#cdrsamples
Explore tagged Tumblr posts
Link
#cdr#cdr australia#cdrwriting#cdrhelp#cdrsamples#mycdraustralia#cdr report#cdr writing services#cdrwriters
0 notes
Photo
Get top quality CDR report Help for Engineers Australia around the world from our specialized Australian CDR expert writers’ team. Visit: https://bit.ly/2DPSm7J
0 notes
Photo
The best CDR, RPL and KA02 Report Writing service from the Australia’s top service provider.
1 note
·
View note
Text
What is CDR and why is it required?
Competency Demonstration Report or CDR is a technical document that needs to be submitted to the Engineers Australia (EA) for the skills assessment process. It’s a representation of your engineering skills and competencies written in long essay format.
Engineers who want to migrate to Australia have to go through Engineers Australia (EA) (the designated assessing authority for engineering occupations) first. The Migration Skills Assessment (MSA) accredits qualifications either from Australia or from countries who are a full signatory to the Sydney Accord, Dublin Accord, or the Washington Accord. Other countries that are not accredited by EA have to submit a Competency Demonstration Report (CDR). This means that if you are an engineer, and want to go to Australia to work/settle as an engineer, then, you have to apply to EA with CDR. EA would then decide whether you are suitable enough to get your dream true or not.
The respective authorities of Engineers Australia will thoroughly assess your report, credentials, and acknowledge the details shared by you. If the details are shared is good right now to match the standard of guidelines of authorities, the report will be approved and you will get to work there as an engineer. In simple words, it could be your ticket to getting your Skilled Migration Visa to Australia.
The following are the main requirements of a Competency Demonstration Report or CDR report as per Engineers Australia.
1. Your personal details including birth certificate, passport bio-data among others
2. An updated copy of your resume showing details of employment and education
3. Evidence of competency in the English language (test results for IELTS)
4. Educational qualification and/or enrollment certificates, academic transcripts or other documents
5. Employment documentary evidence
6. Three career episodes
7. Summary statement
8. Continuing Professional Development (CPD)
CDRSample is one of the best CDR Sample providers out there. We aim to assist Engineers in preparation of Competency Demonstration Reports (CDR). We provide complete guidance for Competency Assessment for EA Membership. We provide a number of exemplary CDR samples for different engineering disciplines at economical prices. These samples are already assessed and recommended by Engineers Australia. Our technical Writers who prepare CDR Samples hold Engineering degrees and have wide and profound knowledge in the engineering field.
Get your free CDR sample.
1 note
·
View note
Link
1 note
·
View note
Photo
Chemical Engineers with an impressive global experience are in more prominent need in Australia;
#chemicalengineer#cdrsample#eaapprovedsample#cdrreport#cdrhelp#chemical#engineer#cdrengineers#cdrwritingservices#anzsco233111#cdrreporthelp
0 notes
Link
We at CDRSample like to be transparent as to how we set up our workflow and what exactly processes are followed. In this context, we would like to present you some key details that concern our CDR writing process.
0 notes
Photo
The Australian Computer Society is the principal body in charge of determining applying for a Skill Assessment for ICT professionals.
The Australian Computer Society is the primary institution in charge of candidate skill assessments. ACS assesses potential migrant ICT professionals on behalf of the Australian Government to ensure they fulfil the relevant assessing authority standards for employment in a specified occupation in Australia.
The analysis aims to evaluate the applicant's knowledge, skills, and talents that they have acquired throughout their school year and job experience. A candidate might prepare for their skill evaluation with the help of a competent migration agency.
The ACS Guidelines outline the prerequisites for using the Migration Skills Assessment program to apply for a skills assessment. They do not, however, provide specific information on migration or visa requirements. The Department of Home Affairs handles all visa-related tasks.
Making an online application
The information and authentic papers you submit in the online application form will be used to assess your migration skills. In your application, you must provide the following papers.
The first page of your passport's identification page, which contains your name and other details.
Evidence of a name change (if applicable)
Certificate of Achievement or Degree: The name of the college or institution where the degree was earned. Your certification will be declared ineffective if you cannot produce sufficient documentation of degree completion.
Add the titles of your units, topics, or points earned in chronological order to your degree or award transcript. You must also present proof of your undergraduate degree if you have a postgraduate degree.
References from past employers, as well as proof of paid work, are required.
You'll also need to fill out an ACS RPL form if you're applying for an RPL.
Updated Resume needs to be uploaded in the personal document area.
If appropriate, a form for authorizing a migration agent.
Before submitting an online application, make sure it's decision-ready, which means you've completed all of the required documents so your application can be assessed as fast as possible.
ACS is under no duty to obtain more information. Application of incomplete or incorrect documentation may result in a postponement of the submission and an inappropriate conclusion. Each candidate should double-check that the information they enter into the online application process is correct and accurately reflects their personal information, education, and job.
Application Status
When you submit your online application, you will receive an email confirmation. This will contain your ACS reference number and password, which may be used to log onto your dashboard and follow the status of your application online. We cannot give any further information about your application beyond what is available in the online application status.
Priority request
Candidates with a visa deadline in Australia of fewer than twelve weeks from the date of application are eligible for priority requests. The deadline must be given to applicants at least two weeks in advance. Proof of the visa date must be supplied as a PDF document for the request to be accepted. As evidence, below are some instances of documentation to upload:
The Visa Entitlement Verification Online (VEVO) website displays the visa expiration date.
A letter from the Department of Home Affairs authorizing you to enter the country.
The deadline notice must be received after the ACS skills application has been delivered. The ACS has the authority to approve a Priority Request depending on the deadline conditions. Priority requests that do not meet a visa deadline will be treated as regular applications.
Application Processing time
The time it takes for an application to be processed is determined by the papers you provide. Your application will be handled quickly if it is decision-ready and follows ACS criteria. In contrast, the application will take longer to process if the documents are incomplete and the authority has requested further documents. An application's regular processing period ranges from eight to 10 weeks at the most.
Assessment process
ACS will assess your academic credentials and work experience to see if they are at an expert ICT level and linked to the ANZSCO occupation. Your qualifications and skills will be assessed to verify that they meet the educational standards in Australia. The course unit will be assessed to determine if the ICT content of your qualification is Major, Minor, or Inadequate. Relevant work experience will also be assessed to see if it satisfies the standards for the chosen profession.
The ACS result letter will be sent to you in PDF format via email. If your evaluation is successful, the DOHA will get a letter and proof of your competence assessment. If your appeal is refused, you will get a letter outlining the reasons for the denial and information on the review and appeal process.
Renewal and reapplication
Letter renewal is not available from the Australian Computer Society. You must submit a new application via the online application portal after logging into your dashboard.
Translation of Documents
Translations are necessary for documents written in languages other than English. Both the original and translated versions of the document must be provided to be assessed. Within Australia, document translation translators approved by the NAATI should be used to get acceptable translations (National Accreditation Authority for Translators and Interpreters).
Outside of Australia, document translation Translations that are suitable can be found at:
• A Ministry of Justice or similar in the country where the certificate was received
• An Australian Diplomatic Missions Australian Education International Section (AEIS)
• Australian High Commission, Consulate, or Embassy
• Private and Commercial Translators
• The Awarding Institution
Overseas translations must be done on the organization's letterhead and include an official seal and the translator's name, address, and phone number legibly written beneath the signature.
The ACS shall call the interpreter if required to validate the correctness of the translated papers based on the given information.
Why Choose CDR report writers?
For your skill evaluation, you'll need professional writers. We've got you covered, whether it's for your RPL or CDR report. We will take you to your destination under the parameters provided by the regulatory body. For your convenience, we give free CDR and RPL samples.
#migration skill assessment#acs rpl report#cdr cdrreport cdrwriting rplreport cdrsample ka02report#Australia immigration#rpl report for ict professionals
0 notes
Photo
Recognition of Prior Learning is a report submitted to the Australian Computer Society by people wanting to move to Australia to pursue ICT-related jobs but do not have a degree in ICT or come from an unrelated background. Thus, ACS gives an option for candidates who would not otherwise fulfil the ICT criteria to examine their knowledge and abilities through RPL reports under ACS Australia Migration Skills Assessment. We offer the greatest RPL reports produced by professional ICT writers.
Who needs an ACS RPL Report?
Their qualification background will determine the candidates who will be required to prepare the RPL report. The following are the categories for ACS RPL report preparation:
Applicants with a non-ICT degree must have a minimum of 6 years of work experience as a professional ICT employee in an area related to the specified profession.
Applicants without a tertiary qualification must have two years of work experience as an ICT competent employee (8 years in total). However, the additional two years of work experience are not needed to be relevant to the chosen occupation.
ACS RPL Report Reviewing Service
Applicants with an ICT background have to prepare the RPL report and submit it to the Australian Computer Society (ACS). However, ACS assessors would reject their reports given the lack of competence in drafting such technical reports. Therefore, we suggest you opt for professional writers familiar with your engineering field to get approved on the first try. After that, however, we will assist you in drafting your report on your own. If you have any confusion about your report's clarity after completion, we recommend that you send it to us for evaluation.
We may examine your RPL report and recommend the necessary adjustments to prevent rejection by ACS, based on our years of expertise creating RPL reports. CDRReportWriters provide the greatest ACS RPL Report reviewing service writers. In addition, our IT experts ensure that the RPL report we prepare is of high quality.
ACS RPL report reviewing service for ICT candidates
We realize how hard our candidates worked to complete their ACS RPL report. Unfortunately, candidates face many errors even though they put a lot of effort into writing a decent RPL report. RPL report submitted without having it checked may be rejected. Being rejected will indeed undermine your confidence. In addition, you'll have to redo the entire RPL report, which will cost you money, time, and work.
Having faced these problems comes from our recent client experience, so we suggest you consider using an RPL report reviewing service so that a qualified IT writer can evaluate your report and inform you of any missing parts.
Our licensed expert IT writers work hard to ensure that your RPL report is error-free and devoid of plagiarism so that you may receive a good rating from ACS.
How can you benefit from the RPL review?
The following are the significant causes for RPL report rejection:
Inadequate work experience
insufficient technical information
Irrelevant task descriptions
Plagiarism
While reviewing your RPL report, we pay close attention to all of these elements to guarantee that it is of the highest quality. Along with reviewing, we provide proofreading, editing, plagiarism detection, and removal are all part of our review service.
Technicalities
An RPL report, according to ACS rules, must include all technical components required to demonstrate your ICT abilities and expertise. Therefore, our staff ensures that all technical sections of your RPL report are included.
Choice of Project
We compare your projects with the rules from the ACS criteria. We also go through the jobs you've stated for each project to determine if they include enough ICT-related complexities to exhibit your ICT abilities.
Flow
The RPL report's represented flow of activities and responsibilities must be free of abnormalities. Therefore, we ensure that the flow of your report is correct.
Plagiarism Check and Removal
Plagiarism is a significant reason why most RPL reports submitted to ACS are rejected. We utilize powerful algorithms to detect the quantity of plagiarized information in your report and then delete it in stages to make your content original and distinctive.
Editing and proofreading
We check every section of your RPL report for small mistakes, from spelling errors to sentence formats. Next, we check for grammatical and typographical problems and then make the necessary adjustments.
We are well-known in Australia as the most effective provider of CDR writing, RPL writing, and KA02 writing services. The candidates benefit from the intellectual team's professional Writers, Experts, Engineers, IT Specialists, and so on. In addition, we assist candidates from all around the world who wish to come to Australia as skilled workers.
#acsrpl#acsrplreportreviewing#acsrplwriting#skillassessment australiaimmigration prvisaforaustralia prpoints cdrreportwriters#acssociety#migration skill assessment#cdr cdrreport cdrwriting rplreport cdrsample ka02report
0 notes
Photo
Download the CDR Samples, visit our site and choose any engineering discipline.
0 notes
Photo
Get the free CDR Sample of Engineering Manager provided by the CDR professionals
0 notes
Photo
Hey guys if you got any queries related to CDR, feel free to contact us and chat with the CDR experts.
Website : https://cdrreportwriters.com/
Phone : +61 488 838 789
Email : [email protected]
0 notes
Photo
We are Australia’s best CDR Report Writing and Reviewing Services and have many years of experience on this work.
0 notes
Photo
0 notes
Photo
CDR Sample For Electrical Engineers
CDR Sample for Electrical EngineersIn Australia, there is an intense interest of the Electrical Engineers. The presumed organizations in Australia additionally respects the capable Electrical Engineer from different countries, where countless talented and qualified designers come to Australia consistently from various countries over the world to fill in. The Electrical Engineers from overseas with a wish to enhance their career in Australia are required to go through a CDR assessment by EA to get selected in the employment code: ANZSCO 233311. The engineers with four years of Bachelor’s degree in Electrical Engineering can apply for the post of Electrical Engineers.
CDR sample for Electrical Engineers includes all the required reports such as Curriculum Vitae (CV), Continuing Professional Development (CPD), three Career Episodes (CE), and Summary Statement. The content of the CDR Report Samples is given below: CDR sample for Electrical Engineers includes all the required reports such as Curriculum Vitae (CV), Continuing Professional Development (CPD), three Career Episodes (CE), and Summary Statement. The content of the CDR Report Samples is given below:
Curriculum Vitae (CV): Resume on the basis of a professional template.
Continuing Professional Development (CPD): The sample of CPD clarifies the Engineering Knowledge of the applicant – 470 words.
Electrical Engineer Career Episode Sample 1: “Battery charger system” – 2036 words
Electrical Engineer Career Episode Sample 2: “Transformer protection system” – 2076 words
Electrical Engineer Career Episode Sample 3: “Induction motor speed control system” – 1952 words
Electrical Engineer Summary Statement Sample: Detailed explanation of all the competency element – 2379 words.
Electrical Engineering CDR Sample
1 Project Name: Battery charger system
This project was titled “Battery charger system”. The engineering activities that the author did during the project are as below:
· To study and review the mechanics, feasibility, and factors to consider to design the charging system of lead-acid batteries.
· To select a component like a resistor, Zener diode, battery for the system development.
· To develop the workflow mechanism and design the battery charger system
· To design the filter capacitor, bridge rectifier, and internal transformer
· To simulate the designed system using MULTISIM
· To test and analyze the charging process of the developed system.
Problem & Solutions:
Some of the major problems that were encountered by the author during the “Battery charger system” along with their solutions are defined below:-
1.Problem 1 career episode 2 and its Solution
During analyzing the circuit charging module Arthur came across some problems regarding the charging module of the circuit. When the input was provided, the very high gain was obtained for the operational amplifier, and the operational amplifier produced the larger output. Due to the large output voltage, the Zener diode connected to the output terminal of the operational amplifier was not functioning. This resulted in the fluctuation of the circuit.After study and research, Arthur found that there might be a problem regarding the connection between resistance capacity and an operational amplifier. Then Arthur checked the connection and found that there was no such issue regarding the resistance capacity and amplifier and circuit connection. The Arthur reviewed the limiting process of the output voltage of LM741 and found that using the register from the output of LM741 to the inverting terminal of LM741. Then the Arthur calculated the value of the negative feedback of the register and connected the register to the output of LM741 to the inverting terminal of LM741. Furthermore, the circuit performance found that there is a smaller output voltage of LM741 and gain was also decreased.
2. Problem 2 career episode 2 and its Solution
The output current and voltage was smaller than the actual voltage when AC to DC conversion took place. When the input signal was 230Vrms to AC-DC converter, the output was 12v, which was smaller than the actual voltage. So to take necessary steps, the Author studied the different research papers and found that the issue might have raised due to the element of AC to DC converter. During the analysis, Arthur found that the issue was raised due to the transformer. Secondary winding was bigger than the smaller winding, which caused less output voltage. To solve this the Arthur calculated the transformer ratio, which was 0.0073. Then, Author changed the primary winding of the transformer and found that the voltage from AC to DC converter was 16Vrms. The output of the AC to DC converter was given to the charging circuit.
3. Problem 3 career episode 2 and its Solution
During the simulation, author faced a problem regarding the input voltage limit. Arthur found 40v output from the output of the voltage limiting circuit, which was greater than the expected output value.The Arthur found that the Zener diode value was greater than the expected value. When the output value of a more zen diode was greater than the actual value, the control transistor Q2 turned on the transistor Q1, the charging circuit disconnected from the input. Then Arthur changed the Zener diode value as per the calculation. When the output value of a more zen diode was greater than the actual value, the control transistor Q2 turned on the transistor Q1, the charging circuit disconnected from the input. Then |Arthur changed the Zener diode value as per the calculation and found that the voltage limiting value of the circuit was 15v. Electrical Engineering CDR Sample 2Project Name: TRANSFORMER PROTECTION SYSTEMThis project was titled as “TRANSFORMER PROTECTION SYSTEM”. The engineering activities that the author did during the project are as below:
• To study and review the power system and protective method.
• To select the component like microcontroller, relay and step down transformer based on the design of the system.
• To design the hardware and software program for the system model.
• To perform the connection of the components like relay, microcontroller and transformer for the development of the system.
• To simulate the designed system in Visual basic 6.0 and Proteus software.
• To test and analyze the performance of the overall circuit.
• To perform the administration of the whole procurement process for the materials required in the project.
• To inspect, monitor and supervise the activities on the site ensuring they were in accordance with the targeted budget, quality, environmental standards, and company regulations.
Problem & Solutions:
Some of the major problems that was encountered by the author during the “Transformer protection system” along with their solutions are defined below:-
1. Problem 1 career episode 2 and its SolutionInitially, the current sensor sensed the wrong value for the current that leads to isolating the transformer form power lines in normal condition. So to solve this issue, Arthur performed research regarding the issues and also consulted the project supervisor. From the research, the author found that the high-value resistor was for a current sensor, which increased voltage drop, and as a result, the power loss increased for the system. To solve this issue, a low and appropriate resistor for the circuit was used. Then again, the Author tested the voltage value from the current sensing device, but the issue was not solved. So Arthur further found that the accuracy of the sensor changed due to the use of the high-temperature coefficient resistor. So the Arthur mitigate this problem by using the resistor of low-temperature coefficient and by using low inductance resistor which solved the issue regarding the current sensor.2. Problem 2 career episode 2 and its SolutionArthur found a problem regarding the trip coil. The trip coil was not energizing as per the requirement of the system that caused the relay failure. To resolve this issue, Arthur found the mechanism of testing the failure of the relay so that damaged relay can be found. Using USB controlled tools, the Author found the damaged relay by measuring the resistance of the paths between different pins of the system. Then replaced the damaged relay with the new ones. When the fault occurred the relay operated and reclosed itself automatically when the fault cleared. Using this method problem regarding the relay was solved.3. Problem 3 career episode 2 and its SolutionLikewise, Arthur found that the relay encounters a mechanical problem, due to which there was poor protection. To solve the issue regarding the Relay, Arthur used TRIAC as a member of THYRISTOR family, which can be used for transformer protection. Due to the absence of the moving part, TRIAC will lead to less maintenance and a longer life span of the transformer. Due to the high load voltage in the transformer, the relay was facing the problem regarding sensing the abnormal condition to solve this issue, Arthur decreased the load voltage of the transformer. Electrical Engineering CDR Sample
3 Project Name: INDUCTION MOTOR SPEED CONTROL SYSTEMThis project was titled as “INDUCTION MOTOR SPEED CONTROL SYSTEM”.
The engineering activities that the author did during the project are as below
· To study and review the speed control mechanism in the induction motor.
· To select the component like multilevel inverter, induction motor, drives and switching device for the development of the system.
· To design and develop the block diagram and workflow of the system model.
· To design the control unit to control inverter and use AC supply for bridge rectifier.
· To simulate the design system using MATLAB.
· To test and analyze the performance of the system.
Problem & Solutions
Some of the major problems that were encountered by the author during the “INDUCTION MOTOR SPEED CONTROL SYSTEM” along with their solutions are defined below:-
1. Problem 1 career episode 3 and SolutionThe problem regarding the voltage fluctuation occurred when the load draws periodic variation in the current supply. So, the fluctuating current has developed the fluctuation in the supply voltage. This current has also caused a drop in the voltage of the system. The Arthur also found that the variation in the load has caused the voltage fluctuation in the system along with an issue regarding the harmonic in the AC Supply. To solve this problem, the Author added the small capacitor, so the reactive network power is strengthened and allowed the finer tuning requirements of reactive power. After adding the capacitor, the power factor was enhanced, and the reduction of voltage fluctuation was seen. This method also increased the active power and increased the stability and efficiency of the system.
2. Problem 2 career episode 3 and SolutionRipples were seen in the system when the rectified signal was feed into the controlled multilevel inverter. To solve this issue, Arthur used the capacitor, but this resulted in the unexpected output of the system. This issue was raised because of the multilevel inverter or control unit. To solve these issues, a detailed study of the component was performed. Arthur found that during the rectification AC signal was converted into the DC signal, which was not pure because they contained ripples. So capacitor in the inverter was introduced, but the issue was not solved. After further research, the size of the capacitor also affect the DC Signal and produces ripples. So the size of the capacitor was increased as per the requirement of the system.
3. Problem 2 career episode 3 and SolutionThere was an issue which was caused due to the series connection of the power devices which was made in order to handle the large voltage and power in the system. To solve this issue the device was integrated gate bipolar transistors, gate turns off thyristors and integrated gate commutated transistors. After this adjustment, there was a problem regarding the unequal dissemination of applied voltage across the series-connected device. Arthur found that due to less blocking voltage compared to the applied voltage that issue occurred. Arthur rechecked the model and datasheets of all switching devices and transistors and reconnected the component, and these solved the problem regarding the unequal dissemination of applied voltage.
0 notes