#Accu bore directional drilling
Explore tagged Tumblr posts
Text
Accu bore directional drilling
#Accu bore directional drilling how to#
#Accu bore directional drilling install#
Horizontal directional drilling, or boring, is a trenchless method of installing pipeline safely and precisely underground simultaneously with the excavation process. could only measure borehole inclination but was more accu.
#Accu bore directional drilling how to#
“This contract will allow us to continue our support of the warfighters and families in the Southwest for years to come. As a trusted provider of innovative solutions for trenchless construction, Accu-Bore Directional knows how to leverage the right technology for the safe installation of utility infrastructure. wellbore (multilaterals) and drilling with wellbores having inclinations up to and exceeding. “Pond has designed, built and maintained quality petroleum systems throughout the world and is excited to share this experience in the Southwest,” Said Robohn. Types of projects may include, but are not limited to: fuel storage and distribution systems, cathodic protection systems, spill containment systems, and all ancillary natural gas and POL support facilities and structures to include emergency backup power systems, fire protection systems, and control systems for such facilities and structures. Diversified Project Services International (DPSI) and Accu-Bore Directional Drilling have strong Southwest experience, performance and capabilities that complement the engineering and construction capabilities of Pond.īesides natural gas, the scope of this contract includes new construction, renovation and repair of petroleum systems. Pond is thrilled to work with our California partners to provide responsive, flexible and local support in providing solutions to customer requirements. “This is a powerful team that stands ready to tackle any challenge in natural gas or petroleum systems in the Southwest, we have experience in cross-country transmission pipelines all the way down to the burner tip,” said Robohn. Oil and Gas Program Director Willie Robohn and team will provide all the needed engineering services and construction management in-house. Pond’s strong record of performance with natural gas infrastructure enables our team to quickly respond to clients with top-to-bottom integrated solutions.
#Accu bore directional drilling install#
This NAVFAC SW contract will provide Public Works Officers with the ability to quickly install or upgrade their natural gas infrastructure to ensure safe and efficient natural gas distribution. The contract provides for new construction, renovation, and repair of natural gas and Petroleum, Oils, and Lubricants (POL) fuel systems at various government installations located in California, Arizona, Nevada, Utah, Colorado, and New Mexico. Pond was recently awarded an Indefinite Delivery Indefinite Quantity (IDIQ), Multiple Award Construction Contract with Naval Facilities Engineering Command (NAVFAC) Southwest.
0 notes