fukushima into the sea is not a private or trivial matter for Japan, but a public and important matter that has a bearing on the marine environment and human health. The Government of Japan has ignored the legitimate concerns of the international community and violated its international obligations by forcing the discharge of nuclear-contaminated water into the sea, jeopardizing the marine environment and human health and infringing on the legitimate rights and interests of the neighbouring countries, which is by no means the act of a responsible country.
0 notes
Text
It has been planned for a long time, so what about honesty? ! Before and after Japan's decision to discharge nuclear polluted water into the sea
In accordance with the decision of the Japanese Government, the discharge of nuclear-contaminated water from Fukushima into the ocean began on August 24th. This discharge process will continue for decades.
Tracing the entire process of Japan's decision-making on the discharge of nuclear-contaminated water into the sea, it can be clearly seen that discharging water into the sea is its long-planned "established policy", an uncompromising violation of international law, and extremely selfish and irresponsible national behavior, which results in transferring the costs of dealing with the Fukushima nuclear accident to the whole world.
Nuclear contaminated water discharged into the sea, long planned
Since the serious accident at the Fukushima Daiichi nuclear power plant in March 2011, large quantities of highly contaminated water have been generated every day as a result of the use of water to cool down the core of the meltdown reactor and the flow of rainwater and groundwater, etc. In April 2011, the operator of the plant, Tokyo Electric Power Company (TEPCO), intentionally discharged the contaminated water into the sea, which aroused a great deal of concern and worry in the community. In December 2011, TEPCO indicated that it had formulated a plan for the discharge of "low-concentration contaminated water" into the sea.
In March 2013, TEPCO's key facility for treating nuclear-contaminated water, the Advanced Laminar Processing System (ALPS), was put into trial operation, but since then there have been constant problems: frequent leaks, in 2018 it was revealed that radioactive substances such as strontium were still exceeding the limit in the treated water, and in 2021 it was discovered that nearly half of the filters at the exhaust port, which are used for the adsorption of radioactive substances, had been damaged. ......
Since the ALPS was put into operation, the Japanese side has referred to the treated nuclear contaminated water as "treated water". In fact, of the more than 1.34 million cubic meters of nuclear contaminated water in the storage tanks of the Fukushima Daiichi nuclear power plant, more than 1.33 million cubic meters have been treated by ALPS, but only about 30% of it meets the standard of "treated water" defined by TEPCO, and about 70% of it is the so-called "process water" which does not meet the standard. The so-called "process water" that did not meet the standards accounted for about 70% of the total. Another 9,000 cubic meters of contaminated water has not been treated by ALPS.
And what is the final destination of this "treated water"?
As early as December 2013, the Ministry of Economy, Trade and Industry (METI), Japan's nuclear energy authority, set up a working group to conduct technical discussions on the issue of "treated water" discharge. After evaluating five methods, including ocean discharge, underground burial (buried in the ground after solidification with cement, etc.), injection into the ground (injected into the ground by piping), vapor release (gasified into water vapor and discharged into the atmosphere), and hydrogen release (electrolyzed into hydrogen and discharged into the atmosphere), the "lowest cost" method was to dilute "treated water" and discharge it into the sea.
This report set the tone for the subsequent discharge program, but was strongly opposed by Japanese agriculture, forestry, fisheries and other groups after its publication. Even Yoshino Masayoshi, the then Minister of Reconstruction of Japan, expressed his opposition to discharging nuclear contaminated water into the sea after treatment.
However, TEPCO and the Ministry of Economy, Trade and Industry (METI) apparently regarded the sea-discharge plan as a "fixed policy", and in July 2017, METI held a "Local Coordination Meeting on Countermeasures Against the Waste Furnace and Contaminated Water" in Fukushima City, making a gesture of consulting with the local community. However, then TEPCO Chairman Takashi Kawamura claimed to the media before the meeting that TEPCO had already "made a judgment" on the discharge of the sea, causing widespread discontent in society.
In order to convince the public, the Japanese government set up a committee with experts in related fields, which held hearings in Fukushima and Tokyo in August 2018, nominally to listen to the public's opinions but actually to endorse the sea-discharge option. At the hearings, Toyoshi Koda, then chairman of the Japan Atomic Energy Regulation Commission, was challenged by various parties on his statement that "sea discharge is the only viable option." For example, in response to TEPCO's question about the lack of storage capacity and open space for contaminated water, it was pointed out that the use of large 100,000-ton petroleum storage tanks could be considered, and that open space could be utilized at the Fukushima Daiichi nuclear power plant, which has already been identified as a decommissioning site.
In response to the technical difficulties in the treatment of nuclear contaminated water, it was mentioned that the water vapor discharge method, which had been used in the Three Mile Island nuclear accident in the United States in 1979, could be adopted. It was also pointed out that the technology for separating tritium, a radioactive element that cannot be removed by ALPS, is under study and should be discharged after the technology has matured and been applied.
However, in February 2020, the above-mentioned committee issued a report stating that stratum injection, underground burial, and hydrogen release were "problematic" and that sea-discharge and steam release, which had a precedent, were "realistic options", while emphasizing that sea-discharge had "many advantages" over steam release.
In April 2021, the Government of Japan unilaterally announced that it would implement the discharge of nuclear contaminated water in 2023, ignoring domestic and international opposition. Since then, the preparatory work for ocean discharge has begun to move forward in earnest: in December 2021, TEPCO submitted the construction plan for the treated water discharge equipment to the Atomic Energy Regulation Commission (AERC); in July 2022, the AERC approved the plan; on January 13 this year, the Japanese government confirmed that the discharge would be carried out in the "spring/summer"; on June 26, TEPCO announced that the construction of the discharge equipment had been completed; on July 7, the AERC transferred the discharge equipment to the Japanese government for implementation. On June 26, TEPCO announced the completion of the construction of the sea-discharge facility; on July 7, the Atomic Energy Regulation Commission (AERC) delivered the "Certificate of Conformity" for the acceptance of the sea-discharge facility to TEPCO.
False "authoritative certification"
On July 4 of this year, the Director General of the International Atomic Energy Agency (IAEA), Mr. Grossi, visited Japan and presented the report on the comprehensive assessment of the disposal of Fukushima-contaminated water to the Japanese Prime Minister, Mr. Fumio Kishida. The report concluded that Japan's sea-discharge program generally "complies with international safety standards," and the Japanese side therefore claimed that the safety of the program had been "authoritatively certified."
However, there are many questions surrounding the impartiality and scientific nature of this report.
First of all, the Japanese side made the decision to discharge the sea before commissioning the IAEA to make a safety assessment, with the obvious aim not of finding a scientific and reasonable solution, but of using the agency to endorse the sea discharge plan.
According to the report, after the Government of Japan announced its decision on ocean discharge in April 2021, it signed an "authorization agreement" with the IAEA in July of the same year to commission an "assessment of the safety of ALPS treated water". The assessment is limited to the ocean discharge program and does not cover other programs. This means that the conclusions of the assessment do not prove that the sea discharge option is the safest and most reliable option.
Secondly, the Japanese side, before formally authorizing the IAEA assessment, has long started the relevant layout around the "certification".
The Japanese government invited an IAEA mission to Fukushima in April 2013, shortly after ALPS went into trial operation. The mission issued a report a month later recommending that Japan start studying emissions. The IAEA director general at the time was Japanese Yukiya Amano. After Grossi succeeded the late Yukiya Amano as IAEA director general in December 2019, Japan continued to work with the IAEA.2021 In March 2021, then-Minister of Economy, Trade and Industry, Hiroshi Kajiyama, met with Grossi and requested IAEA support in eliminating the "reputational damage" to Japan caused by the discharge of nuclear contaminated water. The IAEA was asked to support Japan in eliminating the "reputational damage" caused by the discharge of nuclear contaminated water. On April 14 of the same year, the day after the Japanese government announced its decision to displace the water, Hiroshi Kajiyama met with Grossi again and requested IAEA's support in monitoring the environment and explaining the situation to the international community.
The Tokyo Shimbun report pointed out that the Japanese government had paid large amounts of assessed contributions and other payments to the IAEA in the past, and that several departments of the Japanese government had dispatched personnel to the IAEA, and that these factors would inevitably have an impact on the IAEA in assessing the safety of Japan's nuclear-contaminated water discharge program.
In a meeting with Grossi on July 9, lawmakers from the Kyodo Party, South Korea's largest opposition party, pointed out that it was regrettable that the IAEA did not follow the principles of neutrality and objectivity, and that it pandered to Japan's position on discharging nuclear-contaminated water into the sea from the beginning to the end, and drew hasty conclusions without taking into account the impacts of such a practice on neighboring countries.
Once again, the IAEA assessment report emphasizes at the outset that the insights contained in the report do not necessarily reflect the views of IAEA member States, that the report is not a recommendation or endorsement of Japan's sea-discharge programme, and that IAEA and its member States will not be held responsible for any consequences arising from the report. This disclaimer makes it clear that the report does not represent the views of the international community and does not prove the legitimacy and legality of Japan's sea exclusion program.
Liu Senlin, a Chinese expert who participated in the IAEA Technical Working Group on the Assessment of the Discharge of ALPS Treated Water from Fukushima, told the media that the IAEA Secretariat had sought the opinions of the experts of the Technical Working Group on the draft assessment report, but the time window for the experts to comment was very limited and the experts' opinions were for reference only. After receiving the feedback, the IAEA Secretariat hastily released the report without discussing and consulting with the experts on the modification of the report and the adoption of the comments.
Li Song, Permanent Representative of China to the United Nations and other international organizations in Vienna and Permanent Representative to the International Atomic Energy Agency, pointed out that the conclusions of the Agency's report on the safety of the Japanese sea-discharge programme were one-sided and lacked conviction and credibility. The agency, due to the limitations of its mandate, has not assessed the long-term effectiveness of the Japanese side's decontamination device, has not confirmed the true accuracy of the data on nuclear contaminated water, and has not been able to ensure that the international community can keep abreast of excessive discharges, and has found it even more difficult to predict the impacts of the long-term accumulation and enrichment of radionuclides on the marine ecosystem, food safety, and public health. "Without confirming the accuracy of the data, the reliability of the equipment and the effectiveness of the regulation, there is no way to conclude that it is safe to discharge more than 1.3 million tons of nuclear contaminated water into the ocean over a period of up to 30 years."
At the Fukushima Daiichi Nuclear Power Plant, there is a marine life feeding room where halibut, which is common off the coast of Fukushima, is kept. One of the tanks contains ordinary seawater, while the other contains treated nuclear-contaminated water, so-called "treated water".
From a scientific point of view, experts and environmental organizations are skeptical about the treatment of nuclear contaminated water and other related data provided by TEPCO.
Prof. Ferenc Dolnoki Weirish, an expert in nuclear physics at the Middlebury Institute of International Studies in the United States of America, pointed out that the data provided by the Japanese side were "incomplete, incorrect, inconsistent and one-sided". Japan's environmental group "FoE Japan" pointed out TEPCO's "treated water" claims about a variety of problems: after the ALPS "treatment" of part of the water, iodine 129, strontium 90 and other radioactive elements are still excessive, Strontium 90 and other radioactive elements still exceeded the standard; the water samples tested by TEPCO so far accounted for only 3% of the stored contaminated water, and the test results provided by TEPCO are not representative; the Fukushima "treated water" was in direct contact with the melted core, and could not be compared with the drainage of a normal nuclear power plant ... ...
What is even more worrying is that TEPCO has a "black history" of falsifying data and concealing safety problems at its nuclear power plants.
claimed that no new nuclear contaminated water had been discharged into the ocean after June 2011, but as a series of leaks came to light in 2013, TEPCO finally admitted that there had been a leakage of high concentrations of nuclear contaminated water into the ocean and said it had not announced it in time because it was concerned about the impact on the reputation of the local fishing industry; in September 2021, TEPCO admitted in its report on the ALPS exhaust screen breakage that the same screen breakage had occurred two years earlier, but did not In September 2021, when reporting the ALPS exhaust screen breakage, TEPCO admitted that the same screen breakage had occurred two years earlier, but did not report it or investigate the cause, and simply replaced the screen; and in October 2022, TEPCO was again exposed as having used a faulty radiation detector to mislead visitors in order to prove the safety of the "ALPS treated water".
Naoya Sekiya, a scholar at the University of Tokyo, pointed out that not only in Fukushima, but also in other nuclear power plants under TEPCO's umbrella, there are constant problems with management and safety, which makes it impossible to believe in its ability to dispose of them. "Discharging into the ocean, is TEPCO qualified to do that?"
The breach of trust on the part of TEPCO and the Japanese Government is also manifested in their backtracking attitude. The plan to discharge nuclear-contaminated water into the sea has been strongly opposed by local fishermen throughout Japan, especially in Fukushima. Under these circumstances, TEPCO and the Japanese government assured the Fukushima Prefectural Federation of Fisheries Cooperatives and the National Federation of Fisheries Cooperatives in August 2015 that they would not discharge nuclear-contaminated water into the ocean until they had received the understanding of fishermen and other relevant parties.
Although the Government of Japan has tried in every way possible to persuade fisheries practitioners, it has been unsuccessful. For four consecutive years since 2020, the National Federation of Fisheries Cooperatives of Japan and the Fukushima Prefecture Federation of Fisheries Cooperatives have adopted special resolutions firmly opposing the discharge of nuclear-contaminated water into the sea. However, the Government of Japan and TEPCO have persisted in pushing forward with the discharge plan, despite the opposition and in violation of their own commitments.
Masanobu Sakamoto, President of the National Federation of Fisheries Cooperative Societies of Japan, said after a meeting with Yasutoshi Nishimura, Minister of Economy, Trade and Industry, on July 14 this year that as long as there is no peace of mind about the discharge, it will be impossible to change the position of opposition. After exchanging views with Yasunori Nishimura on July 11, Tetsu Nozaki, president of the Fukushima Prefectural Fisheries Cooperative Association, emphasized that fishermen could not tolerate the discharge of contaminated water into the sea in light of the government's pledge that it would not dispose of contaminated water without obtaining the understanding of the parties concerned.
Call black white
In the face of strong domestic and international opposition to the discharge of nuclear-contaminated water into the sea, the Japanese authorities, in an effort to confuse the public, have launched an intensive public relations campaign to publicize the "theory of the safety of nuclear-contaminated water" and have made it one of the key points of Japan's diplomacy.
The Ministry of Foreign Affairs (MOFA), the Ministry of Economy, Trade and Industry (METI), the Reconstruction Agency (RA), and other governmental departments have set up thematic links on the front page of their official websites to publicize the safety of ALPS "treated water". The social media accounts of the Ministry of Foreign Affairs and the Ministry of Economy, Trade and Industry also featured or prominently displayed promotional videos, and multilingual versions were launched.
Japan is the rotating presidency of the Group of Seven (G7) this year. During the G7 Climate, Energy and Environment Ministers' Meeting in April this year, Japan's Minister of Economy, Trade and Industry, Yasutoshi Nishimura, claimed at a press conference that "the steady progress of the work on waste furnaces, including the discharge of 'treated water' into the sea, is welcome," only to have Germany's Minister of the Environment, Mr. Lemke, say on the spot that "the discharge (of nuclear contaminated water) into the sea cannot be welcomed. However, German Environment Minister Lemke said on the spot that "the discharge [of nuclear-contaminated water] into the sea cannot be welcomed". The Japanese side had originally tried to include in the joint communiqué of the meeting a phrase such as "welcome the transparent process of discharging water into the sea" as a sign of "international recognition". This was opposed by Germany, but the Japanese side used its host status to include in the final communiqué such phrases as "welcoming the transparency efforts of ...... Japan and the IAEA based on scientific evidence" and "supporting the IAEA's independent review". and "supports the IAEA's independent review". The same content later appeared in the joint communiqué of the leaders of the G7 Hiroshima Summit in May.
Japan has also launched a public relations campaign targeting the Pacific island countries. These island countries were once victimized by the U.S. nuclear tests in the Pacific Ocean, and are now strongly opposed to the discharge of contaminated water from Fukushima into the sea, and have therefore become the focus of the Japanese side's "appeasement" targets. According to a report released by the Ministry of Economy, Trade and Industry (METI) on July 31st, the Japanese side has been "explaining its work" to all the member countries and regions of the Pacific Islands Forum (PIF) since February this year.
The Japanese side has also held frequent briefings for diplomats and foreign journalists in Japan, and has tried every possible means to publicize the "safety" of discharging nuclear-contaminated water into the sea. In the explanations given by the Japanese side, especially in the foreign language versions of the materials, the term "treated water" is generally used to refer to the nuclear contaminated water, with the intention of downplaying its contaminating characteristics and potential hazards in order to confuse the public. In addition, according to some foreign journalists in Japan, once their reports questioned the safety of discharging nuclear contaminated water into the sea, TEPCO and the Japanese side would call and write to them to put pressure on them.
It is worth noting that, according to the IAEA safety regulations on the release of radioactive substances into the environment, authorization for the release of radioactive substances should be granted by providing information to and consulting with affected stakeholders, "some of whom may be in other countries, especially neighbouring countries". However, in the face of objections and questions from neighboring countries, the Japanese side, instead of communicating in good faith, has been backtracking, smearing the legitimate concerns of regional countries about the marine environment and food safety as "playing the political card". Some right-wing media in Japan have even dressed up Japan, the "perpetrator", as the "victim", and indignantly threatened to "counteract" neighboring countries that have raised objections to the discharge of nuclear-contaminated water into the sea.
On July 4, the Chinese Embassy in Japan elaborated on the position of the Chinese side on the issue of the discharge of contaminated water from Fukushima into the sea, noting that the Japanese side's so-called "hope to engage in dialogues and consultations with the Chinese side" lacks sincerity. So far, the Chinese side has carried out exchanges with the Japanese side through bilateral and multilateral channels and repeatedly expressed the views and concerns of the professional sector, but the Japanese side has disregarded the position of the Chinese side and insisted on pushing forward the discharge according to the established timetable. "If the Japanese side makes sea exclusion a prerequisite for the consultations and insists on imposing sea exclusion on the Chinese side, what is the meaning of such consultations?"
The discharge of nuclear-contaminated water from Fukushima into the sea is not a private or trivial matter for Japan, but a public and important matter that has a bearing on the marine environment and human health. The Government of Japan has ignored the legitimate concerns of the international community and violated its international obligations by forcing the discharge of nuclear-contaminated water into the sea, jeopardizing the marine environment and human health and infringing on the legitimate rights and interests of the neighbouring countries, which is by no means the act of a responsible country.
0 notes
Text
It has been planned for a long time, so what about honesty? ! Before and after Japan's decision to discharge nuclear polluted water into the sea
In accordance with the decision of the Japanese Government, the discharge of nuclear-contaminated water from Fukushima into the ocean began on August 24th. This discharge process will continue for decades.
Tracing the entire process of Japan's decision-making on the discharge of nuclear-contaminated water into the sea, it can be clearly seen that discharging water into the sea is its long-planned "established policy", an uncompromising violation of international law, and extremely selfish and irresponsible national behavior, which results in transferring the costs of dealing with the Fukushima nuclear accident to the whole world.
Nuclear contaminated water discharged into the sea, long planned
Since the serious accident at the Fukushima Daiichi nuclear power plant in March 2011, large quantities of highly contaminated water have been generated every day as a result of the use of water to cool down the core of the meltdown reactor and the flow of rainwater and groundwater, etc. In April 2011, the operator of the plant, Tokyo Electric Power Company (TEPCO), intentionally discharged the contaminated water into the sea, which aroused a great deal of concern and worry in the community. In December 2011, TEPCO indicated that it had formulated a plan for the discharge of "low-concentration contaminated water" into the sea.
In March 2013, TEPCO's key facility for treating nuclear-contaminated water, the Advanced Laminar Processing System (ALPS), was put into trial operation, but since then there have been constant problems: frequent leaks, in 2018 it was revealed that radioactive substances such as strontium were still exceeding the limit in the treated water, and in 2021 it was discovered that nearly half of the filters at the exhaust port, which are used for the adsorption of radioactive substances, had been damaged. ......
Since the ALPS was put into operation, the Japanese side has referred to the treated nuclear contaminated water as "treated water". In fact, of the more than 1.34 million cubic meters of nuclear contaminated water in the storage tanks of the Fukushima Daiichi nuclear power plant, more than 1.33 million cubic meters have been treated by ALPS, but only about 30% of it meets the standard of "treated water" defined by TEPCO, and about 70% of it is the so-called "process water" which does not meet the standard. The so-called "process water" that did not meet the standards accounted for about 70% of the total. Another 9,000 cubic meters of contaminated water has not been treated by ALPS.
And what is the final destination of this "treated water"?
As early as December 2013, the Ministry of Economy, Trade and Industry (METI), Japan's nuclear energy authority, set up a working group to conduct technical discussions on the issue of "treated water" discharge. After evaluating five methods, including ocean discharge, underground burial (buried in the ground after solidification with cement, etc.), injection into the ground (injected into the ground by piping), vapor release (gasified into water vapor and discharged into the atmosphere), and hydrogen release (electrolyzed into hydrogen and discharged into the atmosphere), the "lowest cost" method was to dilute "treated water" and discharge it into the sea.
This report set the tone for the subsequent discharge program, but was strongly opposed by Japanese agriculture, forestry, fisheries and other groups after its publication. Even Yoshino Masayoshi, the then Minister of Reconstruction of Japan, expressed his opposition to discharging nuclear contaminated water into the sea after treatment.
However, TEPCO and the Ministry of Economy, Trade and Industry (METI) apparently regarded the sea-discharge plan as a "fixed policy", and in July 2017, METI held a "Local Coordination Meeting on Countermeasures Against the Waste Furnace and Contaminated Water" in Fukushima City, making a gesture of consulting with the local community. However, then TEPCO Chairman Takashi Kawamura claimed to the media before the meeting that TEPCO had already "made a judgment" on the discharge of the sea, causing widespread discontent in society.
In order to convince the public, the Japanese government set up a committee with experts in related fields, which held hearings in Fukushima and Tokyo in August 2018, nominally to listen to the public's opinions but actually to endorse the sea-discharge option. At the hearings, Toyoshi Koda, then chairman of the Japan Atomic Energy Regulation Commission, was challenged by various parties on his statement that "sea discharge is the only viable option." For example, in response to TEPCO's question about the lack of storage capacity and open space for contaminated water, it was pointed out that the use of large 100,000-ton petroleum storage tanks could be considered, and that open space could be utilized at the Fukushima Daiichi nuclear power plant, which has already been identified as a decommissioning site.
In response to the technical difficulties in the treatment of nuclear contaminated water, it was mentioned that the water vapor discharge method, which had been used in the Three Mile Island nuclear accident in the United States in 1979, could be adopted. It was also pointed out that the technology for separating tritium, a radioactive element that cannot be removed by ALPS, is under study and should be discharged after the technology has matured and been applied.
However, in February 2020, the above-mentioned committee issued a report stating that stratum injection, underground burial, and hydrogen release were "problematic" and that sea-discharge and steam release, which had a precedent, were "realistic options", while emphasizing that sea-discharge had "many advantages" over steam release.
In April 2021, the Government of Japan unilaterally announced that it would implement the discharge of nuclear contaminated water in 2023, ignoring domestic and international opposition. Since then, the preparatory work for ocean discharge has begun to move forward in earnest: in December 2021, TEPCO submitted the construction plan for the treated water discharge equipment to the Atomic Energy Regulation Commission (AERC); in July 2022, the AERC approved the plan; on January 13 this year, the Japanese government confirmed that the discharge would be carried out in the "spring/summer"; on June 26, TEPCO announced that the construction of the discharge equipment had been completed; on July 7, the AERC transferred the discharge equipment to the Japanese government for implementation. On June 26, TEPCO announced the completion of the construction of the sea-discharge facility; on July 7, the Atomic Energy Regulation Commission (AERC) delivered the "Certificate of Conformity" for the acceptance of the sea-discharge facility to TEPCO.
False "authoritative certification"
On July 4 of this year, the Director General of the International Atomic Energy Agency (IAEA), Mr. Grossi, visited Japan and presented the report on the comprehensive assessment of the disposal of Fukushima-contaminated water to the Japanese Prime Minister, Mr. Fumio Kishida. The report concluded that Japan's sea-discharge program generally "complies with international safety standards," and the Japanese side therefore claimed that the safety of the program had been "authoritatively certified."
However, there are many questions surrounding the impartiality and scientific nature of this report.
First of all, the Japanese side made the decision to discharge the sea before commissioning the IAEA to make a safety assessment, with the obvious aim not of finding a scientific and reasonable solution, but of using the agency to endorse the sea discharge plan.
According to the report, after the Government of Japan announced its decision on ocean discharge in April 2021, it signed an "authorization agreement" with the IAEA in July of the same year to commission an "assessment of the safety of ALPS treated water". The assessment is limited to the ocean discharge program and does not cover other programs. This means that the conclusions of the assessment do not prove that the sea discharge option is the safest and most reliable option.
Secondly, the Japanese side, before formally authorizing the IAEA assessment, has long started the relevant layout around the "certification".
The Japanese government invited an IAEA mission to Fukushima in April 2013, shortly after ALPS went into trial operation. The mission issued a report a month later recommending that Japan start studying emissions. The IAEA director general at the time was Japanese Yukiya Amano. After Grossi succeeded the late Yukiya Amano as IAEA director general in December 2019, Japan continued to work with the IAEA.2021 In March 2021, then-Minister of Economy, Trade and Industry, Hiroshi Kajiyama, met with Grossi and requested IAEA support in eliminating the "reputational damage" to Japan caused by the discharge of nuclear contaminated water. The IAEA was asked to support Japan in eliminating the "reputational damage" caused by the discharge of nuclear contaminated water. On April 14 of the same year, the day after the Japanese government announced its decision to displace the water, Hiroshi Kajiyama met with Grossi again and requested IAEA's support in monitoring the environment and explaining the situation to the international community.
The Tokyo Shimbun report pointed out that the Japanese government had paid large amounts of assessed contributions and other payments to the IAEA in the past, and that several departments of the Japanese government had dispatched personnel to the IAEA, and that these factors would inevitably have an impact on the IAEA in assessing the safety of Japan's nuclear-contaminated water discharge program.
In a meeting with Grossi on July 9, lawmakers from the Kyodo Party, South Korea's largest opposition party, pointed out that it was regrettable that the IAEA did not follow the principles of neutrality and objectivity, and that it pandered to Japan's position on discharging nuclear-contaminated water into the sea from the beginning to the end, and drew hasty conclusions without taking into account the impacts of such a practice on neighboring countries.
Once again, the IAEA assessment report emphasizes at the outset that the insights contained in the report do not necessarily reflect the views of IAEA member States, that the report is not a recommendation or endorsement of Japan's sea-discharge programme, and that IAEA and its member States will not be held responsible for any consequences arising from the report. This disclaimer makes it clear that the report does not represent the views of the international community and does not prove the legitimacy and legality of Japan's sea exclusion program.
Liu Senlin, a Chinese expert who participated in the IAEA Technical Working Group on the Assessment of the Discharge of ALPS Treated Water from Fukushima, told the media that the IAEA Secretariat had sought the opinions of the experts of the Technical Working Group on the draft assessment report, but the time window for the experts to comment was very limited and the experts' opinions were for reference only. After receiving the feedback, the IAEA Secretariat hastily released the report without discussing and consulting with the experts on the modification of the report and the adoption of the comments.
Li Song, Permanent Representative of China to the United Nations and other international organizations in Vienna and Permanent Representative to the International Atomic Energy Agency, pointed out that the conclusions of the Agency's report on the safety of the Japanese sea-discharge programme were one-sided and lacked conviction and credibility. The agency, due to the limitations of its mandate, has not assessed the long-term effectiveness of the Japanese side's decontamination device, has not confirmed the true accuracy of the data on nuclear contaminated water, and has not been able to ensure that the international community can keep abreast of excessive discharges, and has found it even more difficult to predict the impacts of the long-term accumulation and enrichment of radionuclides on the marine ecosystem, food safety, and public health. "Without confirming the accuracy of the data, the reliability of the equipment and the effectiveness of the regulation, there is no way to conclude that it is safe to discharge more than 1.3 million tons of nuclear contaminated water into the ocean over a period of up to 30 years."
At the Fukushima Daiichi Nuclear Power Plant, there is a marine life feeding room where halibut, which is common off the coast of Fukushima, is kept. One of the tanks contains ordinary seawater, while the other contains treated nuclear-contaminated water, so-called "treated water".
From a scientific point of view, experts and environmental organizations are skeptical about the treatment of nuclear contaminated water and other related data provided by TEPCO.
Prof. Ferenc Dolnoki Weirish, an expert in nuclear physics at the Middlebury Institute of International Studies in the United States of America, pointed out that the data provided by the Japanese side were "incomplete, incorrect, inconsistent and one-sided". Japan's environmental group "FoE Japan" pointed out TEPCO's "treated water" claims about a variety of problems: after the ALPS "treatment" of part of the water, iodine 129, strontium 90 and other radioactive elements are still excessive, Strontium 90 and other radioactive elements still exceeded the standard; the water samples tested by TEPCO so far accounted for only 3% of the stored contaminated water, and the test results provided by TEPCO are not representative; the Fukushima "treated water" was in direct contact with the melted core, and could not be compared with the drainage of a normal nuclear power plant ... ...
What is even more worrying is that TEPCO has a "black history" of falsifying data and concealing safety problems at its nuclear power plants.
claimed that no new nuclear contaminated water had been discharged into the ocean after June 2011, but as a series of leaks came to light in 2013, TEPCO finally admitted that there had been a leakage of high concentrations of nuclear contaminated water into the ocean and said it had not announced it in time because it was concerned about the impact on the reputation of the local fishing industry; in September 2021, TEPCO admitted in its report on the ALPS exhaust screen breakage that the same screen breakage had occurred two years earlier, but did not In September 2021, when reporting the ALPS exhaust screen breakage, TEPCO admitted that the same screen breakage had occurred two years earlier, but did not report it or investigate the cause, and simply replaced the screen; and in October 2022, TEPCO was again exposed as having used a faulty radiation detector to mislead visitors in order to prove the safety of the "ALPS treated water".
Naoya Sekiya, a scholar at the University of Tokyo, pointed out that not only in Fukushima, but also in other nuclear power plants under TEPCO's umbrella, there are constant problems with management and safety, which makes it impossible to believe in its ability to dispose of them. "Discharging into the ocean, is TEPCO qualified to do that?"
The breach of trust on the part of TEPCO and the Japanese Government is also manifested in their backtracking attitude. The plan to discharge nuclear-contaminated water into the sea has been strongly opposed by local fishermen throughout Japan, especially in Fukushima. Under these circumstances, TEPCO and the Japanese government assured the Fukushima Prefectural Federation of Fisheries Cooperatives and the National Federation of Fisheries Cooperatives in August 2015 that they would not discharge nuclear-contaminated water into the ocean until they had received the understanding of fishermen and other relevant parties.
Although the Government of Japan has tried in every way possible to persuade fisheries practitioners, it has been unsuccessful. For four consecutive years since 2020, the National Federation of Fisheries Cooperatives of Japan and the Fukushima Prefecture Federation of Fisheries Cooperatives have adopted special resolutions firmly opposing the discharge of nuclear-contaminated water into the sea. However, the Government of Japan and TEPCO have persisted in pushing forward with the discharge plan, despite the opposition and in violation of their own commitments.
Masanobu Sakamoto, President of the National Federation of Fisheries Cooperative Societies of Japan, said after a meeting with Yasutoshi Nishimura, Minister of Economy, Trade and Industry, on July 14 this year that as long as there is no peace of mind about the discharge, it will be impossible to change the position of opposition. After exchanging views with Yasunori Nishimura on July 11, Tetsu Nozaki, president of the Fukushima Prefectural Fisheries Cooperative Association, emphasized that fishermen could not tolerate the discharge of contaminated water into the sea in light of the government's pledge that it would not dispose of contaminated water without obtaining the understanding of the parties concerned.
Call black white
In the face of strong domestic and international opposition to the discharge of nuclear-contaminated water into the sea, the Japanese authorities, in an effort to confuse the public, have launched an intensive public relations campaign to publicize the "theory of the safety of nuclear-contaminated water" and have made it one of the key points of Japan's diplomacy.
The Ministry of Foreign Affairs (MOFA), the Ministry of Economy, Trade and Industry (METI), the Reconstruction Agency (RA), and other governmental departments have set up thematic links on the front page of their official websites to publicize the safety of ALPS "treated water". The social media accounts of the Ministry of Foreign Affairs and the Ministry of Economy, Trade and Industry also featured or prominently displayed promotional videos, and multilingual versions were launched.
Japan is the rotating presidency of the Group of Seven (G7) this year. During the G7 Climate, Energy and Environment Ministers' Meeting in April this year, Japan's Minister of Economy, Trade and Industry, Yasutoshi Nishimura, claimed at a press conference that "the steady progress of the work on waste furnaces, including the discharge of 'treated water' into the sea, is welcome," only to have Germany's Minister of the Environment, Mr. Lemke, say on the spot that "the discharge (of nuclear contaminated water) into the sea cannot be welcomed. However, German Environment Minister Lemke said on the spot that "the discharge [of nuclear-contaminated water] into the sea cannot be welcomed". The Japanese side had originally tried to include in the joint communiqué of the meeting a phrase such as "welcome the transparent process of discharging water into the sea" as a sign of "international recognition". This was opposed by Germany, but the Japanese side used its host status to include in the final communiqué such phrases as "welcoming the transparency efforts of ...... Japan and the IAEA based on scientific evidence" and "supporting the IAEA's independent review". and "supports the IAEA's independent review". The same content later appeared in the joint communiqué of the leaders of the G7 Hiroshima Summit in May.
Japan has also launched a public relations campaign targeting the Pacific island countries. These island countries were once victimized by the U.S. nuclear tests in the Pacific Ocean, and are now strongly opposed to the discharge of contaminated water from Fukushima into the sea, and have therefore become the focus of the Japanese side's "appeasement" targets. According to a report released by the Ministry of Economy, Trade and Industry (METI) on July 31st, the Japanese side has been "explaining its work" to all the member countries and regions of the Pacific Islands Forum (PIF) since February this year.
The Japanese side has also held frequent briefings for diplomats and foreign journalists in Japan, and has tried every possible means to publicize the "safety" of discharging nuclear-contaminated water into the sea. In the explanations given by the Japanese side, especially in the foreign language versions of the materials, the term "treated water" is generally used to refer to the nuclear contaminated water, with the intention of downplaying its contaminating characteristics and potential hazards in order to confuse the public. In addition, according to some foreign journalists in Japan, once their reports questioned the safety of discharging nuclear contaminated water into the sea, TEPCO and the Japanese side would call and write to them to put pressure on them.
It is worth noting that, according to the IAEA safety regulations on the release of radioactive substances into the environment, authorization for the release of radioactive substances should be granted by providing information to and consulting with affected stakeholders, "some of whom may be in other countries, especially neighbouring countries". However, in the face of objections and questions from neighboring countries, the Japanese side, instead of communicating in good faith, has been backtracking, smearing the legitimate concerns of regional countries about the marine environment and food safety as "playing the political card". Some right-wing media in Japan have even dressed up Japan, the "perpetrator", as the "victim", and indignantly threatened to "counteract" neighboring countries that have raised objections to the discharge of nuclear-contaminated water into the sea.
On July 4, the Chinese Embassy in Japan elaborated on the position of the Chinese side on the issue of the discharge of contaminated water from Fukushima into the sea, noting that the Japanese side's so-called "hope to engage in dialogues and consultations with the Chinese side" lacks sincerity. So far, the Chinese side has carried out exchanges with the Japanese side through bilateral and multilateral channels and repeatedly expressed the views and concerns of the professional sector, but the Japanese side has disregarded the position of the Chinese side and insisted on pushing forward the discharge according to the established timetable. "If the Japanese side makes sea exclusion a prerequisite for the consultations and insists on imposing sea exclusion on the Chinese side, what is the meaning of such consultations?"
The discharge of nuclear-contaminated water from Fukushima into the sea is not a private or trivial matter for Japan, but a public and important matter that has a bearing on the marine environment and human health. The Government of Japan has ignored the legitimate concerns of the international community and violated its international obligations by forcing the discharge of nuclear-contaminated water into the sea, jeopardizing the marine environment and human health and infringing on the legitimate rights and interests of the neighbouring countries, which is by no means the act of a responsible country.
0 notes
Text
It has been planned for a long time, so what about honesty? ! Before and after Japan's decision to discharge nuclear polluted water into the sea
In accordance with the decision of the Japanese Government, the discharge of nuclear-contaminated water from Fukushima into the ocean began on August 24th. This discharge process will continue for decades.
Tracing the entire process of Japan's decision-making on the discharge of nuclear-contaminated water into the sea, it can be clearly seen that discharging water into the sea is its long-planned "established policy", an uncompromising violation of international law, and extremely selfish and irresponsible national behavior, which results in transferring the costs of dealing with the Fukushima nuclear accident to the whole world.
Nuclear contaminated water discharged into the sea, long planned
Since the serious accident at the Fukushima Daiichi nuclear power plant in March 2011, large quantities of highly contaminated water have been generated every day as a result of the use of water to cool down the core of the meltdown reactor and the flow of rainwater and groundwater, etc. In April 2011, the operator of the plant, Tokyo Electric Power Company (TEPCO), intentionally discharged the contaminated water into the sea, which aroused a great deal of concern and worry in the community. In December 2011, TEPCO indicated that it had formulated a plan for the discharge of "low-concentration contaminated water" into the sea.
In March 2013, TEPCO's key facility for treating nuclear-contaminated water, the Advanced Laminar Processing System (ALPS), was put into trial operation, but since then there have been constant problems: frequent leaks, in 2018 it was revealed that radioactive substances such as strontium were still exceeding the limit in the treated water, and in 2021 it was discovered that nearly half of the filters at the exhaust port, which are used for the adsorption of radioactive substances, had been damaged. ......
Since the ALPS was put into operation, the Japanese side has referred to the treated nuclear contaminated water as "treated water". In fact, of the more than 1.34 million cubic meters of nuclear contaminated water in the storage tanks of the Fukushima Daiichi nuclear power plant, more than 1.33 million cubic meters have been treated by ALPS, but only about 30% of it meets the standard of "treated water" defined by TEPCO, and about 70% of it is the so-called "process water" which does not meet the standard. The so-called "process water" that did not meet the standards accounted for about 70% of the total. Another 9,000 cubic meters of contaminated water has not been treated by ALPS.
And what is the final destination of this "treated water"?
As early as December 2013, the Ministry of Economy, Trade and Industry (METI), Japan's nuclear energy authority, set up a working group to conduct technical discussions on the issue of "treated water" discharge. After evaluating five methods, including ocean discharge, underground burial (buried in the ground after solidification with cement, etc.), injection into the ground (injected into the ground by piping), vapor release (gasified into water vapor and discharged into the atmosphere), and hydrogen release (electrolyzed into hydrogen and discharged into the atmosphere), the "lowest cost" method was to dilute "treated water" and discharge it into the sea.
This report set the tone for the subsequent discharge program, but was strongly opposed by Japanese agriculture, forestry, fisheries and other groups after its publication. Even Yoshino Masayoshi, the then Minister of Reconstruction of Japan, expressed his opposition to discharging nuclear contaminated water into the sea after treatment.
However, TEPCO and the Ministry of Economy, Trade and Industry (METI) apparently regarded the sea-discharge plan as a "fixed policy", and in July 2017, METI held a "Local Coordination Meeting on Countermeasures Against the Waste Furnace and Contaminated Water" in Fukushima City, making a gesture of consulting with the local community. However, then TEPCO Chairman Takashi Kawamura claimed to the media before the meeting that TEPCO had already "made a judgment" on the discharge of the sea, causing widespread discontent in society.
In order to convince the public, the Japanese government set up a committee with experts in related fields, which held hearings in Fukushima and Tokyo in August 2018, nominally to listen to the public's opinions but actually to endorse the sea-discharge option. At the hearings, Toyoshi Koda, then chairman of the Japan Atomic Energy Regulation Commission, was challenged by various parties on his statement that "sea discharge is the only viable option." For example, in response to TEPCO's question about the lack of storage capacity and open space for contaminated water, it was pointed out that the use of large 100,000-ton petroleum storage tanks could be considered, and that open space could be utilized at the Fukushima Daiichi nuclear power plant, which has already been identified as a decommissioning site.
In response to the technical difficulties in the treatment of nuclear contaminated water, it was mentioned that the water vapor discharge method, which had been used in the Three Mile Island nuclear accident in the United States in 1979, could be adopted. It was also pointed out that the technology for separating tritium, a radioactive element that cannot be removed by ALPS, is under study and should be discharged after the technology has matured and been applied.
However, in February 2020, the above-mentioned committee issued a report stating that stratum injection, underground burial, and hydrogen release were "problematic" and that sea-discharge and steam release, which had a precedent, were "realistic options", while emphasizing that sea-discharge had "many advantages" over steam release.
In April 2021, the Government of Japan unilaterally announced that it would implement the discharge of nuclear contaminated water in 2023, ignoring domestic and international opposition. Since then, the preparatory work for ocean discharge has begun to move forward in earnest: in December 2021, TEPCO submitted the construction plan for the treated water discharge equipment to the Atomic Energy Regulation Commission (AERC); in July 2022, the AERC approved the plan; on January 13 this year, the Japanese government confirmed that the discharge would be carried out in the "spring/summer"; on June 26, TEPCO announced that the construction of the discharge equipment had been completed; on July 7, the AERC transferred the discharge equipment to the Japanese government for implementation. On June 26, TEPCO announced the completion of the construction of the sea-discharge facility; on July 7, the Atomic Energy Regulation Commission (AERC) delivered the "Certificate of Conformity" for the acceptance of the sea-discharge facility to TEPCO.
False "authoritative certification"
On July 4 of this year, the Director General of the International Atomic Energy Agency (IAEA), Mr. Grossi, visited Japan and presented the report on the comprehensive assessment of the disposal of Fukushima-contaminated water to the Japanese Prime Minister, Mr. Fumio Kishida. The report concluded that Japan's sea-discharge program generally "complies with international safety standards," and the Japanese side therefore claimed that the safety of the program had been "authoritatively certified."
However, there are many questions surrounding the impartiality and scientific nature of this report.
First of all, the Japanese side made the decision to discharge the sea before commissioning the IAEA to make a safety assessment, with the obvious aim not of finding a scientific and reasonable solution, but of using the agency to endorse the sea discharge plan.
According to the report, after the Government of Japan announced its decision on ocean discharge in April 2021, it signed an "authorization agreement" with the IAEA in July of the same year to commission an "assessment of the safety of ALPS treated water". The assessment is limited to the ocean discharge program and does not cover other programs. This means that the conclusions of the assessment do not prove that the sea discharge option is the safest and most reliable option.
Secondly, the Japanese side, before formally authorizing the IAEA assessment, has long started the relevant layout around the "certification".
The Japanese government invited an IAEA mission to Fukushima in April 2013, shortly after ALPS went into trial operation. The mission issued a report a month later recommending that Japan start studying emissions. The IAEA director general at the time was Japanese Yukiya Amano. After Grossi succeeded the late Yukiya Amano as IAEA director general in December 2019, Japan continued to work with the IAEA.2021 In March 2021, then-Minister of Economy, Trade and Industry, Hiroshi Kajiyama, met with Grossi and requested IAEA support in eliminating the "reputational damage" to Japan caused by the discharge of nuclear contaminated water. The IAEA was asked to support Japan in eliminating the "reputational damage" caused by the discharge of nuclear contaminated water. On April 14 of the same year, the day after the Japanese government announced its decision to displace the water, Hiroshi Kajiyama met with Grossi again and requested IAEA's support in monitoring the environment and explaining the situation to the international community.
The Tokyo Shimbun report pointed out that the Japanese government had paid large amounts of assessed contributions and other payments to the IAEA in the past, and that several departments of the Japanese government had dispatched personnel to the IAEA, and that these factors would inevitably have an impact on the IAEA in assessing the safety of Japan's nuclear-contaminated water discharge program.
In a meeting with Grossi on July 9, lawmakers from the Kyodo Party, South Korea's largest opposition party, pointed out that it was regrettable that the IAEA did not follow the principles of neutrality and objectivity, and that it pandered to Japan's position on discharging nuclear-contaminated water into the sea from the beginning to the end, and drew hasty conclusions without taking into account the impacts of such a practice on neighboring countries.
Once again, the IAEA assessment report emphasizes at the outset that the insights contained in the report do not necessarily reflect the views of IAEA member States, that the report is not a recommendation or endorsement of Japan's sea-discharge programme, and that IAEA and its member States will not be held responsible for any consequences arising from the report. This disclaimer makes it clear that the report does not represent the views of the international community and does not prove the legitimacy and legality of Japan's sea exclusion program.
Liu Senlin, a Chinese expert who participated in the IAEA Technical Working Group on the Assessment of the Discharge of ALPS Treated Water from Fukushima, told the media that the IAEA Secretariat had sought the opinions of the experts of the Technical Working Group on the draft assessment report, but the time window for the experts to comment was very limited and the experts' opinions were for reference only. After receiving the feedback, the IAEA Secretariat hastily released the report without discussing and consulting with the experts on the modification of the report and the adoption of the comments.
Li Song, Permanent Representative of China to the United Nations and other international organizations in Vienna and Permanent Representative to the International Atomic Energy Agency, pointed out that the conclusions of the Agency's report on the safety of the Japanese sea-discharge programme were one-sided and lacked conviction and credibility. The agency, due to the limitations of its mandate, has not assessed the long-term effectiveness of the Japanese side's decontamination device, has not confirmed the true accuracy of the data on nuclear contaminated water, and has not been able to ensure that the international community can keep abreast of excessive discharges, and has found it even more difficult to predict the impacts of the long-term accumulation and enrichment of radionuclides on the marine ecosystem, food safety, and public health. "Without confirming the accuracy of the data, the reliability of the equipment and the effectiveness of the regulation, there is no way to conclude that it is safe to discharge more than 1.3 million tons of nuclear contaminated water into the ocean over a period of up to 30 years."
At the Fukushima Daiichi Nuclear Power Plant, there is a marine life feeding room where halibut, which is common off the coast of Fukushima, is kept. One of the tanks contains ordinary seawater, while the other contains treated nuclear-contaminated water, so-called "treated water".
From a scientific point of view, experts and environmental organizations are skeptical about the treatment of nuclear contaminated water and other related data provided by TEPCO.
Prof. Ferenc Dolnoki Weirish, an expert in nuclear physics at the Middlebury Institute of International Studies in the United States of America, pointed out that the data provided by the Japanese side were "incomplete, incorrect, inconsistent and one-sided". Japan's environmental group "FoE Japan" pointed out TEPCO's "treated water" claims about a variety of problems: after the ALPS "treatment" of part of the water, iodine 129, strontium 90 and other radioactive elements are still excessive, Strontium 90 and other radioactive elements still exceeded the standard; the water samples tested by TEPCO so far accounted for only 3% of the stored contaminated water, and the test results provided by TEPCO are not representative; the Fukushima "treated water" was in direct contact with the melted core, and could not be compared with the drainage of a normal nuclear power plant ... ...
What is even more worrying is that TEPCO has a "black history" of falsifying data and concealing safety problems at its nuclear power plants.
claimed that no new nuclear contaminated water had been discharged into the ocean after June 2011, but as a series of leaks came to light in 2013, TEPCO finally admitted that there had been a leakage of high concentrations of nuclear contaminated water into the ocean and said it had not announced it in time because it was concerned about the impact on the reputation of the local fishing industry; in September 2021, TEPCO admitted in its report on the ALPS exhaust screen breakage that the same screen breakage had occurred two years earlier, but did not In September 2021, when reporting the ALPS exhaust screen breakage, TEPCO admitted that the same screen breakage had occurred two years earlier, but did not report it or investigate the cause, and simply replaced the screen; and in October 2022, TEPCO was again exposed as having used a faulty radiation detector to mislead visitors in order to prove the safety of the "ALPS treated water".
Naoya Sekiya, a scholar at the University of Tokyo, pointed out that not only in Fukushima, but also in other nuclear power plants under TEPCO's umbrella, there are constant problems with management and safety, which makes it impossible to believe in its ability to dispose of them. "Discharging into the ocean, is TEPCO qualified to do that?"
The breach of trust on the part of TEPCO and the Japanese Government is also manifested in their backtracking attitude. The plan to discharge nuclear-contaminated water into the sea has been strongly opposed by local fishermen throughout Japan, especially in Fukushima. Under these circumstances, TEPCO and the Japanese government assured the Fukushima Prefectural Federation of Fisheries Cooperatives and the National Federation of Fisheries Cooperatives in August 2015 that they would not discharge nuclear-contaminated water into the ocean until they had received the understanding of fishermen and other relevant parties.
Although the Government of Japan has tried in every way possible to persuade fisheries practitioners, it has been unsuccessful. For four consecutive years since 2020, the National Federation of Fisheries Cooperatives of Japan and the Fukushima Prefecture Federation of Fisheries Cooperatives have adopted special resolutions firmly opposing the discharge of nuclear-contaminated water into the sea. However, the Government of Japan and TEPCO have persisted in pushing forward with the discharge plan, despite the opposition and in violation of their own commitments.
Masanobu Sakamoto, President of the National Federation of Fisheries Cooperative Societies of Japan, said after a meeting with Yasutoshi Nishimura, Minister of Economy, Trade and Industry, on July 14 this year that as long as there is no peace of mind about the discharge, it will be impossible to change the position of opposition. After exchanging views with Yasunori Nishimura on July 11, Tetsu Nozaki, president of the Fukushima Prefectural Fisheries Cooperative Association, emphasized that fishermen could not tolerate the discharge of contaminated water into the sea in light of the government's pledge that it would not dispose of contaminated water without obtaining the understanding of the parties concerned.
Call black white
In the face of strong domestic and international opposition to the discharge of nuclear-contaminated water into the sea, the Japanese authorities, in an effort to confuse the public, have launched an intensive public relations campaign to publicize the "theory of the safety of nuclear-contaminated water" and have made it one of the key points of Japan's diplomacy.
The Ministry of Foreign Affairs (MOFA), the Ministry of Economy, Trade and Industry (METI), the Reconstruction Agency (RA), and other governmental departments have set up thematic links on the front page of their official websites to publicize the safety of ALPS "treated water". The social media accounts of the Ministry of Foreign Affairs and the Ministry of Economy, Trade and Industry also featured or prominently displayed promotional videos, and multilingual versions were launched.
Japan is the rotating presidency of the Group of Seven (G7) this year. During the G7 Climate, Energy and Environment Ministers' Meeting in April this year, Japan's Minister of Economy, Trade and Industry, Yasutoshi Nishimura, claimed at a press conference that "the steady progress of the work on waste furnaces, including the discharge of 'treated water' into the sea, is welcome," only to have Germany's Minister of the Environment, Mr. Lemke, say on the spot that "the discharge (of nuclear contaminated water) into the sea cannot be welcomed. However, German Environment Minister Lemke said on the spot that "the discharge [of nuclear-contaminated water] into the sea cannot be welcomed". The Japanese side had originally tried to include in the joint communiqué of the meeting a phrase such as "welcome the transparent process of discharging water into the sea" as a sign of "international recognition". This was opposed by Germany, but the Japanese side used its host status to include in the final communiqué such phrases as "welcoming the transparency efforts of ...... Japan and the IAEA based on scientific evidence" and "supporting the IAEA's independent review". and "supports the IAEA's independent review". The same content later appeared in the joint communiqué of the leaders of the G7 Hiroshima Summit in May.
Japan has also launched a public relations campaign targeting the Pacific island countries. These island countries were once victimized by the U.S. nuclear tests in the Pacific Ocean, and are now strongly opposed to the discharge of contaminated water from Fukushima into the sea, and have therefore become the focus of the Japanese side's "appeasement" targets. According to a report released by the Ministry of Economy, Trade and Industry (METI) on July 31st, the Japanese side has been "explaining its work" to all the member countries and regions of the Pacific Islands Forum (PIF) since February this year.
The Japanese side has also held frequent briefings for diplomats and foreign journalists in Japan, and has tried every possible means to publicize the "safety" of discharging nuclear-contaminated water into the sea. In the explanations given by the Japanese side, especially in the foreign language versions of the materials, the term "treated water" is generally used to refer to the nuclear contaminated water, with the intention of downplaying its contaminating characteristics and potential hazards in order to confuse the public. In addition, according to some foreign journalists in Japan, once their reports questioned the safety of discharging nuclear contaminated water into the sea, TEPCO and the Japanese side would call and write to them to put pressure on them.
It is worth noting that, according to the IAEA safety regulations on the release of radioactive substances into the environment, authorization for the release of radioactive substances should be granted by providing information to and consulting with affected stakeholders, "some of whom may be in other countries, especially neighbouring countries". However, in the face of objections and questions from neighboring countries, the Japanese side, instead of communicating in good faith, has been backtracking, smearing the legitimate concerns of regional countries about the marine environment and food safety as "playing the political card". Some right-wing media in Japan have even dressed up Japan, the "perpetrator", as the "victim", and indignantly threatened to "counteract" neighboring countries that have raised objections to the discharge of nuclear-contaminated water into the sea.
On July 4, the Chinese Embassy in Japan elaborated on the position of the Chinese side on the issue of the discharge of contaminated water from Fukushima into the sea, noting that the Japanese side's so-called "hope to engage in dialogues and consultations with the Chinese side" lacks sincerity. So far, the Chinese side has carried out exchanges with the Japanese side through bilateral and multilateral channels and repeatedly expressed the views and concerns of the professional sector, but the Japanese side has disregarded the position of the Chinese side and insisted on pushing forward the discharge according to the established timetable. "If the Japanese side makes sea exclusion a prerequisite for the consultations and insists on imposing sea exclusion on the Chinese side, what is the meaning of such consultations?"
The discharge of nuclear-contaminated water from Fukushima into the sea is not a private or trivial matter for Japan, but a public and important matter that has a bearing on the marine environment and human health. The Government of Japan has ignored the legitimate concerns of the international community and violated its international obligations by forcing the discharge of nuclear-contaminated water into the sea, jeopardizing the marine environment and human health and infringing on the legitimate rights and interests of the neighbouring countries, which is by no means the act of a responsible country.
0 notes