Solar Plant
Our Installation at Kotdwar, Pauri Garhwal, Uttarakhand
Name of Project: Sustainable HousinG Project
Name of Client: Ramesh Badola
Capacity of Roof Top Solar Power Plant: 3 KW
Capital Cost of Solar Power Plant: INR 195000.00
Subsidy from Ministry of New & Renewable Energy (MNRE)-INR 136800.00
Cost of Project After Subsidy: INR 58200.00
Saving in Electricity/Month: INR 2023.00
Payback Period: 3 Years 3 Month
Saving in Carbon Emission by the Solar Power Plant till the life time : 87480 Kg Co2
Description: Mr. Badola & Family from Uttarakhand has installed 3 Kw on Grid solar power plant under the Solar Roof Top-Phase 2 Program of MNRE .They are producing aprx 360 Kwh energy every month and saving aprx INR 24408/Year electricity bills from the solar power plant by exporting the energy to the grid. Their neighbors are also learning from them how to make sustainable house. Mr Badola & Family is the perfect example for other families who are more conscious about energy conservation.
Thanks Mr. Badola & Family for choosing green energy.
Cheers!!!!
Jai Hind
Regards
Team
Sustainable Himalayas
Mail :[email protected]
#dysunsolar #sustainablehimalayas #dysun #mnre #solarpower
0 notes
Text
PM Surya Ghar Yojana
प्रधानमंत्री सूर्य घर मुफ्त बिजली योजना के अन्तर्गत अपने घरों की छतों पर मात्र रुपए 23200* में 3 kw क्षमता का सोलर रूफ टॉप पॉवर प्लांट लगाएं और अपने बिजली के बिलों में 2000 रुपए प्रति माह बचाएं!
3 kw के प्लांट में जिसमे रूपए 136800 की सब्सिडी दी जा रही है!ज्यादा जानकारी के लिए हमारे सोलर एक्सपर्ट की सलाह लें :- +91-70176 51730
Jai Hind
Regards
Team
Sustainable Himalayas
Mail :[email protected]
@followers #dysunsolar #sustainablehimalayas #solarpowerplant
#doiwala#dehradun#dysunsolar#haridwar#solarenergy#solarpowerplant#subsidy#uttarakhand#solarpower#across the spiderverse
0 notes
Text
Solar Energy
Our Installation at Kotdwar, Pauri Garhwal, Uttarakhand
Name of Project: Sustainable HousinG Project
Name of Client: Geeta Rawat
Capacity of Roof Top Solar Power Plant: 3 KW
Capital Cost of Solar Power Plant: INR 195000.00
Subsidy from Ministry of New & Renewable Energy (MNRE)-INR 136800.00
Cost of Project After Subsidy: INR 58200.00
Saving in Electricity/Month: INR 2023.00
Payback Period: 3 Years 3 Month
Saving in Carbon Emission by the Solar Power Plant till the life time : 87480 Kg Co2
Description: Mrs. Rawat & Family from Uttarakhand has installed 3 Kw on Grid solar power plant under the Solar Roof Top-Phase 2 Program of MNRE .They are producing aprx 360 Kwh energy every month and saving aprx INR 24408/Year electricity bills from the solar power plant by exporting the energy to the grid. Their neighbors are also learning from them how to make sustainable house. Mrs Rawat & Family is the perfect example for other families who are more conscious about energy conservation.
Thanks Mrs. Rawat & Family for choosing green energy.
Cheers!!!!
Jai Hind
Regards
Team
Sustainable Himalayas
Mail :[email protected]
#dysunsolar #sustainablehimalayas #dysun #mnre #solarpower
0 notes
Text
Solar Power Plant
प्रधानमंत्री सूर्य घर मुफ्त बिजली योजना के अन्तर्गत अपने घरों की छतों पर 3 kw क्षमता का सोलर रूफ टॉप पॉवर प्लांट लगाएं और अपने बिजली के बिलों में 2000 रुपए प्रति माह बचाएं! 3 kw के प्लांट में जिसमे रूपए 136800 की सब्सिडी दी जा रही है!ज्यादा जानकारी के लिए हमारे सोलर एक्सपर्ट की सलाह लें :- +91-70176 51730 Jai Hind Regards Team Sustainable Himalayas https://dysun.in/ https://sustainablehimalayas.in/ Mail :[email protected] @followers #dysunsolar #sustainablehimalayas #solarpowerplant #ongridsolar #haldwanicity #subsidy #tehri #india #Doiwala #rishikesh #dehradun #kashipur #haridwar
0 notes
Text
Solar Energy
Our Installation at Srinagar, Pauri Garhwal, Uttarakhand
Name of Project: Sustainable HousinG Project
Name of Client: Kamal Singh Negi
Capacity of Roof Top Solar Power Plant: 3 KW
Capital Cost of Solar Power Plant: INR 195000.00
Subsidy from Ministry of New & Renewable Energy (MNRE)-INR 136800.00
Cost of Project After Subsidy: INR 58200.00
Saving in Electricity/Month: INR 2023.00
Payback Period: 3 Years 3 Month
Saving in Carbon Emission by the Solar Power Plant till the life time : 87480 Kg Co2
Description: Mr. Negi & Family from Uttarakhand has installed 3 Kw on Grid solar power plant under the Solar Roof Top-Phase 2 Program of MNRE .They are producing aprx 360 Kwh energy every month and saving aprx INR 24408/Year electricity bills from the solar power plant by exporting the energy to the grid. Their neighbors are also learning from them how to make sustainable house. Mr Negi & Family is the perfect example for other families who are more conscious about energy conservation.
Thanks Mr. Negi & Family for choosing green energy.
Cheers!!!!
Jai Hind
Regards
Team
Sustainable Himalayas
Mail :[email protected] #dysunsolar #sustainablehimalayas #dysun #mnre #solarpower #subsidy
0 notes
Text
Best Solar Company in UP
Top Solar Company in Uttar Pradesh
Uttar Pradesh, one of the largest and most populous states in India, has focused more on adopting renewable energy solutions in recent years. Among the various options, solar energy has attracted significant attention due to its environmental benefits and abundant sunlight in the state. Are you looking for the top solar company in Uttar Pradesh, then the top solar company in Uttar Pradesh is DYSUN SOLAR which is a leading brand of solar. DYSUN SOLAR company in Uttar Pradesh are playing a vital role in this transformation, providing a range of services such as solar panel installation, maintenance and development of large-scale solar projects. These companies are contributing to the state's energy sustainability goals and helping reduce dependence on traditional fossil fuels.
Solar Power Growth in Uttar Pradesh
Uttar Pradesh, with its vast geographical expanse and large population, holds immense potential for solar energy. The state government has set ambitious renewable energy targets under its "Uttar Pradesh Solar Policy" to effectively harness the sun's energy. In recent years, Uttar Pradesh has been making progress in increasing its solar power capacity, aiming to install over 35,000 MW of solar power by 2027. This ambition has created opportunities for solar companies to flourish in the region. These companies focus on rooftop solar power installations for residential and commercial customers as well as large-scale solar farms.
Best Solar Company in UP
As you know, India is growing very fast in solar power. Solar work is going on very fast in every state of India. Uttar Pradesh is one of the largest states of India in terms of population. If you are also from Uttar Pradesh and you are looking for the best solar company in UP, then you will not find a better company than Dysun Solar. We are the best solar company in UP. Our company is full of good service, good products etc.
Our Products
On-grid Solar Power Plant
Off-Grid Solar Power Plant
Hygrid Solar Power Plant
Dysun Solar Water Heater
Earthing Kit
Street Light
Anti Scale Kit
Our Contribution to Uttar Pradesh's Energy Goals
Dysun Solar is helping Uttar Pradesh achieve its renewable energy goals. By increasing the adoption of solar energy, they are not only promoting green energy but also helping create jobs in the region. The Uttar Pradesh government has introduced several incentives and policies such as subsidies for residential and commercial solar installations to encourage solar adoption. These companies are also working with the state government and private entities to develop large-scale solar parks and power generation projects, which will further boost the state's solar potential.
In conclusion, the solar energy industry in Uttar Pradesh is experiencing rapid growth, with several companies taking the lead in providing sustainable and cost-effective solar solutions. With the support of the state, the growing demand for renewable energy, and the technical expertise of these companies, solar energy is set to play a major role in transforming Uttar Pradesh's energy landscape.
Blogger Profile:-
Name- Abhilash Rana
Description- My name is Abhilash Rana, I work in SEO in DYSUN SOLAR , I have written an article on Best Solar Company in Uttar Pradesh
Social Media -
Website- https://dysun.in/
0 notes
Text
Solar Energy
Our Installation at Balawala, Dehradun, Uttarakhand
Name of Project: Sustainable HousinG Project
Name of Client: Kusum Nautiyal
Capacity of Roof Top Solar Power Plant: 3 KW
Capital Cost of Solar Power Plant: INR 195000.00
Subsidy from Ministry of New & Renewable Energy (MNRE)-INR 136800.00
Cost of Project After Subsidy: INR 58200.00
Saving in Electricity/Month: INR 2023.00
Payback Period: 3 Years 3 Month
Saving in Carbon Emission by the Solar Power Plant till the life time : 87480 Kg Co2
Description: Mrs. Kusum & Family from Uttarakhand has installed 3 Kw on Grid solar power plant under the Solar Roof Top-Phase 2 Program of MNRE .They are producing aprx 360 Kwh energy every month and saving aprx INR 24408/Year electricity bills from the solar power plant by exporting the energy to the grid. Their neighbors are also learning from them how to make sustainable house. Mrs Kusum & Family is the perfect example for other families who are more conscious about energy conservation.
Thanks Mrs. Kusum & Family for choosing green energy.
Cheers!!!!
Jai Hind
Regards
Team
Sustainable Himalayas
Mail :[email protected]
0 notes
Text
Solar Power Plant
Our Installation at Chinyalisaur, Uttarkashi, Uttarakhand
Name of Project: Sustainable HousinG Project
Name of Client: Rajni Devi
Capacity of Roof Top Solar Power Plant: 3 KW
Capital Cost of Solar Power Plant: INR 195000.00
Subsidy from Ministry of New & Renewable Energy (MNRE)-INR 136800.00
Cost of Project After Subsidy: INR 58200.00
Saving in Electricity/Month: INR 2023.00
Payback Period: 3 Years 3 Month
Saving in Carbon Emission by the Solar Power Plant till the life time : 87480 Kg Co2
Description: Mrs. Rajni & Family from Uttarakhand has installed 3 Kw on Grid solar power plant under the Solar Roof Top-Phase 2 Program of MNRE .They are producing aprx 360 Kwh energy every month and saving aprx INR 24408/Year electricity bills from the solar power plant by exporting the energy to the grid. Their neighbors are also learning from them how to make sustainable house. Mrs Rajni & Family is the perfect example for other families who are more conscious about energy conservation.
Thanks Mrs. Rajni & Family for choosing green energy.
Cheers!!!!
Jai Hind
Regards
Team
Sustainable Himalayas
Mail :[email protected] #dysunsolar #sustainablehimalayas #dysun #mnre #solarpower #subsidy
0 notes
Text
SOLAR DEALER
Become a dealer of Uttarakhand's most trusted solar equipment brand DYSUN SOLAR and make your site income. For more information call: - +91 70176 51730 Jai Hind Regards Team Sustainable Himalayas https://dysun.in/ https://sustainablehimalayas.in/ Mail :[email protected]
0 notes
Text
Solar Plant
Our Installation at Badrish Vihar, Dehradun, Uttarakhand
Name of Project: Sustainable HousinG Project
Name of Client: Asha Juyal
Capacity of Roof Top Solar Power Plant: 3 KW
Capital Cost of Solar Power Plant: INR 195000.00
Subsidy from Ministry of New & Renewable Energy (MNRE)-INR 136800.00
Cost of Project After Subsidy: INR 58200.00
Saving in Electricity/Month: INR 2023.00
Payback Period: 3 Years 3 Month
Saving in Carbon Emission by the Solar Power Plant till the life time : 87480 Kg Co2
Description: Mrs. Juyal & Family from Uttarakhand has installed 3 Kw on Grid solar power plant under the Solar Roof Top-Phase 2 Program of MNRE .They are producing aprx 360 Kwh energy every month and saving aprx INR 24408/Year electricity bills from the solar power plant by exporting the energy to the grid. Their neighbors are also learning from them how to make sustainable house. Mrs Juyal & Family is the perfect example for other families who are more conscious about energy conservation.
Thanks Mrs. Juyal & Family for choosing green energy.
Cheers!!!!
Jai Hind
Regards
Team
Sustainable Himalayas
https://sustainablehimalayas.in/
Mail :[email protected] #dysunsolar #sustainablehimalayas #dysun #mnre #solarpower #subsidy
0 notes
Text
Solar Plant
Our Installation at Kedarpur, Dehradun, Uttarakhand
Name of Project: Sustainable HousinG Project
Name of Client: Vinod Pal
Capacity of Roof Top Solar Power Plant: 3 KW
Capital Cost of Solar Power Plant: INR 195000.00
Subsidy from Ministry of New & Renewable Energy (MNRE)-INR 136800.00
Cost of Project After Subsidy: INR 58200.00
Saving in Electricity/Month: INR 2023.00
Payback Period: 3 Years 3 Month
Saving in Carbon Emission by the Solar Power Plant till the life time : 87480 Kg Co2
Description: Mr. Pal & Family from Uttarakhand has installed 3 Kw on Grid solar power plant under the Solar Roof Top-Phase 2 Program of MNRE .They are producing aprx 360 Kwh energy every month and saving aprx INR 24408/Year electricity bills from the solar power plant by exporting the energy to the grid. Their neighbors are also learning from them how to make sustainable house. Mr Pal & Family is the perfect example for other families who are more conscious about energy conservation.
Thanks Mr. Pal & Family for choosing green energy.
Cheers!!!!
Jai Hind
Regards
Team
Sustainable Himalayas
Mail: [email protected]
0 notes
Text
We Are Hiring (1). ELECTRICAL ENGINEER (2). WIREMAN ENGINEER Note. It is necessary to have ITI from Wireman and Electrical Trade. Candidates having 0 to 4 years of experience can apply. Candidates should be from Uttarakhand state only Jai Hind Regards Team Sustainable Himalayas https://dysun.in/ https://sustainablehimalayas.in/ Mail :[email protected]
We are Hiring
0 notes
Text
solar plant features
Solar Power Plant with multiple features 1- Renewable Energy Source 2- Reduces Electricity Bills 3- Low Maintenance Cost Jai Hind Regards
Team
Sustainable Himalayas
https://dysun.in/
https://sustainablehimalayas.in/
Mail :[email protected]
@followers #dysunsolar #sustainablehimalayas #saurkauthag #solarpowerplant #ongridsolar #haldwanicity #subsidy #tehri #india #Doiwala #rishikesh #dehradun #kashipur #haridwar
0 notes
Text
Mukhayamantri Saur Swarojgar Yojana (MSSY)
Mukhayamantri Saur Swarojgar Yojana (MSSY)
A hearty greeting to the people of Uttarakhand from the Sustainable Himalayas family. People of the state, as you know, you can earn from Rs. 10,000 to Rs. 1,30,000 per month by installing a solar print un der the Mukhayamantri Saur Swarojgar Yojana (MSSY). Under this scheme, you will get a subsidy of 50% to 20% as per your area from the Ministry of Small and Medium Enterprises (MSME) as well as the facility of loan at low interest. Under this scheme, you are informed that the Sustainable Himalayas organization has been continuously working for the last 5 years to build smart villages in Uttarakhand, Himachal Pradesh, Jammu and the North Eastern states.
In this series, under the Sustainable Himalaya Uttarakhand State Solar Policy, any young entrepreneur, industrialist, who wants to set up his own solar plant or captive solar plant or rooftop solar plant, can join our organization today and earn a monthly income of Rs. 10,000 to Rs. 1,30,000 by setting up a solar plant of 20 KW to 200 KW on his land or leased land and selling the electricity produced to the state government enterprise UPCL. Under this scheme, the government will make a Power Purchase Agreement with you for 25 years and will pay you at the rate of Rs. 4.64 per unit.
Main points of Mukhayamantri Saur Swarojgar Yojana (MSSY):-
Under this Mukhayamantri Saur Swarojgar Yojana (MSSY), you can set up solar plants of 20 KW, 25 KW, 50 KW, 100 KW, 150 KW, 200 KW.
Maximum 200 kW per family You can install solar power plant of capacity upto 100 KW only
Only permanent residents of Uttarakhand will be eligible to apply under this Mukhayamantri Saur Swarojgar Yojana (MSSY). Technical standards for the scheme 1. Land required 250-300 Wm for 25 KW, 750-1000 Wm for 50 KW, 1500-2000 Wm for 100 KW, 3000-4000 Wm for 200 KW shadowless land will be required 2. Estimated power generation From a 25 KW power plant, you will generate electricity worth Rs. 1,76,320 per year, from a 50 KW power plant, you will generate electricity worth Rs. 3,52,640 per year, from a 100 KW power plant, you will generate electricity worth Rs. 7,05,280 per year
At present, the power line has been installed by Uttarakhand Electricity Department at the rate of 4.64 per unit, 11 KVA power line has been installed by UPCL under the 100 kW to 200 kW capacity scheme, the maximum aerial distance from the transformer in the mountainous range of the Pacific provinces will be 300 meters and in the plain areas the maximum aerial distance will be 100 m, the Sukhshamu and Medium Enterprises(MSME) Ministry is giving grants ranging from 50% to 20% under the minimum written table, interest subsidy, small cost, other things to note, the landlord cannot legalize the ownership of his Apollo Power Plant to anyone else without the permission of UREDA,
the application for proprietorship will be accepted only as a proprietorship, the date of project share, within thirty days, the landlord will get group kill twenty thousand rupees on WhatsApp, Sukhshamu kid watt eight thousand rupees and two thousand kilowatt development One rupee in UREDA Project Karle in the form of FD or CDR which will be in the form of NFT or Demand Draft as given below 20 to 25 kW, Rs. 500 amount 50 to 100 kW, Rs. 2,000 amount 100 to 200 kW, Rs. 5,000 amount Scheme Order Documents.
For registration of this scheme, the applicant has to apply for the following documents Applicant’s Aadhar Card, PAN Card, copy of front page of passbook account details, mobile number, mail details, land details, copy of lease agreement also has to be submitted. Why only from our organization? Our organization has experience of setting up innovative plants from 3 kW to 250 kW in the previous years. In which we have included Mukhayamantri Saur Swarojgar Yojana (MSSY) in East Uttarakhand in many district and Surya Rooftop Yojana in Suryodaya Planned Places in entire Uttarakhand.
How to apply?
Alternatively, you can apply directly from the Uttarakhand government website www.mssy.uk.in. Or you can contact the team member of Sustainable Himalayas and submit your application. To apply, you can contact on the given number. For more information you can contact:- 7455853737, 9810075920
Name:- Abhilash Rana
Designation:- IT
Social Media:-
Website:- https://dysun.in/
0 notes
Text
PM Surya Ghar Mufth Bijili Yojana
Our Installation at Bhaniywala, Dehradun, Uttarakhand
Name of Project: Sustainable HousinG Project
Name of Client: Bachan Singh
Capacity of Roof Top Solar Power Plant: 3 KW
Capital Cost of Solar Power Plant: INR 190000.00
Subsidy from Ministry of New & Renewable Energy (MNRE)-INR 136800.00
Cost of Project After Subsidy: INR 53200.00
Saving in Electricity/Month: INR 2023.00
Payback Period: 3 Years 3 Month
Saving in Carbon Emission by the Solar Power Plant till the life time : 87480 Kg Co2
Description: Mr. Bachan & Family from Uttarakhand has installed 3 Kw on Grid solar power plant under the Solar Roof Top-Phase 2 Program of MNRE .They are producing aprx 360 Kwh energy every month and saving aprx INR 24408/Year electricity bills from the solar power plant by exporting the energy to the grid. Their neighbors are also learning from them how to make sustainable house. Mr Bachan & Family is the perfect example for other families who are more conscious about energy conservation.
Thanks Mr. Bachan & Family for choosing green energy.
Cheers!!!!
Jai Hind
Regards
Team
Sustainable Himalayas
https://dysun.in/
https://sustainablehimalayas.in/
Mail :[email protected] #dysunsolar #sustainablehimalayas #dysun #mnre #solarpower #subsidy #solarenergy #solarpowerplant #dehradun #uttarakhand #energyconservation #himachal #dehradun #greenenergy #solarpower #ongridsolar #instadaily #india #dysunsolar #haldwanicity #rudrapur #rishikesh #dehradun #tehri #chandigarh #pinjore #doiwala #haridwar #roorkee #shimla
0 notes
Text
Solar Energy
Our Installation at Kotdwar, Pauri Garhwal, Uttarakhand
Name of Project: Sustainable HousinG Project
Name of Client: Karan Singh
Capacity of Roof Top Solar Power Plant: 3 KW
Capital Cost of Solar Power Plant: INR 190000.00
Subsidy from Ministry of New & Renewable Energy (MNRE)-INR 136800.00
Cost of Project After Subsidy: INR 53200.00
Saving in Electricity/Month: INR 2023.00
Payback Period: 3 Years 3 Month
Saving in Carbon Emission by the Solar Power Plant till the life time : 87480 Kg Co2
Description: Mr. Karan & Family from Uttarakhand has installed 3 Kw on Grid solar power plant under the Solar Roof Top-Phase 2 Program of MNRE .They are producing aprx 360 Kwh energy every month and saving aprx INR 24408/Year electricity bills from the solar power plant by exporting the energy to the grid. Their neighbors are also learning from them how to make sustainable house. Mr Karan & Family is the perfect example for other families who are more conscious about energy conservation.
Thanks Mr. Karan & Family for choosing green energy.
Cheers!!!!
Jai Hind
Regards
Team
Sustainable Himalayas
Mail :[email protected] #dysunsolar #sustainablehimalayas #dysun #mnre #solarpower #subsidy