Construction Of Bitumen Bound Macadam for Strengthening of Road Pavement
Tumblr media
#One of the biggest economic reasons for installing macadam bitumen in pavement construction is to save the old base. This paper describes th#the BBM layer can traditionally be placed over the existing asphalt layer. The manufacturing technology of a single layer of BBM is similar#the BBM layer still has superior performance and rideability. It is anticipated that precoating 12 mm size aggregates in future variants of#WBM#and BUSG.#When choosing the type of pavement on a particular section of road#a careful study should be made of the amount and type of traffic currently moving on that road and the likely increase in the coming years.#asphalt macadam is a very economical pavement to use. If it is a newer category#the question arises whether some other types of pavements will not be as economical. A well-compacted gravel or stone surface that has been#and this value can be preserved by laying a bituminous macadam.#With the use of graders#wheel scoops#drag scoops#or wagons#bars#shoulders#and trenches must be brought to the correct cross-section and conform to the base class#providing for drainage as required. Like many other types#shoulders must be built on a macadam asphalt road before the pavement is placed. M Any asphalt macadam road built with very few berms. Much#a 5- to 6-foot-wide slope at 2 inches per foot#and a flat slope of about 4 to 1 in the ditch. The old base should be reinforced and leveled with a water-binding macadam or at least patch#as better results will be obtained in the finished surface if the top surface is of equal thickness in all places. The specifications for l#Asphalt must be applied inertly when dry#when the temperature is above 45°F and when the lowest temperature is above 32°F within eight hours. The coarse aggregate should be disturb#The rough cover (keystone) should be carefully piled with Bermuda mite before the coarse stone is laid. It shall meet the specifications re#with not more than 5 percent placed at 1 y. inch screen#should maintain 70 to 100 percent on y-inch screens and should not exceed 15 percent on y2-inch openings#Immediately after application#the bituminous material should be spread evenly over the surface with a cover material sufficiently coarse to prevent the bituminous materi#the scroll should move quickly. If it is too hot
0 notes