We Are Hiring (1). ELECTRICAL ENGINEER (2). WIREMAN ENGINEER Note. It is necessary to have ITI from Wireman and Electrical Trade. Candidates having 0 to 4 years of experience can apply. Candidates should be from Uttarakhand state only Jai Hind Regards Team Sustainable Himalayas https://dysun.in/ https://sustainablehimalayas.in/ Mail :[email protected]
We are Hiring
0 notes
Text
solar plant features
Solar Power Plant with multiple features 1- Renewable Energy Source 2- Reduces Electricity Bills 3- Low Maintenance Cost Jai Hind Regards
Team
Sustainable Himalayas
https://dysun.in/
https://sustainablehimalayas.in/
Mail :[email protected]
@followers #dysunsolar #sustainablehimalayas #saurkauthag #solarpowerplant #ongridsolar #haldwanicity #subsidy #tehri #india #Doiwala #rishikesh #dehradun #kashipur #haridwar
0 notes
Text
Mukhayamantri Saur Swarojgar Yojana (MSSY)
Mukhayamantri Saur Swarojgar Yojana (MSSY)
A hearty greeting to the people of Uttarakhand from the Sustainable Himalayas family. People of the state, as you know, you can earn from Rs. 10,000 to Rs. 1,30,000 per month by installing a solar print un der the Mukhayamantri Saur Swarojgar Yojana (MSSY). Under this scheme, you will get a subsidy of 50% to 20% as per your area from the Ministry of Small and Medium Enterprises (MSME) as well as the facility of loan at low interest. Under this scheme, you are informed that the Sustainable Himalayas organization has been continuously working for the last 5 years to build smart villages in Uttarakhand, Himachal Pradesh, Jammu and the North Eastern states.
In this series, under the Sustainable Himalaya Uttarakhand State Solar Policy, any young entrepreneur, industrialist, who wants to set up his own solar plant or captive solar plant or rooftop solar plant, can join our organization today and earn a monthly income of Rs. 10,000 to Rs. 1,30,000 by setting up a solar plant of 20 KW to 200 KW on his land or leased land and selling the electricity produced to the state government enterprise UPCL. Under this scheme, the government will make a Power Purchase Agreement with you for 25 years and will pay you at the rate of Rs. 4.64 per unit.
Main points of Mukhayamantri Saur Swarojgar Yojana (MSSY):-
Under this Mukhayamantri Saur Swarojgar Yojana (MSSY), you can set up solar plants of 20 KW, 25 KW, 50 KW, 100 KW, 150 KW, 200 KW.
Maximum 200 kW per family You can install solar power plant of capacity upto 100 KW only
Only permanent residents of Uttarakhand will be eligible to apply under this Mukhayamantri Saur Swarojgar Yojana (MSSY). Technical standards for the scheme 1. Land required 250-300 Wm for 25 KW, 750-1000 Wm for 50 KW, 1500-2000 Wm for 100 KW, 3000-4000 Wm for 200 KW shadowless land will be required 2. Estimated power generation From a 25 KW power plant, you will generate electricity worth Rs. 1,76,320 per year, from a 50 KW power plant, you will generate electricity worth Rs. 3,52,640 per year, from a 100 KW power plant, you will generate electricity worth Rs. 7,05,280 per year
At present, the power line has been installed by Uttarakhand Electricity Department at the rate of 4.64 per unit, 11 KVA power line has been installed by UPCL under the 100 kW to 200 kW capacity scheme, the maximum aerial distance from the transformer in the mountainous range of the Pacific provinces will be 300 meters and in the plain areas the maximum aerial distance will be 100 m, the Sukhshamu and Medium Enterprises(MSME) Ministry is giving grants ranging from 50% to 20% under the minimum written table, interest subsidy, small cost, other things to note, the landlord cannot legalize the ownership of his Apollo Power Plant to anyone else without the permission of UREDA,
the application for proprietorship will be accepted only as a proprietorship, the date of project share, within thirty days, the landlord will get group kill twenty thousand rupees on WhatsApp, Sukhshamu kid watt eight thousand rupees and two thousand kilowatt development One rupee in UREDA Project Karle in the form of FD or CDR which will be in the form of NFT or Demand Draft as given below 20 to 25 kW, Rs. 500 amount 50 to 100 kW, Rs. 2,000 amount 100 to 200 kW, Rs. 5,000 amount Scheme Order Documents.
For registration of this scheme, the applicant has to apply for the following documents Applicant’s Aadhar Card, PAN Card, copy of front page of passbook account details, mobile number, mail details, land details, copy of lease agreement also has to be submitted. Why only from our organization? Our organization has experience of setting up innovative plants from 3 kW to 250 kW in the previous years. In which we have included Mukhayamantri Saur Swarojgar Yojana (MSSY) in East Uttarakhand in many district and Surya Rooftop Yojana in Suryodaya Planned Places in entire Uttarakhand.
How to apply?
Alternatively, you can apply directly from the Uttarakhand government website www.mssy.uk.in. Or you can contact the team member of Sustainable Himalayas and submit your application. To apply, you can contact on the given number. For more information you can contact:- 7455853737, 9810075920
Name:- Abhilash Rana
Designation:- IT
Social Media:-
Website:- https://dysun.in/
0 notes
Text
PM Surya Ghar Mufth Bijili Yojana
Our Installation at Bhaniywala, Dehradun, Uttarakhand
Name of Project: Sustainable HousinG Project
Name of Client: Bachan Singh
Capacity of Roof Top Solar Power Plant: 3 KW
Capital Cost of Solar Power Plant: INR 190000.00
Subsidy from Ministry of New & Renewable Energy (MNRE)-INR 136800.00
Cost of Project After Subsidy: INR 53200.00
Saving in Electricity/Month: INR 2023.00
Payback Period: 3 Years 3 Month
Saving in Carbon Emission by the Solar Power Plant till the life time : 87480 Kg Co2
Description: Mr. Bachan & Family from Uttarakhand has installed 3 Kw on Grid solar power plant under the Solar Roof Top-Phase 2 Program of MNRE .They are producing aprx 360 Kwh energy every month and saving aprx INR 24408/Year electricity bills from the solar power plant by exporting the energy to the grid. Their neighbors are also learning from them how to make sustainable house. Mr Bachan & Family is the perfect example for other families who are more conscious about energy conservation.
Thanks Mr. Bachan & Family for choosing green energy.
Cheers!!!!
Jai Hind
Regards
Team
Sustainable Himalayas
https://dysun.in/
https://sustainablehimalayas.in/
Mail :[email protected] #dysunsolar #sustainablehimalayas #dysun #mnre #solarpower #subsidy #solarenergy #solarpowerplant #dehradun #uttarakhand #energyconservation #himachal #dehradun #greenenergy #solarpower #ongridsolar #instadaily #india #dysunsolar #haldwanicity #rudrapur #rishikesh #dehradun #tehri #chandigarh #pinjore #doiwala #haridwar #roorkee #shimla
0 notes
Text
Solar Energy
Our Installation at Kotdwar, Pauri Garhwal, Uttarakhand
Name of Project: Sustainable HousinG Project
Name of Client: Karan Singh
Capacity of Roof Top Solar Power Plant: 3 KW
Capital Cost of Solar Power Plant: INR 190000.00
Subsidy from Ministry of New & Renewable Energy (MNRE)-INR 136800.00
Cost of Project After Subsidy: INR 53200.00
Saving in Electricity/Month: INR 2023.00
Payback Period: 3 Years 3 Month
Saving in Carbon Emission by the Solar Power Plant till the life time : 87480 Kg Co2
Description: Mr. Karan & Family from Uttarakhand has installed 3 Kw on Grid solar power plant under the Solar Roof Top-Phase 2 Program of MNRE .They are producing aprx 360 Kwh energy every month and saving aprx INR 24408/Year electricity bills from the solar power plant by exporting the energy to the grid. Their neighbors are also learning from them how to make sustainable house. Mr Karan & Family is the perfect example for other families who are more conscious about energy conservation.
Thanks Mr. Karan & Family for choosing green energy.
Cheers!!!!
Jai Hind
Regards
Team
Sustainable Himalayas
Mail :[email protected] #dysunsolar #sustainablehimalayas #dysun #mnre #solarpower #subsidy
0 notes
Text
Solar Energy
Our Installation at Kotdwar, Pauri Garhwal, Uttarakhand
Name of Project: Sustainable HousinG Project
Name of Client: Kamlesh Chandra
Capacity of Roof Top Solar Power Plant: 3 KW
Capital Cost of Solar Power Plant: INR 190000.00
Subsidy from Ministry of New & Renewable Energy (MNRE)-INR 136800.00
Cost of Project After Subsidy: INR 53200.00
Saving in Electricity/Month: INR 2023.00
Payback Period: 3 Years 3 Month
Saving in Carbon Emission by the Solar Power Plant till the life time : 87480 Kg Co2
Description: Mr. Chandra & Family from Uttarakhand has installed 3 Kw on Grid solar power plant under the Solar Roof Top-Phase 2 Program of MNRE .They are producing aprx 360 Kwh energy every month and saving aprx INR 24408/Year electricity bills from the solar power plant by exporting the energy to the grid. Their neighbors are also learning from them how to make sustainable house. Mr Chandra & Family is the perfect example for other families who are more conscious about energy conservation.
Thanks Mr. Chandra & Family for choosing green energy.
Cheers!!!!
Jai Hind
Regards
Team
Sustainable Himalayas
Mail :[email protected] #dysunsolar #sustainablehimalayas #dysun #mnre #solarpower #subsidy
0 notes
Text
BIFACIAL SOLAR PANEL
BIFACIAL SOLAR PANEL
As you can see, nowadays new technology has emerged in the solar market. Bifacial solar panel is in great demand, this panel generates electricity from both sides, nowadays this panel is being used a lot, let's know what is bifacial solar panel?
Bifacial solar panels are a type of photovoltaic technology designed to capture sunlight from both the front and back sides of the panel. Unlike traditional monofacial panels that only use sunlight falling on their front surface, bifacial panels can generate electricity from both direct sunlight and sunlight reflected from surrounding surfaces, such as ground, water or roofs. This dual surface energy capture can increase overall energy production by 30-40% depending on factors such as the reflectivity (known as albedo) of the surface beneath the panel and the installation angle.
The construction of bifacial panels typically has glass on both the front and back, which makes them more durable and allows for better light transmission. The back side of the panel is designed to absorb reflected light, often enhanced with advanced technologies such as PERC (passivated emitter and rear cell), which improves cell efficiency by minimizing energy loss. This design innovation provides improved performance in high reflectivity environments, such as snowy areas or shiny surfaces such as concrete.
Bifacial panels are often used in ground-mounted solar installations, where the reflective surface on the underside of the panels can be optimized to reflect maximum sunlight. They can also be combined with solar tracking systems, which adjust the angle of the panels to follow the path of the sun, further increasing their efficiency. While bifacial panels are more expensive upfront than conventional panels, the increased energy yield can result in greater long-term benefits, especially in large-scale solar farms or commercial applications. As renewable energy technologies advance, bifacial solar panels represent a promising development for increasing the efficiency and sustainability of solar power generation.
If you also want to install a bifacial solar plant in your home, then today the government has launched 2 big schemes for the public related to solar. Under the Mukhyamantri Solar Swarojgar Yojana (MSSY), solar power plants ranging from 2000 kW to 2000 kW are being installed in which the government is giving subsidy of more than 50% and under the Pm Surya Ghar Mufth Bijili Yojana, a subsidy of Rs 136800 is being given for 300 kW to 10 kW. Book today and take advantage of this scheme.
0 notes
Text
solar energy
Our Installation at Srinagar, Pauri Garhwal, Uttarakhand
Name of Project: Sustainable HousinG Project
Name of Client: Damyanti Nautiyal
Capacity of Roof Top Solar Power Plant: 3 KW
Capital Cost of Solar Power Plant: INR 190000.00
Subsidy from Ministry of New & Renewable Energy (MNRE)-INR 136800.00
Cost of Project After Subsidy: INR 53200.00
Saving in Electricity/Month: INR 2023.00
Payback Period: 3 Years 3 Month
Saving in Carbon Emission by the Solar Power Plant till the life time : 87480 Kg Co2
Description: Mrs. Nautiyal & Family from Uttarakhand has installed 3 Kw on Grid solar power plant under the Solar Roof Top-Phase 2 Program of MNRE .They are producing aprx 360 Kwh energy every month and saving aprx INR 24408/Year electricity bills from the solar power plant by exporting the energy to the grid. Their neighbors are also learning from them how to make sustainable house. Mrs Nautiyal & Family is the perfect example for other families who are more conscious about energy conservation.
Thanks Mrs. Nautiyal & Family for choosing green energy.
Cheers!!!!
Jai Hind
Regards
Team
Sustainable Himalayas
Mail :[email protected] #dysunsolar #sustainablehimalayas #dysun #mnre #solarpower #subsidy
0 notes
Text
solar energy
Our Installation at Srinagar, Pauri Garhwal, Uttarakhand
Name of Project: Sustainable HousinG Project
Name of Client: Baldev Singh Bisht
Capacity of Roof Top Solar Power Plant: 3 KW
Capital Cost of Solar Power Plant: INR 190000.00
Subsidy from Ministry of New & Renewable Energy (MNRE)-INR 136800.00
Cost of Project After Subsidy: INR 53200.00
Saving in Electricity/Month: INR 2023.00
Payback Period: 3 Years 3 Month
Saving in Carbon Emission by the Solar Power Plant till the life time : 87480 Kg Co2
Description: Mr. Bisht & Family from Uttarakhand has installed 3 Kw on Grid solar power plant under the Solar Roof Top-Phase 2 Program of MNRE .They are producing aprx 360 Kwh energy every month and saving aprx INR 24408/Year electricity bills from the solar power plant by exporting the energy to the grid. Their neighbors are also learning from them how to make sustainable house. Mr Bisht & Family is the perfect example for other families who are more conscious about energy conservation.
Thanks Mr. Bisht & Family for choosing green energy.
Cheers!!!!
Jai Hind
Regards
Team
Sustainable Himalayas
Mail :[email protected] #dysunsolar #sustainablehimalayas #dysun #mnre #solarpower #subsidy #solarenergy #solarpowerplant #dehradun #uttarakhand #energyconservation #himachal #dehradun #greenenergy #solarpower #ongridsolar #instadaily #india #dysunsolar #haldwanicity #rudrapur #rishikesh #dehradun #tehri #chandigarh #pinjore #doiwala #haridwar #roorkee #shimla
0 notes
Text
Solar Energy
Our Installation at Srinagar, Pauri Garhwal, Uttarakhand
Name of Project: Sustainable HousinG Project
Name of Client: Himanshu Nautiyal
Capacity of Roof Top Solar Power Plant: 3 KW
Capital Cost of Solar Power Plant: INR 190000.00
Subsidy from Ministry of New & Renewable Energy (MNRE)-INR 136800.00
Cost of Project After Subsidy: INR 53200.00
Saving in Electricity/Month: INR 2023.00
Payback Period: 3 Years 3 Month
Saving in Carbon Emission by the Solar Power Plant till the life time : 87480 Kg Co2
Description: Mr. Nautiyal & Family from Uttarakhand has installed 3 Kw on Grid solar power plant under the Solar Roof Top-Phase 2 Program of MNRE .They are producing aprx 360 Kwh energy every month and saving aprx INR 24408/Year electricity bills from the solar power plant by exporting the energy to the grid. Their neighbors are also learning from them how to make sustainable house. Mr Nautiyal & Family is the perfect example for other families who are more conscious about energy conservation.
Thanks Mr. Nautiyal & Family for choosing green energy.
Cheers!!!!
Jai Hind
Regards
Team
Sustainable Himalayas
Mail :[email protected] #dysunsolar #sustainablehimalayas #dysun #mnre #solarpower #subsidy #solarenergy #solarpowerplant #dehradun #uttarakhand #energyconservation #himachal #dehradun #greenenergy #solarpower #ongridsolar #instadaily #india #dysunsolar #haldwanicity #rudrapur #rishikesh #dehradun #tehri #chandigarh #pinjore #doiwala #haridwar #roorkee #shimla
0 notes
Text
solar energy
Our Installation at Gumaniywala, Rishikesh, Uttarakhand
Name of Project: Sustainable Housing Project
Name of Client: Bijendra Singh
Capacity of Roof Top Solar Power Plant: 4 KW
Capital Cost of Solar Power Plant: INR 240000.00
Subsidy from Ministry of New& Renewable Energy(MNRE)-INR 136800.00
Cost of Project After Subsidy: INR 103200.00
Saving in Electricity/Month: INR 3000.00
Payback Period: 4Years
Saving in Carbon Emission by the Solar Power Plant till the life time : 116000 Kg Co2
Description: Mrs Bijendra & Family from , Uttarakhand has installed 4 Kw on Grid solar power plant under the Solar Roof Top-Phase 2 Program of MNRE .They are producing aprx 480 Kwh energy every month and saving aprx INR 32544/Year electricity bills from the solar power plant by exporting the energy to the grid. Their neighbors are also learning from them how to make sustainable house. Mrs Bijendra & Family is the perfect example for other families who are more conscious about energy conservation.
Thanks Mrs. Bijendra & Family for choosing green energy.
Cheers!!!!
Jai Hind
Regards
Team
Sustainable Himalayas
Mail :[email protected] #dysunsolar #sustainablehimalayas #dysun #mnre #solarpower #subsidy #solarenergy #solarpowerplant #dehradun #uttarakhand #energyconservation #himachal #dehradun #greenenergy #solarpower #ongridsolar #instadaily #india #dysunsolar #haldwanicity #rudrapur #rishikesh #dehradun #tehri #chandigarh #pinjore #doiwala #haridwar #roorkee #shimla
0 notes
Text
Our Installation at Arcadia Grant, Dehradun, Uttarakhand
Name of Project: Sustainable HousinG Project
Name of Client: Sanjay Kumar
Capacity of Roof Top Solar Power Plant: 3 KW
Capital Cost of Solar Power Plant: INR 180000.00
Subsidy from Ministry of New & Renewable Energy (MNRE)-INR 136800.00
Cost of Project After Subsidy: INR 43200.00
Saving in Electricity/Month: INR 2023.00
Payback Period: 3 Years 3 Month
Saving in Carbon Emission by the Solar Power Plant till the life time : 87480 Kg Co2
Description: Mr. Kumar & Family from Uttarakhand has installed 3 Kw on Grid solar power plant under the Solar Roof Top-Phase 2 Program of MNRE .They are producing aprx 360 Kwh energy every month and saving aprx INR 24408/Year electricity bills from the solar power plant by exporting the energy to the grid. Their neighbors are also learning from them how to make sustainable house. Mr Kumar & Family is the perfect example for other families who are more conscious about energy conservation.
Thanks Mr. Kumar & Family for choosing green energy.
Cheers!!!!
Jai Hind
Regards
Team
Sustainable Himalayas
Mail :[email protected]
0 notes
Text
Our Installation at Haripur, Rishikesh, Uttarakhand
Name of Project: Sustainable HousinG Project
Name of Client: Kamla Devi
Capacity of Roof Top Solar Power Plant: 3 KW
Capital Cost of Solar Power Plant: INR 180000.00
Subsidy from Ministry of New & Renewable Energy (MNRE)-INR 136800.00
Cost of Project After Subsidy: INR 43200.00
Saving in Electricity/Month: INR 2023.00
Payback Period: 3 Years 3 Month
Saving in Carbon Emission by the Solar Power Plant till the life time : 87480 Kg Co2
Description: Mrs. Kamla & Family from Uttarakhand has installed 3 Kw on Grid solar power plant under the Solar Roof Top-Phase 2 Program of MNRE .They are producing aprx 360 Kwh energy every month and saving aprx INR 24408/Year electricity bills from the solar power plant by exporting the energy to the grid. Their neighbors are also learning from them how to make sustainable house. Mrs Kamla & Family is the perfect example for other families who are more conscious about energy conservation.
Thanks Mrs. Kamla & Family for choosing green energy.
Cheers!!!!
Jai Hind
Regards
Team
Sustainable Himalayas
Mail :[email protected] #dysunsolar
0 notes
Text
solar energy
Our Installation at Gupthkashi, Rudrhprayag, Uttarakhand
Name of Project: Sustainable HousinG Project
Name of Client: Prem Lal
Capacity of Roof Top Solar Power Plant: 3 KW
Capital Cost of Solar Power Plant: INR 180000.00
Subsidy from Ministry of New & Renewable Energy (MNRE)-INR 136800.00
Cost of Project After Subsidy: INR 43200.00
Saving in Electricity/Month: INR 2023.00
Payback Period: 3 Years 3 Month
Saving in Carbon Emission by the Solar Power Plant till the life time : 87480 Kg Co2
Description: Mr. Prem Lal & Family from Uttarakhand has installed 3 Kw on Grid solar power plant under the Solar Roof Top-Phase 2 Program of MNRE .They are producing aprx 360 Kwh energy every month and saving aprx INR 24408/Year electricity bills from the solar power plant by exporting the energy to the grid. Their neighbors are also learning from them how to make sustainable house. Mr Prem Lal & Family is the perfect example for other families who are more conscious about energy conservation.
Thanks Mr. Prem Lal & Family for choosing green energy.
Cheers!!!!
Jai Hind
Regards
Team
Sustainable Himalayas
https://dysun.in/
https://sustainablehimalayas.in/
Mail :[email protected] #dysunsolar
0 notes
Text
Solar Energy
Our Installation at Kotdwar, Pauri Garhwal, Uttarakhand
Name of Project: Sustainable HousinG Project
Name of Client: Kirti Kukreti
Capacity of Roof Top Solar Power Plant: 3 KW
Capital Cost of Solar Power Plant: INR 180000.00
Subsidy from Ministry of New & Renewable Energy (MNRE)-INR 136800.00
Cost of Project After Subsidy: INR 43200.00
Saving in Electricity/Month: INR 2023.00
Payback Period: 3 Years 3 Month
Saving in Carbon Emission by the Solar Power Plant till the life time : 87480 Kg Co2
Description: Mrs. Kukreti & Family from Uttarakhand has installed 3 Kw on Grid solar power plant under the Solar Roof Top-Phase 2 Program of MNRE .They are producing aprx 360 Kwh energy every month and saving aprx INR 24408/Year electricity bills from the solar power plant by exporting the energy to the grid. Their neighbors are also learning from them how to make sustainable house. Mrs Kukreti & Family is the perfect example for other families who are more conscious about energy conservation.
Thanks Mrs. Kukreti & Family for choosing green energy.
Cheers!!!!
Jai Hind
Regards
Team
Sustainable Himalayas
Mail :[email protected] #dysunsolar #sustainablehimalayas #dysun #mnre #solarpower #subsidy #solarenergy #solarpowerplant #dehradun #uttarakhand #energyconservation #himachal #dehradun #greenenergy #solarpower #ongridsolar #instadaily #india #dysunsolar #haldwanicity #rudrapur #rishikesh #dehradun #tehri #chandigarh #pinjore #doiwala #haridwar #roorkee #shimla
1 note
·
View note
Text
Our installation
Our Installation at Srinagar, Pauri Garhwal, Uttarakhand
Name of Project: Sustainable HousinG Project
Name of Client: Govind Singh
Capacity of Roof Top Solar Power Plant: 3 KW
Capital Cost of Solar Power Plant: INR 180000.00
Subsidy from Ministry of New & Renewable Energy (MNRE)-INR 136800.00
Cost of Project After Subsidy: INR 43200.00
Saving in Electricity/Month: INR 2023.00
Payback Period: 3 Years 3 Month
Saving in Carbon Emission by the Solar Power Plant till the life time : 87480 Kg Co2
Description: Mr. Govind & Family from Uttarakhand has installed 3 Kw on Grid solar power plant under the Solar Roof Top-Phase 2 Program of MNRE .They are producing aprx 360 Kwh energy every month and saving aprx INR 24408/Year electricity bills from the solar power plant by exporting the energy to the grid. Their neighbors are also learning from them how to make sustainable house. Mr Govind & Family is the perfect example for other families who are more conscious about energy conservation.
Thanks Mr. Govind & Family for choosing green energy.
Cheers!!!!
Jai Hind
Regards
Team
Sustainable Himalayas
Mail :[email protected] #dysunsolar #sustainablehimalayas #dysun #mnre #solarpower #subsidy
0 notes