#Putzmeister M760
Explore tagged Tumblr posts
Text
Hull Minster Hull Lime Screed Floor
Hull Minster Hull Lime Screed Floor
Lime Screed Floor Project Paul Butler Plasterers Limited 117 Pickering Rd, Hull, North Humberside, HU4 6TB Managing Director Paul Butler
Based in Hull Paul Butler Plasterers Limited cover all projects within a hundred mile radius. Speed Screed was the obvious choice for the Lime Screed Floor. Having worked with Paul on numerous projects over the years, we can confirm that they are a delight to…
View On WordPress
0 notes
Text
Floor Screeding Contractors Kent
Floor Screeding Contractors Kent
Kent Building Services Ltd Mortimer Street Herne Bay Kent CT6 5HA Managing Director Bob Whiting
Orchard Cottage, Church Lane, Whitstable, CT5 4BX
Kent Building Services Ltd required the services of floor screeding contractors Kent. The project was for a new build property to replace the existing house which was demolished to make way.
All…
View On WordPress
0 notes
Text
Boston Screeding Contractors with Cyden Homes, Lincolnshire
Boston screeding contractors needed for a previously prepared substrate on another premium housing project for Cyden homes in Lincolnshire.
Client Profile
Cyden Homes, a professional local home builder in Grimsby. Renowned for the quality build with a contemporary specification and exceptional finish. An award-winning company who helps buyers with their government-supported Help to Buy scheme.
View On WordPress
#Adfil Fibrin 660F#boston screeding company#case study#Fast Dry Screed#Fast Drying Screed#Fibres#Mapescreed 704#Putzmeister M760#screed case studies#Screed Case Study#screeding contractors in boston
0 notes
Text
Skegness Traditional Screed Project Finished Ahead of Time, Lincolnshire
Skegness traditional screed project finished ahead of time for North Sea observatory chapel in East Lindsey. A contract brought by a long-established client earlier.
Simon Blaydes – Gelder Group Environmental Officer.
Gelder GroupA maintenance and building company with dedicated ‘Environmental Officer’ to manage all environmental impacts of the Group’s activities. Gelder group’s broad range of…
View On WordPress
#Adfil Fibrin 660F#case study#floor screed#floor screeding contractor#Putzmeister M760#sand and cement screed#screed case studies#Screed Case Study#screed for water underfloor heating#skegness traditional screed#traditional screed#Traditional Screed For Building
0 notes
Text
Fast Drying Screed Flooring for Residential Property, Hartington Crescent, Coventry
Fast drying screed flooring was the requirement from T J Services Limited for their residential project in Coventry. To enable the screed to receive foot traffic earlier than normal (after 8 hours) the screed system needs to specialist one.
T J Services limited, have 20 years experience in the construction industry. Offering home improvements services, including dry lining and plastering.
Fast…
View On WordPress
#Adfil Fibrin 660F#case study#Fast Dry Screed#fast drying floor screed service#Fast Drying Screed#Keracem eco#Putzmeister M760#screed case studies#Screed Case Study
0 notes
Text
Screed Floor Construction For MP Building Limited, Hitchin, UK
[fusion_text]The project required the use of traditional screed for a screed floor construction. Laid on the previously prepared substrate with insulation.
MP Building is a Hertfordshire based building contractor. Specializing in traditional and commercial construction. Designing and refurbishment contracts. Expert in working with green technologies.
MP Building is a great team to work with…
View On WordPress
#Adfil Fibrin 660F#case study#floor screed mix#Putzmeister M760#sand and cement screed#Screed Case Study#screed floor construction#traditional screed#Traditional Screed For Building
0 notes
Text
Screeding Underfloor Heating
Winchcombe Farm Day Nursery - Screeding Underfloor Heating
Winchcombe Farm Day Nursery is a privately owned day nursery who has provided up to 80 nursery places for children from 6 weeks to 5 years old. They also run a school holiday club for children in school holidays. Providing a safe home-from-home environment for children. This was a screeding underfloor heating commercial project that we completed recently.
Project Fast Drying Screed Requirement This project already had prepared insulation and underfloor heating when we laid the screed. We made sure to use fast drying screed to reduce program time and allow floor coverings to be laid quickly. Keracem Eco was used in this project, so any light foot traffic can be allowed only after 8 hours after screeding underfloor heating. The underfloor heating was allowed to be turned after only 3 days, isn't that amazing? And because of the fast drying screed, the client was able to lay ceramics after only 24 hours if required (subject to commissioning the system), what a convenience a fast curing screeding underfloor heating system is in reducing the program time. Mixing Process As the leading screeding contractor in Banbury, the was mixed screed using a Putzmeister M760 with skip and scraper, which reduced the labour effort when mixing the screed. The Keracem Eco is a rapid drying mineral binder, and is perfect for underfloor heating in both commercial and domestic projects. Half of the one-tonne bulk sandbags delivered by Jewson's was placed in the vessel followed by Keracem Eco, water and construction fibres. In this case, we used Adfil Fibrin 660F. Plastic shrinkage and plastic settlement cracking were reduced by using these fibres. The other half of the sand is then added to the vessel. After which, the mixing begins. For convenience, the screeding underfloor heating mix was pumped to the exact location where it is required, and then the installers lay the screed to provided datums. Read the full article
#AdfilFibrin660F#Branburyfloorscreeders#Keracemeco#PutzmeisterM760#screedingcontractorsinbanbury#underfloorheatingscreed#screed#screeding underfloor heating#screeding
0 notes
Text
Taylor Lindsey Limited, Minster Fields, Wolsey Way, Lincoln, LN2 4ST
Taylor Lindsey - Lincoln Site
This flats project is located on Taylor Lindsey’s premium Lincoln site. The requirement was for Lincoln screed, insulation, membrane and acoustic insulation. The acoustic insulation was essential to pass Part E of the building regulations relating to sound.
Lincoln Screed
For this project, we used 1:4 Fibre Screed, with IsoRubber acoustic insulation from Thermal Economics. The systems meets with Robust Details E-FC-4 which is a 65mm cement-sand ratio screed. At 65mm a 1:4 Fibre Screed meets with the density requirements of Robust Detail. When working to Robust Details, there is no need to have pre-completion sound testing carried out on the units as long as all the steps in the system have been carried out to the standards required. Part E only applies to multi occupancy buildings, however many other projects benefit from this type of noise control. The installation of the IsoRubber is critical to performance, and has to meet the high standards of Robust Detail. Firstly the Isoedge was installed to all vertical points, and then rubber based is laid. There should be no transmission pathways for sound. Once installed the Lincoln screed project could continue. The 1:4 Fibre screed was site batched, with the screed being mixed using a Putzmeister M760 with skip and scarper. The skip and scraper working together to reduce labour effort when mixing the screed. Screed Mixing
When mixing half of the sand is placed in the vessel, then cement, water and construction fibres Adfil Fibrin 660F. The fibres are present to significantly reduce the occurrence of plastic shrinkage and plastic settlement cracking in screed. The second half of the sand is then added into the vessel before mixing begins. For convenience the screed is pumped to the exact location where it is required, and then the installers lay the screed to provided datums. Read the full article
#acousticinsulation#casestudy#ScreedCaseStudy#traditionalscreedfloorconstruction#TraditionalScreedForBuilding
0 notes
Text
Holland Build Limited Screed in Milton Keynes
[fusion_text] Holland Build Limited have a long established working relationship with Speed Screed, and it is always a pleasure to do business with them. The latest project was on the Furzton Lake Business Park, Furzton, Milton Keynes
The specification on the project was for a traditional sand and cement screed, mixed on site using a Putzmeister M760with skip and scarper. The skip and…
View On WordPress
0 notes