#TENDER FOR SUPPLY AND DELIVERY OF STEEL PIPES AND OTHER WATER WORKS EQUIPMENTS.
Explore tagged Tumblr posts
jobskenyaplace · 3 months ago
Text
TENDER FOR SUPPLY AND DELIVERY OF STEEL PIPES AND OTHER WATER WORKS EQUIPMENTS.
MALINDI WATER AND SEWERAGE CO. LIMITED TENDERS OCTOBER 2024  TENDER NOTICE Malindi Water & Sewerage Company Limited now invites sealed bids from eligible bidders for;   TENDER NAME SUBMISSIONDATE MAWASCO/T003 /2024/2025 Supply and Delivery of Booster Pump 14/10/2024 at 11.00 am EAT MAWASCO/FW/ T001/2024/2025-2026 Framework Agreement For Provision Of Legal Services 21/10/2024 at 11.00 am…
0 notes
techniwater · 3 years ago
Text
The right way to Receive Water Jet Chopping Services
Water jet machining expertise consists of using excessive-stress water jets for lowering components out of assorted varieties of fabric similar to delicate rubber, foam, extremely skinny stuff comparable to foil, carpet, paper, cardboard, delicate gasket materials, candy bars, diapers, and mushy wooden. Its use is restricted, because it can't scale back tougher provides similar to metals, glass, and laborious wooden.
The water utilized in water jet machining programs is pressurized between twenty and sixty thousand kilos per sq. inch (PSI) relying on the type of materials being scale back. The extremely pressurized water is released by means of a tiny hole known as "jewel" which is commonly 0.007" to zero.015" in diameter, creating a really excessive velocity beam of water able to reducing tender materials.
Water jet machining course of is managed with the assistance of laptop numeric control (CNC) software program that guides the water jet nozzle consistent with the strains and arcs of a computer aided design (CAD) drawing. The CAD drawing is a 3 dimensional (3D) graphic illustration of elements which are to be fabricated. The expertise TECHNI Waterjet has many advantages corresponding to straightforward to make use of components, fast meeting course of, lowered flip round time on the machine, complementariness to other machining methods, and lowering without heating the fabric.
One major drawback of water jet machining is that the nozzle usually will get blocked on account of mud particles that could be present throughout the water. The opposite downside with water jet assemblies is that they're prone to mounted put on and tear precipitated as a consequence of high-stress water flowing out of tiny nozzles.
These drawbacks are however ignored, as water jets are essentially the most surroundings friendly and protected machining know-how used inside the current era. It does not produce great particles which can get into the human body and cause fatal sicknesses reminiscent of most cancers. Particles if any are swept away with the strong drive of the water jet and do not pollute the encircling environment.
Clean tubs, showers, sinks, and drains are a necessity. In every other case, your family members would possibly fall ill as a consequence of water borne illnesses. Using water jetting machines to periodically clean your drains and sinks will provide Wikipedia Here help to to take away obstructions. Equip your self upfront so that you just would not have to face hassles in case of emergencies.
You can search on-line for a company which retails these varieties of things. Shortlist two or three which have affordably priced fashions. You may Our Social Profile also ask your pals, household, and colleagues for recommendations.
Have a take a look at images of the fashions accessible on the corporate web page. They should have a 1500 psi in order that it is straightforward to wash drains. Read the handbook fastidiously so that you just use the machine in an accurate method. It is best to know one of the simplest ways to maintain it in order that it may remaining you for a very long time.
Learn the phrases and circumstances before you place your order. You need to uncover out particulars regarding the returns coverage in case you alter your mind. Also uncover out whether or not tax and supply expenses must be accounted for.
Examine the delivery date as a way to adjust to up with the company in case of want. Verify the payment choices obtainable as a strategy to put together accordingly. Confirm whether or not or not the positioning has safety measures in place so that transactions are safe.
Find out the out there price choices to be able to put together accordingly. Oil the machine repeatedly in order that it's in good working situation. Retailer it rigorously if you end up not using it so that it is protected. Decide the aim for which you want this machine.
When you solely want it to clean your tubs, showers, and sinks, you can make do with a lightweight-weight model. You might want a extra powerful one in case you want to clear your drains as well Read Blog. Uncover out what sort of a chemical resolution you can use to scrub your drains so that you can buy it upfront.
Watch out for those who use a machine like this in any other case you can get harm. You would possibly want to follow using it because of chances are high you'll harm the paint in your individual residence in any other case. Use a quick hose with a large inside diameter in order that it's easy to manage the stress and water amount.
It's finest to order water jetting machines from a longtime agency. This could make sure that they are of positive high quality. Uncover out the service choices in case you need assistance after you buy these items.
Water jetting has the benefit of not producing mud particles. This might enable totally different close by activities to happen unhindered. Water jetting can clear surfaces to the perfect doable regular, offering among the best flooring preparation for industrial painting, for example.
Water jet machines could be powered by an electrical motor or a diesel engine. They are often provided as excessive stress or extraordinarily high stress items. The differ of features they'll undertake is spectacular. Aside from floor preparation they can be utilized for cleansing tanks and vessels. They can be utilized for cold slicing.
In chilly decreasing a excessive stress water jet is utilized in combination with a pointy edged abrasive compound. This works effectively on steel and concrete in addition to on different supplies. Little or insignificant heat is generated, which makes this chopping method very appropriate in cases where the same old warmth generated by slicing is undesirable.
Cold slicing is probably harmful as an especially excessive pressure of water is used. For that reason operators should be correctly educated and may wear the proper safety garments and tools. For apparent causes the operators involved in chilly chopping do not remain near the lowering jet. It is operated at a protected and distant distance.
Water jet machines are useful in eradicating scaling from the inside of pipe work. By necessity the gear utilized in these circumstances entails the usage of small nozzle heads that will enter pipes of a small diameter. On account of pipes typically have bends, the water jets additionally should be versatile enough to deal with the changing conditions it will probably encounter. That's by necessity a remotely managed operation and variable velocity management permits it to deal with all doubtless conditions.
Environment friendly water jet machines have a low water utilization charge. They can employ filtration and recycling methods which eliminate www.techniwaterjet.com the necessity for regular water replenishing and related water wastage. This can make the system very cost effective.
1 note · View note
cloverincinerator · 8 years ago
Photo
Tumblr media
www.chinaclover.net has been published on http://www.chinaclover.net/incinerator-testing-commissioning/
INCINERATOR TESTING AND COMMISSIONING
A flue chimney, 15,000mm long and 560mm diameter shall be constructed from steel sheet, complete with lagging, damper and rain water protection cone.  The chimney shall be lined with castable grade diatomaceous concrete mixed with high alumina cement in accordance with BS 4076: 1989.
The damper will control the closing of the door to not less than 85%.  The stack is to allow fresh air at the stock’s base so that the flue gases are discharged at not move then 4000 C and that the discharge conforms to the British Clean Air Act, the National Environment Management Agency (NEMA) Act or other relevant acts. .
1.1.4    POWER SUPPLY
The sub-contractor shall supply equipment which are suitable for running on a 415V, 3 phase, 50HZ or 240V, single phase, 50HZ electric power supply.
1.1.5   OIL STORAGE AND SUPPLY
The system shall consist of a bulk oil storage tank, daily tank, transfer hand fuel pump and associated pipe work.  Oil from the bulk storage tank will be delivered to a high level daily tank situated in the incinerator room by use of a transfer hand pump and automatic electric pump.
1.1.6    SPARES AND MANUALS
The tenderer is to submit with his tender a list of recommended initial stock of spares together with their prices.  A part from the burner spares mentioned here below, the spares prices are not to be included in the main summary of prices schedule but is to be separate and are meant to be ordered later if and when it becomes necessary and convenient to the client.  The burner spares whose prices are to be included in the main summary of prices schedule (BQ) are:-
i)     1No. Set of safety controls ii)    1No. Solenoid valve iii)    1No. Oil ignition system iv)    2No. Photo-electric cells
Two sets of operating and maintenance manuals (both for the incinerator and burners) must also be supplied. This include two sets of control schematic diagrams for all the controls and wiring.
1.1.7   BULK OIL STORAGE TANK
The bulk oil storage tank nominal capacity of 10,200 litres and complying with BS 799 part 5: 1975 shall be positioned on three concrete cradles.
The works shall include supply, delivery, assembling, erection, testing, commissioning and setting to work.  The tank is to be of welded mild steel type with a design pressure of  40KN/m2 and storage temperature of 240  C.  It is to be located adjacent to the incinerator and boiler house.
The tank shall be cylindrical with dished end and be constructed of 6mm thick block mild steel plates in accordance with BS 1966.  Number one quality galvanised materials shall not be used.Welded construction parts shall be sprayed.
E-4
The tank shall be pressure tested with a total head of water or equivalent, measured from the base of the tank, and equal to 1½ times the sum of:
(i)     The height of the tank and (ii)    The design head above the top of the tank that is 3.5m of water.
The pressure shall be raised slowly and steadily until the specified test pressure is reached and that pressure shall be maintained for a period long enough to permit a thorough examination to be made to ensure that the tank is sound enough and shows no leaks or undue distortion.  Welded joints shall be radiographed and a certificate issued.  Should any defects be found, they shall be made good and the test procedure repeated until the tank is certified to be sound.  The tests shall be carried out in the presence of the Engineer and subsequently, the sub-contractor will provide the Engineer with the test certificate.
The tank shall then be cleaned externally and provided with rust inhibiting primer before applying 2No. coats of bituminous paint.  The inside shall also be cleaned and purged of any foreign matter before setting to work.
Ladders and platforms shall be thoroughly cleaned and freed from rust and scale and painted with a priming coat of approved paint.
The tank shall be provided with the following:-
(i)    450mm bolted inspection covers with liquid and vapour tight joint made with a gasket of fuel resistant materials. (ii)    75mm (3”) vent socket screwed B-SP and pipe at the higher end of the tank with an unloading device to prevent the rise in tank pressure above the design pressure.  The vent pipe shall be free from bends and shall have a continuous rise while being as short as convenient.  It shall terminate in open air in a position where it cannot be tampered with.  The open end shall be turned down and fitted with an open mesh wire cage. (iii)    65mm diameter filling pipe with hose coupling connection (iv)    50mm diameter gauging connection with lockable cap. (v)     50mm diameter supply pipe (vi)     25mm diameter water drain-off value
The tenderer shall supply hydrostatic oil contents gauge (level indicator) or a properly calibrated stick (of dip tape) and access ladder to the top of the tank.
The filling pipe shall be extended inside the tank to within 150mm of tank bottom, complete with anti-siphoning device.
The following information shall be permanently and clearly marked on the tank on the centre line near the outlet connection.
•    Gross capacity in litres •    Test pressure •    Date of test •    Maximum allowable working pressure •    Manufacturer’s name of trade mark •    Year of manufacture •    The number of British standard and type of tank
The tank shall be installed with a 25mm fall towards the water drain-off tapping point.  The supply socket shall be extended inside the tank to prevent ingress of water in the supply line.  The main contractor shall construct tank supports and bund walls to detail drawings produced by the sub-contractor.  A valued drain off from the lowest part of the tank shall be provided complete with tail pipe and a provision for hose connection.
E-5
1.1.8    TRANSFER HAND PUMP
A semi rotary hand pump shall be provided for filling the day storage tank from the oil drum.  It shall be installed complete with all the necessary plumbing fittings and accessories.
1.1.9   DAILY SERVICE TANK
A daily storage tank of nominal capacity 1,800Litres shall be mounted at 2.5 metre high level in the incinerator room.   Tank shall be manufactured from 6mm thick pressed steel plates of 1220mm x 1220mm black mild steel sheet, complete with bolted cover and adequate venting.  The tank shall conform to BS 799 part 5 1995 and be provided with a contents sight tube. The tank shall be lagged with 50mm thick fibre glass insulation of 0.4W/m2 thermal conductivity and finished with 20SWG galvanized sheets cladding.
The tank shall be tested for any leaks of which if any is detected will be made good before the tank is painted externally with rust inhibiting paint. Tank to be securely bolted.
1.1.10  AUXILLIARY EQUIPMENT
All pipework used in the oil storage systems shall be to B.S. 1387 heavy grade.  Joints shall be screwed, and sufficient unions must be provided to allow easy dismantling the equipment.
A 25mm diameter fire valve of the quick action lever operated dead weight type shall be installed, in the oil flow line.  This shall be held in the open position by a light gauge steel cable attached to a fusible link.  The fusible link shall be mounted directly over the burner.  The warm burner oil feed pipe from the high level day tank shall be heated by an electric tracing tape properly wrapped around the pipe.  The pipe shall then be insulated with 25mm thick fibre glass insulation and finished with gauge 22swg galvanized steel sheet.
The supply pipe from the bulk oil storage tank to the high level day has been installed by others but the tenderer shall allow for connection to the high level day tank.  The tenderer shall also supply and install high capacity strainers along the supply pipe and the burner feed pipe.
1.1.11   PIPE SUPPORTS
The variety and type of supports shall be kept to a minimum and their design shall be such as to facilitate guide and secure fixing to match concrete masonry or wood.
Consideration shall be given when designing supports to the maintenance of desired pipe fall and the restraining of pipe movements to a longitudinal axial direction only.
The sub-contractor shall supply and install all steel work forming part of pipe support assemblies and shall be responsible for making good any damage to builders work associated with builders work installation.
Pipe runs shall be secured by clips connected to pipe hangers, wall brackets or trapeze type supports.  ‘U’ bolts shall not be used for clips without prior approval of the Engineer.
The sub-contractor shall submit his entire proposal for the pipe supports to the Engineer for approval before any erection work commences.
1.1.12   ELECTRICAL WORKS
All wiring between items, plant and controls shall be executed by the tenderer. The tenderer shall provide adequate supervision to ensure that electrical connections are correctly made to all items of equipment and controls supplied by him, all to the Project Manager’s / Engineer’s satisfaction.
E-6
1.1.13    INCINERATOR TESTING AND COMMISSIONING
The tenderer shall test and commission the incinerator in the presence of the Engineer.The tenderer shall also provide sufficient oil to last at least two (2) hours.  The tenderer shall test and commission the incinerator in the presence of the Engineer and verify that the incinerator is functioning according to the specifications laid here-in and in the catalogues and manuals from the suppliers of he incinerator.The incinerator performance test shall be carried out in accordance to BS3316: part 4:1987.Should any defect be detected, it shall be rectified and the testing process repeated to the Project Manager’s satisfaction.
1.1.14    FIRE INSTRUCTION NOTICE
Proceed and procure and install as below;
Print fire instruction on the Perspex plate, 3mm thick with White Colour Background measuring 510mm lengthx380mm width as follows;
0 notes